HomeMy WebLinkAboutMFP18000605DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18000605
IVR Number: 18000605
Permit Informaon
Permit Name:Puget Sound Energy Gas Permits
Address/Locaon :01/31/2018Application Date:7221400390Parcel Number:1304 BEACON WAY S
Permit Type:04/26/2018Issue Date:Franchise
Permit Work Class:04/26/2019Expiration Date:Major Utility
Job Number:109108385Franchise Type:Natural Gas
Description:TRAFFIC CONTROL PLANS APPROVED. ADDITIONAL APPROVAL NEEDED FROM SPU FOR WORK WITHIN THEIR
PRIVATE PROPERTY.
Replace 1 1/4" PE gas main with 2" PE main in Beacon Way S. tie into existing 1 1/4" main on west side of Renton Ave
S. Trench across Renton Ave S to grass parkway along Beacon Way S. Hole hog SE along Beacon Way S to avoid
driveway cuts. Tie into existing 2" PE. Multiple pavement cuts anticipated. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - GAS -
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Stuart Bennett
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: BL.036742Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - GAS -
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy
109108385
Anish Kumar
253-208-2183
anish.kumar@pse.com
1304 Beacon Way S 98057 109108385
Replace 1 1/4" PE gas main with 2" PE main in Beacon Way S from 11' W C/L
Renton Ave S to 519' E C/L Renton Ave S. Tie into existing 1 1/4" main on West side of Renton
Ave S. Trench across Renton Ave S to grass parkway along Beacon Way S. (Continued below)
10'x3'x5'
PSE/Infrasource 253-208-2183
INFRASL871C2 BL.036742
1/31/2018
MFP18000605
location shown on the plans are within private property owned
by SPU. please work with SPU for work within their private
property.
Scott Warlick 4/26/2018
Justin Johnson 4-26-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
109108385 - Dupont Pipe Replacement
PSE/Infrasource
Kelsey Anderson 480-516-3761
6905 S 228th St, Kent 98032
kelsey.anderson@pse.com
1304 Beacon Way S
TBD
4/4/2018
Anish Kumar 1/31/2018
MFP18000605
8:00 am to 3:00 pm
Monday through Friday
Justin Johnson
4-26-2018
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
Hole hog Southeast along Beacon Way S to avoid driveway cuts. Tie into existing 2" PE 520' E C/L
Renton Ave S. Pavement cuts anticipated, 10'x3'x5' trench. Restoration per City of Renton standards.
12.512.58
8 R9-11SIDEWALKCLOSEDAHEADONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7ASTOPFLAGG
ERSTOPFLAGGE
R STOPFLAGG
ERR9-9SIDEWALKCLOSEDR9-9SIDEWALKCLOSEDR9-11SIDEWALKCLOSEDAHEADONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7ASTOPFLAGG
ER
ONE
LANEROADAH
EAD
W20-
4 X'X'X'ROADWORKAHEAD
W20-
1
W20-
7
AONE LANEROADAHEADW20-4
X'X'X'ROADWORKAHEADW20-1 W20-7A
RENTON AVE S
RENTON AVE SBEACON WAY SBEACON WAY SPATH OFINSTALLATIONCUT AND CAP#1304FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-P
ARKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONER9-11SIDEWALKCLOSEDAHEADR9-9
SIDEWALKCLOSEDX'USE MAXIMUM AVAILABLESPACE FOR SIGNSCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#1091083851304 Beacon Way S, Renton WAJanuary 23, 2018ryan.honeysett@pse.com425-457-5381SHEET 1 OF 4Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be approx. from 17' to 0' WCL ofRenton Ave S & from 16' to 24' SCL of BeaconWay S.TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Puget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381PRINT ON 11 X 17SHEETS ONLYMFP18000605
12.512.58
8 ONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7ASTOPFLAGG
ERSTOPFLAGGE
R X'X'X'ROADWORKAHEADW20-1W20-7ASTOPFLAGGE
R
X'X'ROADWORKAHEAD
W20-
1
W20-
7
AONE LANEROADAHEADW20-4
X'X'X'ROADWORKAHEADW20-1 W20-7A
RENTON AVE S
RENTON AVE SBEACON WAY SBEACON WAY SPATH OFINSTALLATION#1304BEPREPAREDTOSTOPW3-410
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
KNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONER9-11SIDEWALKCLOSEDAHEAD
R9-9SIDEWALKCLOSED R9-11SIDEWALKCLOSEDAHEAD
R9-9SIDEWALKCLOSEDUSE MAXIMUM AVAILABLESPACE FOR SIGNSCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#1091083851304 Beacon Way S, Renton WAJanuary 23, 2018ryan.honeysett@pse.com425-457-5381SHEET 2 OF 4TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Puget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be approx. from 0' to 105' ECLof Renton Ave S & 16' SCL of Beacon Way S.PRINT ON 11 X 17SHEETS ONLYMFP18000605
12.512.58
8
X'X'X'ROADWORKAHEADW20-1W20-7ASTOPFLAGG
ER X'X'X'ROADWORKAHEADW20-1W20-7AX'X'X'ROADWORKAHEADW20-1 W20-7A
RENTON AVE S
RENTON AVE SBEACON WAY SBEACON WAY SPATH OFINSTALLATION#1304BEPREPAREDTOSTOPW3-4FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
RKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONESMLL-PLT
SMLL-PLT SMLL-PLTBEPREPAREDTOSTOPW3-4 BEPREPAREDTOSTOPW3-4STOPFLAGGE
R
TYPICAL: CREW WILL PLACE STEELPLATES OVER OPEN TRENCH TOALLOW DRIVEWAY ACCESSSECOND FLAGGER TO ASSIST WITHPOTENTIAL DRIVEWAY TRAFFICCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#1091083851304 Beacon Way S, Renton WAJanuary 23, 2018ryan.honeysett@pse.com425-457-5381SHEET 3 OF 4TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Puget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be approx. from 105' to 320'ECL of Renton Ave S & 16' SCL of Beacon WayS.PRINT ON 11 X 17SHEETS ONLYMFP18000605
8
812.512.514141
4
1
4
RENTON AVE S
BEACON WAY SBEACON WAY SGRANT AVE SPATH OF INSTALLATION:TRENCHING WILL PROGRESSTHROUGH GRASS PATCH DIVINGBEACON WAY S#1304FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
KNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONERESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURESHOULDERWORKW21-5ROADWORKAHEADW20-1X'X'ROADWORKAHEAD
W20-
1X'ROADWORKAHEADW20-1 X'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#1091083851304 Beacon Way S, Renton WAJanuary 23, 2018ryan.honeysett@pse.com425-457-5381SHEET 4 OF 4SIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'Puget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be approx. from 320' to 520'ECL of Renton Ave S & from 16' to 22' SCL ofBeacon Way S.PRINT ON 11 X 17SHEETS ONLYLEGENDTRENCHSIGN LOCATIONTRAFFIC FLOW28" TRAFFIC CONEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP18000605
NVicinity MapN/AOwner / Developer Contact InfoofficeATTN:N/AN/AN/AN/AN/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/1111343000GASPROJECT PHASENotification #Order #RetirementSVC RetireSAP SuperiorService/MeterService/MeterHP Svc/MSADis. Reg. / FTInd. MSAInd. ServiceService/MeterService/MeterSYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG BOX (TEST LEAD) INSTALLATION.THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION ISTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT ASSHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BYCOMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIREINSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BYTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACEDPER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HANDNOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSEROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARYALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOSTANDARD GAS CONSTRUCTION NOTES:14.13.15.10.11.THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.9.6.7.5.4.3.1.3516. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.WILLIAM JOHNSON206-571-8519NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2.8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GASOPERATING STANDARD 2525.2500.NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12. ___________________________, PHONE______________. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17.FOOTAGE BETWEEN FITTINGS.18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALLINFORMATION ON D-4 CARD)PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATINGINSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICESINSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 ANDPSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINEDBY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSENOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FORSTANDARDS 2525.2100 AND 2525.3600.PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.11.12.14.13.AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.PER PSE GAS OPERATING STANDARD 2550.1600.ABANDONMENT OR DEACTIVATION.10.9.5.6.7.8.GAS OPERATING STANDARD 2525.2300.4.1.2.3.OUTAGE.STANDARD IP & LP GASREPLACEMENT CONSTRUCTION NOTES15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYGAS MAIN INSTALLATION/RETIREMENTSOAPAIRNITROGENWATERSOAPAIRNITROGENWATERSTOP TIMESTART TIMETESTED BYTEST RESULTSPFTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928PFType/WorkManufacturerPipe SizeTypeEst LengthAct LgthTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /INSTALL2"MPE498'RETIRE1 1/4"STW3'RETIRE1 1/4"PEI467'RETIRE2"STW7'6035 PSIG109108385SAP BATCH YEAR & FOOTAGEACTUALLENGTH OFRETIREMENTMATERIALRETIREDORIGINALJOBORIGINALYEARPROPOSEDLENGTH OFRETIREMENTSIZE OFRETIREDMAIN###T&T###T&TKEY TO SERVICE ACTIONLEGEND FIELD NOTES:2. NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION,1. ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK. INCLUDING AT OR BEYOND THE CONNECTION POINTS.FIELD DESIGNER: CELL: EMAIL: CONSTRUCTION QUESTIONS:PROJECT CONTACT INFORMATION:CONST MANAGER: CELL: EMAIL: PROJ MANAGER: CELL: EMAIL: FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNERSHALL BE CONTACTED:BILLING QUESTIONS:480-516-3761KELSEY ANDERSONkelsey.anderson@pse.com206-255-4824STEVE MELLINGERsteve.mellinger@pse.com480-516-3761KELSEY ANDERSONkelsey.anderson@pse.com109108387108601000108600998HOLE HOG TABLECALLOUTLOCATIONDEPTHLENGTHBP1STARTBP2ENDBP3STARTBP4ENDBP5STARTBP6ENDBP7STARTBP8ENDBP9STARTBP10ENDBP11STARTBP12ENDBP13STARTBP14ENDBP15STARTBP16ENDBP17STARTBP18ENDBP19START#####DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALK.ANDERSON480-516-3761E.VOLIANSKYI425-424-64281/17/2018T.LY425-424-64141/17/2018.W.JOHNSON206-571-85191/12/2018...N/ARENTONDUPONT PIPE REPLACEMENT1304 BEACON WAY SRENTON, WA 98057PSE1091083851"=30'1/2KING29SYSSKGPMSW 17-23-05208.080209.082N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A109108385WORKSITECell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:KELSEY ANDERSON480-516-3761kelsey.anderson@pse.comK.ANDERSON480-516-3761MFP18000605
RENTON AVE SBEACON WAY S///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////T&T1333
PEI1326T&TPEI1318T&T431T&TPEI1308T&TPEI1304IP GAS FLOWIP GAS FLOW////////////////////////////THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11PLOT PLANSCALE: 1" = 30'-0" ###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALK.ANDERSON480-516-3761E.VOLIANSKYI425-424-64281/17/2018T.LY425-424-64141/17/2018.JOHNSON206-571-85191/12/2018...N/ARENTONDUPONT PIPE REPLACEMENT1304 BEACON WAY SRENTON, WA 98057PSE1091083851"=30'2/2KING29SYSSKGPMSW 17-23-05208.080209.082N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ACell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:KELSEY ANDERSON480-516-3761kelsey.anderson@pse.comK.ANDERSON480-516-3761Scale: NTSDETAIL VIEW11Scale: NTSDETAIL VIEW22IP GAS FLOWIP GAS FLOWIP GAS FLOW IP GAS FLOW
MFP18000605
BOM for WO: 109108385
ITEM QTY DESCRIPTION PART NO.
16 2 CORROSION PROTECTION BOX FOR TEST STATIONS 5000307
15 498 WIRE #14 COPPER TRACER 8500940
14 498 PIPE 2" COIL MED DENSITY 7000261
13 10 CP WIRE #10 COPPER 8500930
12 1 WELD METAL CATHODIC MOLD 8500080
11 1 TRANSITION, 2" X 0.154" X SDR-11, GR B, WELD X FUSE 7800809
10 1 CP COPPER ADAPTER SLEEVE 7600540
8 1 TEE 2" X 2" MDPE INLINE TEE 7800362
7 1 TEE 2" X 2" MDPE HV 9996711
6 1 STOP-B/O 2" X 150 PSIG, MUELLER H-17160 7600741
5 1 ELL 2" 90 DEGREE WELD STD 6000500
4 2 GAUGE TEE HDPE 2"9999565
3 2 CAP 5/8 MECHANICAL PE 5200551
2 1 CAP, 2" X 0.154", WPB, WELD 5200675
1 2 CAP 2" MDPE 5200649
MFP18000605