Loading...
HomeMy WebLinkAboutMFP18000515DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18000515 IVR Number: 18000515 Permit Informa!on Permit Name:Puget Sound Energy Gas Permits Address/Loca!on:01/26/2018Applica!on Date:3448720180Parcel Number:5204 NE 5TH PL Permit Type :02/19/2018Issue Date:Franchise Permit Work Class:02/19/2019Expira!on Date :Minor U’lity Job Number:107054642Franchise Type :Natural Gas Descrip!on:Install 50' of 4" sch 40 conduit and gas facili’es from T 01 to plat perimeter on west side of llwaco Ave NE . Asphalt cuts an’cipated . Restora’on per City of Renton standards . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - GAS - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Stuart Benne? Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: BL.036742Construc!on Contractor : INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - GAS - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy 107054642 Anish Kumar 253-208-2183 anish.kumar@pse.com 5000 Illwaco Pl NE 98059 107054642 Mead Short Plat One at a time occupying N & S bound lanes of Illwaco Pl NE for crew to install +/- 50' of 4" Schedule 40 Yellow conduit and gas facilities from T01 to plat perimeter on W side of Illwaco Pl. Pavement cuts anticipated. Restoration per City of Renton standards. 50'x18"x36" PSE/Infrasource 253-208-2183 INFRASL871C2 BL.036742 1/26/2018 Scott Warlick 1/31/2018 MFP18000515 Justin Johnson 2-19-2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 107054642 PSE/Infrasource Lee Brown 425-417-8620 6905 S 228th St, Kent 98032 lee.brown@pse.com 5000 Illwaco Pl NE TBD 2/26/2018 Anish Kumar 1/26/2018 MFP18000515 Justin Johnson 2-19-2018 8:00 am to 3:00 pm Monday through Friday SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). NE 5TH PLILWACO PL NE1414NE 5TH CT NE 6TH ST 1515 14141515 JERICHO PL NEFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKING SIGNS TO BE PLACED ON BOTH SIDES OF THE WORK AREA NO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS ONE LANE ROAD AHEAD W20-4100'100'ROAD WORK AHEAD W20-1W20-7AROADWORKAHEADW20-1ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ASTOP FLAGGER STOP FLAGGER R9-9SIDEWALKCLOSEDR9-9SIDEWALK CLOSED PEDESTRIAN DETOUR AROUND WORK AREA VIA JERICHO PL NE ROADWORKAHEADW20-1 LOT 7 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#107054642 5000 Ilwaco Pl NE, Renton, WA Janurary 18, 2017 Sheet 1 of 2 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. MFP18000515 ILWACO PL NE1414NE 5TH PL NE 5TH CT NE 6TH ST 1515 1515 1414JERICHO PL NEFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKING SIGNS TO BE PLACED ON BOTH SIDES OF THE WORK AREA NO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ASTOP FLAGGER STOP FLAGGER LOT 7 STOP FLAGGER BEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7ACHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#107054642 5000 Ilwaco Pl NE, Renton, WA Janurary 18, 2017 Sheet 2 of 2 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. MFP18000515 NE 6TH STREETLOT 1LOT 2LOT 3LOT 7LOT 6LOT 5LOT 4ILWACO AVE NEHOQUIAM AVENUE NEILWACO PLACE NENE 5th PLACE2005PUBLIC ALLEY (ROW)ELEC ONLY 5/8" MPEI83'E80'E 22'S2" MPEI 22'N5/8" MPEI2009-E60660064'N5/8" MPEI2010-EELEC ONLY52032" MPE IP 22'E107017004-2005 JT 2" MPE IP 12'S107017004-2005NE 5TH CT2" MPE IP 25'W107032562-2009 JT1-1/4" PE IP 2'S-N ESMT832-0062" PE 30'W 2" PE 22'S44'W 110'W5/8" PE 112'WEXISTING PSE GAS MAIN ANDSERVICES TO REMAIN.DEVELOPER TO VERIFYLOCATION AND CONFLICTS5115510946'56'46'48'20'SEE CONST.DETAILSEE CONST.DETAILFLOWFLOW FLOWTRACT 'A'STM.DETENTION 221918172021Owner / Developer Contact InfoofficeATTN:TUSCANY CONSTRUCTION LLCPO BOX 6127BELLEVUE, WA 98008BOB WENZL206.714.6707THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)GENERAL NOTES - GAS (JOINT TRENCH):1" = 50'105085665107054642Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to twoworking days prior to construction. 1-800-424-5555Notify appropriate permitting agency prior to job start (see permit requirements).Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosionand Sediment Control and any additional local jurisdiction requirements.Any change in route, pipe size/type, tie-in method or additional main footage must be approved by theappropriate Engineer/Project Manager.Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities.Check box on report for wire box (Test Lead) installation.Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas OperatingStandard 2525.2500.To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown onthis design, unless approved by the appropriate Engineer/Project Manager.System MAOP denoted by System MAOP = 60 PSIGInstall Main Valves out of traffic where possible.Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed.Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE GasOperating Standards 2525.1200 and 2525.2300.If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ .Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE GasField Procedures Manual 0812 and 0813.Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400.Unless otherwise noted: All pipes installed in plat to be 2" MPE-7. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings.Customer to dig and backfill on private property or easement only. Trenches must conform to PSE GasOperating Standards 2525.1500, 2525.1600 and 2525.1700.Note all recordable footages, locations and material changes on the as-built in red.Upon completion of the project send the print copy, along with the completed work order, listing crew & actualmaterials used to the appropriate design group.On site pre-con required before start of job.At symbol: install natural gas main piping and fixtures. Size as indicated on tables andwork sketch (gas main is to parallel power system unless otherwise shown on work sketch).Inclement weather conditions may cause delays in construction times and dates.19.20.18.16.17.15.14.13.6.9.11.12.10.8.7.3.5.4.2.1.DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEELEC Order NumberSAP Sup Order NbrL. BROWN425.417.8620.D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17REDT # ( RW-101604 )RENTONMEAD SHORT PLAT2" MPE-7 GAS MAIN EXTENSION - 7 S/F LOTSP# 1023059230, 5000 BLOCK ILWACO PL NE, RENTON, WA 98059PUGET SOUND ENERGY1070546421050856651" = 50'1 OF 1KING30CIKNC10SE-R23-T05E204.086207.087COMCASTBILL WALKER253.288.7538CENTURYLINKAMY ALLISTON206.794.8534RIGHT OF WAYCHAD WALIMAKI425.462.3292...N/AN/AN/A21.Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: Potelco Inc Date ______________(CHECK BOX TO CONFIRM COMPLETION)504791588107054642N/A106327229N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AGASPROJECT PHASENotification #Order #RetirementRelocateSAP SuperiorService StubsService/MeterHP Svc/MSADis. Reg. / FTInd. MSAInd. ServiceService/MeterService/Meter4680 06/11STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYGAS MAIN INSTALLATION/RETIREMENTSOAPAIRNITROGENWATERSOAPAIRNITROGENWATERSTOP TIMESTART TIMETESTED BYTEST RESULTSPFTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928PFType/WorkManufacturerPipe SizeTypeEst LengthAct LgthTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /INSTALL2"MPE-748.5 FTJOINT2"MPE-7425.5 FT................Contractor: CONSTRUCTION COST CODES:Cell Phone:Project Manager Contact Information:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:LEE BROWN425.417.8620Lee.Brown@pse.com60IP 088-60N/AN/ASITE PLANxxINSTALL 2" = 48.5 FTJOINT 2" = 425.5 FT......... JOINT TRENCH DETAILNOTES:1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *2. Rocks greater than 10 inches diameter are not permitted in the final backfill.3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.4. Utilities shall not be stacked over the gas line in the trench.5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.* Alternatives to full-width trench shading require PSE approval.Primary & Secondary-Mainline Gas & Communications (NTS)PrimaryDirt PileFinal Grade24" Min36"Min CoverOver Power48"MaxDepthFinal BackfillGas4" Sand BeddingProperty Lineintercept (depth varies).SidewalkCurbLocation of roof drain48" TypicalWidth may vary perNumber of Utilitiesand Conduits6" or 12" Min Sand ShadingOver Gas after Compaction12" MinR/W orExcavated12" TypicalPowerSecondaryPowerTV & TEL12" Min12" MinSeparation4,51,21366" or 12" Min Sand Shading Over Power after Compaction1BOB@TUSCANYWA.COMSITENVicinity Map47.4905, -122.14852" HVTT TIE-IN24'SCL, 22'ECL( )'SCL, ( )'ECL2" POLYVALVE/OPEN24'SCL, 21'ECL( )'SCL, ( )'ECLINSTALL 2" MPE-71' @ 24'SCL( )' @ ( )'SCLINSTALL 2" MPE-747.5' @ 24'SCL( )' @ ( )'SCL2" INLINE TEE24'SCL, 29'WCL( )'SCL, ( )'WCLBEGIN JOINT MAIN24'SCL, 26.5'WCL( )'SCL, ( )'WCLJOINT 2" MPE-72.5' @ 24'SCL( )' @ ( )'SCLJOINT 2" MPE-747' @ 29'WCL( )' @ ( )'WCLJOINT 2" MPE-7104' @ 71'SCL( )' @ ( )'SCLJOINT 2" MPE-7128' @ 29'WCL( )' @ ( )'WCLJOINT 2" MPE-7144' @ 25'SCL TO 37'SCL( )' @ ( )'SCL TO ( )'SCL2" CAP EOM/WIREBOX37'SCL, 173'WCL( )'SCL, ( )'WCL2" CAP EOM/WIREBOX71'SCL, 133'WCL( )'SCL, ( )'WCL2" 90° ELBOW25'SCL, 29'WCL( )'SCL, ( )'WCL2" 90° ELBOW71'SCL, 29'WCL( )'SCL, ( )'WCLT02CONSTRUCTION DETAILN.T.S.T01CONSTRUCTION DETAILN.T.S.GAS SERVICE PIPE TABLEDESCRIPTIONOFACTIVITIESLOCATIONPIPEDESIGNAS-BUILTFROMTO LOTSIZE(IN)TYPELENGTH(FT)LOCATIONLENGTH(FT)EFVSIZELOCATIONREMARKSLS TWIN2" MAIN1 & 21 1/8MPE-725( ')WCL2600SS SINGLE2" MAIN31 1/8MPE-710( ')WCL2600SS SINGLE2" MAIN41 1/8MPE-710( ')WCL2600SS SINGLE2" MAIN51 1/8MPE-710( ')NCL2600SS SINGLE2" MAIN61 1/8MPE-710( ')SCL2600SS SINGLE2" MAIN71 1/8MPE-710( ')SCL2600SS SINGLES =575FT 1 1/8" PE PIPELS TWIN =1NOT TO SCALECROSS SECTION - NE 6TH STLOOKING WESTNVARIES ROWSPROP. 2" MPE IP - 25'SCL TO 37' SCLGNOT TO SCALECROSS SECTION - ILWACO PL NELOOKING NORTHE45.5' ROWWPROP. 2" MPE IP - 29'WCLGEX 2" PE IP - 22'E 107017004-2005GNOT TO SCALECROSS SECTION - PUBLIC ALLEYLOOKING WESTNS20' ROWPROP. 2" MPE IP - 71'SCL (12'NCL ALLEY)GCROSSING CONDUIT TABLEX-ING#LOCATIONGASPOWERXINGLENGTHTYPE OF CROSSING(Feeder, Primary, Secondary, etc.)FROMTOSIZE(IN)TYPEQTYLOCATIONSIZE(IN)TYPEQTYX01TR A'A'ELECTRIC ONLY2SCH 80150PRIMARYX02LOT 7'B'4401SGAS ONLY50GAS MAINX03TR ALOT 7ELECTRIC ONLY2SCH 80125PRIMARY3SCH 80125SECONDARYX04LOT 3LOT 12401E3SCH 80225GAS SVC, SECONDARY2" PVC PLUG /CAPS = 22" YELLOW SCH 40 PVC = 25 FT2" SCH80 GREY PVC = 75 FT2" PVC PLUG /CAPS = 44" PVC PLUG /CAPS = 24" YELLOW SCH 40 PVC = 50 FT3" SCH80 GREY PVC = 75 FT3" PVC PLUG /CAPS = 6MFP18000515