HomeMy WebLinkAboutMFP18003516DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18003516
IVR Number: 18003516
Permit Informaon
Permit Name:Century Link Permits
Address/Locaon :06/28/2018Application Date:7227900093Parcel Number:2806 NE 10TH ST
Permit Type:07/11/2018Issue Date:Franchise
Permit Work Class:07/11/2019Expiration Date:Minor Utility
Job Number:N.370578.E.01Franchise Type:Telephone
Description:Transfer Century Link services from old pole to new pole already in place. Digging required. Restoration per City of
Renton standards.
Contacts
Name Address PhoneTypeBilling
C/O QWEST CORP 1801 CALIFORNIA ST #4600
Denver, CO 80202
Applicant
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Heather Binkly
Dycom Industries dba North Sky
11770 Us Hwy 1, SUITE 101
Palm Beach Gardens, FL 33408
B: (360) 254-6920
O: (360) 450-3287
Contractor
Business License Number: BL.036846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 7850 S TRAFTON St
TACOMA, WA 98409
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 2/1/2018
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 2/1/2018
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50.
Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00
per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street
☐Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
CenturyLink
N.370578.E.01 206-345-4476
Alex Harb alex.harb@centurylink.com
2806 NE 10th St Nat'l Foreign Pole Transfer
Transfer CenturyLink services from old utility poles to new foreign poles; digging required.
44
North Sky Communications, LLC 360.254.6920
NORTHSC857Q4 601-973-572
6/28/18
MFP18003516
Scott Warlick
Holly Powers 7/10/2018
7/10/2018
POLE TRANSFER OF CENTURYLINK FACILITIES FROM OLD POLES TO NEW FOREIGN POLES State: Washington Wire Center: RNTNWA01 Job #: N.370578.E.01 Address: 2806 NE 10th St Asset Tag: A3775241 Section: 8 Town: 23N Range: 5E Lat/Lon: 47.4993548333333, ‐122.179815833333 X=OLD POLE T=NEW FOREIGN POLE MFP18003516
N.370578.E.01: Transfer 2 Main cable attachments, 8 Aerial service wires, aerial strand mount terminal, 1 cross arm, 1 riser guard; Remove down guy, anchor, pole steps, Excavate and expose existing buried facilities; Install 2 cable tags, anchor, down guy and guy guard, 8ft of buried field copper; Splice 100PR connector to existing and new cable. MFP18003516
MFP18003516
MFP18003516
MFP18003516
MFP18003516
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
N.370578.E.01
North Sky Communications
Angee Ellis 360-254-6920 ext. 3641
22517 88th Ave South, Kent WA 253-653-2474
aellis@northskycomm.com
2806 NE 10th St
8a - 5p
7/16/18 - 7/30/18
Reset FormPrint Form
Simone Mann
Simone Mann Digitally signed by Simone Mann
DN: cn=Simone Mann, o=Osmose Utilities
Services, email=smann@osmose.com, c=US
Date: 2018.06.28 08:26:38 -04'00'
MFP18003516
9:00am - 3:30pm
Monday - Friday
Scott Warlick
7/10/2018
SKETCH
I
-- NORTH --
I
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
STOPSTOPSTOPSTOPST
O
PSTOP
Kirkland AVE NE Kirkland AVE NE NE 10th St
NE
1
0
t
h
S
t
N
E
1
0
t
h
S
t
350'20
0
'200'NE Sunset BLVDNE Sunset BLVDNE Sunset BLVDNE Sunset BLVDST
O
P
Sunset Ln NENE
1
0
t
h
S
t
N
E
1
0
t
h
S
t
Index AVE NE Private DriveJefferson AVE NEROAD
WORK
AHEADW20-1
SIDEWALK
CLOSEDR9-9
SIDEWALK
CLOSEDR9-9
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
X3
SIDEWALK
CLOSED
R9-9
SIDEWALK
CLOSED
R9-9
ROAD
WORK
AHEADW20-1
350'W1-4
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEADW20-1
ROAD
WORK
AHEAD W20-1200'200'
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
X3
CW1-4
Legend
Cone
CW1-4 reverse curve
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 No Parking R7-T39
SIDEWALK
CLOSED Sidewalk Closed
Spotter
W1-4 reverse curve
ROAD
WORK
AHEAD W20-1 Road Work Ahead
Work Area
Work truck
No impact to travel lane.
Place no parking signs 72
hours in advance.
Spotter to assist pedestrians.
N.370578.E.01:
Transfer 2 main cable attachments, 8 aerial
service wires, aerial strand mount terminal,
1 cross arm, 1 riser guard; Remove down guy, anchor,
pole steps, excavate and expose existing buried facilities;
install 2 cable tags, anchor, down guy and guy guard,
8ft of buried field copper; splice 100PR
connector to existing and new cable.
N.370585.E.01:
Transfer 1 main cable attachment,
3 aerial service wires, 1 riser guard; excavate
and expose existing buried facilities; splice
25PR connector to existing and new cable;
install cable tag.
Designed By:
CUSTOMER:
CONTACT:
LOCATION:
DATE: WO#
Julianna Johnson
WATCS 010346
425-252-0906 EXT: 5860
OSMOSE
Simone Mann
770-631-6969
2806 NE 10th St &
1013 Kirkland AVE NE
Renton WA
06-25-18
N.370578.E.01
N.370585.E.01
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 11' lanes
3. Maintain local access
4. Notify Metro @ 477-1150
at least 48 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8. Adjust to field conditions
N
S
EW
Spotter to assist pedestrians.
Lane Width 10'
Posted Speed 25
Shift Taper 115'
Buffer 75'
Sign Spacing 200'+/-
Devices Taper 20'
Devices Tangent 40'
INVENTORY
2-Spotters
7-Road Work Ahead
2-Reverse Curve
1(L) 1(R)
6-No Parking
35-Cones
NOT TO SCALE
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
www.invarion.com
MFP18003516