Franchise Permit: MFP18001345
IVR Number: 18001345
Permit Informa!on
Permit Name:Puget Sound Energy Gas Permits
Address/Loca!on:03/14/2018Applica!on Date:2146100010Parcel Number:950 POWELL AVE SW
Permit Type :03/27/2018Issue Date:Franchise
Permit Work Class:03/27/2019Expira!on Date :Major U)lity
Job Number:109107774Franchise Type :Natural Gas
Descrip!on:Retire existing 2" PE gas main in Powell Ave Sw. Install 540' of new 2" MPE gas main in Powell
ave SW. Main and services to be hole hogged. Pothole all existing utilities. Asphalt cuts
anticipated. Restoration per city of Renton standards.
This permit is for major construction work in the ROW and will be billed at an additional $60/hr
for inspections. After hours work and weekend work will be billed at $75/hr.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - GAS - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Stuart Benne:
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: BL.036742Construc!on Contractor : INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - GAS - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy
109107774
Anish Kumar
253-208-2183
anish.kumar@pse.com
950 Powell Ave SW 98057 109107774 - Dupont Replacement
Retire existing 2" PE gas main in Powell Ave SW from 900' South of SW 7th St,
South to 205' North of SW 10th St. Install approximately 540' new 2" MPE gas main in Powell
Ave SW at 17' W of C/L from 900' South of SW 7th St, South to 205' North of (continued below)
PSE/Infrasource 253-208-2183
INFRASL871C2 BL.036742
3/14/2018
MFP18001345
Scott Warlick 3/16/2018
Justin Johnson 3-26-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
109107774 Dupont Pipe Replacement
PSE/Infrasource
Phil Doll 425-424-6568
6905 S 228th St, Kent 98032
phil.doll@pse.com
950 Powell Ave SW
TBD
6/4/2018
Anish Kumar 3/14/2018
MFP18001345
3-26-2018
8:00 am to 3:00 pm Justin Johnson
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
SW 10th St. Main and services to be hole hogged with 2'x2' openings in pavement over foreign utilities
where required. 3 5'x7' asphalt cuts anticipated. Restoration per City of Renton standards.
1919 POWELL AVE SWR9-11SIDEWALK
CLOSED
AHEADR9-9SIDEWALKCLOSEDR9-9SIDEWALK
CLOSEDR9-11SIDEWALKCLOSEDAHEADSTOP
FLAGGER
STOP
FLAGGERONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4100'100'100'ROAD
WORK
AHEAD W20-1W20-7ATypical dual bore pit configuration
(launch pit & receiving pit)
progressing East every 40' - 50'.
Keep Driveways open whenever possible.
Resident(s) will be informed
of any possible driveway closure.
Flaggers and signs will be shifted as
bore pits proceed East.
WORK TO CONTINUE TO
205' NCL OF SW 10TH ST.
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N
PSE PUGET
SOUND
ENERGY
JOB#109107774
950 Powell Ave SW, Renton, WA 98057
2/22/2018
safaa.neema@pse.com
(425) 398-6077
Sheet 1 of 2
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
STOP
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise
indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 900' SCL of SW 7th St & 21'
WCL of Powell Ave SW, 985' SCL of SW 7th St &
25' WCL of Powell Ave SW, 991' SCL of SW 7th
St & 25' WCL of Powell Ave SW, 985' SCL of SW
7th St & 17' WCL of Powell Ave SW.
MFP18001345
19192020 SW 10T
H
S
TPOWELL AVE SWSTOP
FLAGGER
STOP
FLAGGER
ONE LA
N
E
ROAD
AHEAD W20-4100'100'
ROAD
WORK
AHEA
D W20-1W20-7A100'BEPREPAREDTOSTOPW3-4100'100'ROADWORKAHEADW20-1ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ATypical dual bore pit configuration
(launch pit & receiving pit)
progressing East every 40' - 50'.
Keep Driveways open whenever possible.
Resident(s) will be informed
of any possible driveway closure.
Flaggers and signs will be shifted as
bore pits proceed East.
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N
PSE PUGET
SOUND
ENERGY
JOB#109107774
950 Powell Ave SW, Renton, WA 98057
2/22/2018
safaa.neema@pse.com
(425) 398-6077
Sheet 2 of 2
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
STOP
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise
indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 205' NCL of SW 10th St & 17'
WCL of Powell Ave SW.
MFP18001345
IP GAS FLOW950947IP GAS FLOWIP GAS FLOW
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
N/A
N/A
N/A
N/A N/A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: InfraSource Construction Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
4680 06/11
11335193 109107774
109107775
108600504
108600501
GAS
PROJECT PHASE Notification #Order #
Retirement
Relocate
SAP Superior
Service/Meter
Service/Meter
HP Svc/MSA
Dis. Reg. / FT
Ind. MSA
Ind. Service
Service/Meter
Retr Svc/Mtr
HOLE HOG TABLE
CALLOUT LOCATION DEPTH LENGTH
BP1 START
BP2 END
BP3 START
BP4 END
BP5 START
BP6 END
BP7 START
BP8 END
BP9 START
BP10 END
BP11 START
BP12 END
BP13 START
BP14 END
BP15 START
PLOT PLAN
SCALE: 1" = 30'-0" 109107774DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
Drawing Number
SAP Sup Order Nbr
PC APPROVAL
PHIL DOLL 425-424-6568
J.MALM 425-424-6421 2/20/18
K.BAUTISTA 425-424-6483 2/20/18
PHIL DOLL 425-424-6568 .
.
...
N/A RENTON
DUPONT PIPE REPLACEMENT
950 POWELL AVE SW
RENTON, WA 98057
PSE
109107774
1" = 30'1/1
KING 31 SYSSKGPM
NE24-23-04 208.074 210.079
Cell Phone:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:
Project Manager Contact Information:
PHIL DOLL
425-424-6568
phil.doll@pse.com
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
GAS MAIN INSTALLATION/RETIREMENT
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
Type/Work ManufacturerPipe Size Type Est Length Act Lgth
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 03/10
TEST RESULTS
/ /
/ /
/ /
INSTALL 2"MPE 540'
RETIRE 2"PE-A 515'
RETIRE 2"PE 2'
60 45 PSIG
SAP BATCH YEAR & FOOTAGE
ACTUAL
LENGTH OF
RETIREMENT
MATERIAL
RETIRED
ORIGINAL
JOB
ORIGINAL
YEAR
PROPOSED
LENGTH OF
RETIREMENT
SIZE OF
RETIRED
MAIN
SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG
BOX (TEST LEAD) INSTALLATION.
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS
TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.
ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY
COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE
INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY
THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED
PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND
NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO
STANDARD GAS CONSTRUCTION NOTES:
14.
13.
15.
10.
11.
THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
9.
6.
7.
5.
4.
3.
1.
45
16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.
N/A N/A
NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2.
8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
OPERATING STANDARD 2525.2500.
NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12.
___________________________, PHONE______________.
NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17.
FOOTAGE BETWEEN FITTINGS.
18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
INFORMATION ON D-4 CARD)
PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING
INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER
PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.
MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400
REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.
INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES
INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND
PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.
MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED
BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.
INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE
NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED
REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.
INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR
STANDARDS 2525.2100 AND 2525.3600.
PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.
11.
12.
AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.
PER PSE GAS OPERATING STANDARD 2550.1600.
ABANDONMENT OR DEACTIVATION.
10.
9.
5.
6.
7.
8.
GAS OPERATING STANDARD 2525.2300.
4.
1.
2.
3.
OUTAGE.
STANDARD IP & LP GAS
REPLACEMENT CONSTRUCTION NOTES
FIELD NOTES:
ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.1.
2.NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND
DURING CONSTRUCTION, INCLUDING AT OR BEYOND THE CONNECTION POINTS.
SW 7TH ST.POWELL AVE SWSW 10TH ST.
1
Scale: NONE
DETAIL1
2
Scale: NONE
DETAIL2
FIELD DESIGNER:
CELL:
EMAIL:
CONSTRUCTION QUESTIONS:
PROJECT CONTACT INFORMATION:
CONST MANAGER:
CELL:
EMAIL:
PROJ MANAGER:
CELL:
EMAIL:
FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNER
SHALL BE CONTACTED:
BILLING QUESTIONS:
425-424-6568
PHIL DOLL
phil.doll@pse.com
206-255-4824
STEVE MELLINGER
steve.mellinger@pse.com
425-424-6568
PHIL DOLL
phil.doll@pse.com
GAS MAIN PRESSURE & TESTING
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
SYS MAOPDESIGN PRESS
2023 02/08
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
GASSED UP PIPELINE
PIPE
SEGMENT
FOREMAN'S DATENAME
60 N/A
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
BOM for WO: 109107774
ITEM QTY DESCRIPTION PART NO.
10 1 CORROSION PROTECTION BOX FOR TEST STATIONS 5000307
9 540'WIRE #14 COPPER TRACER 8500940
8 540'PIPE 2" COIL MED DENSITY 7000261
7 1 TEE 2" X 2" MDPE INLINE TEE 7800362
6 2 TEE 2" X 2" MDPE HV 9996711
5 2 GAUGE TEE HDPE 2"9999565
4 2 CAP 5/8 MECHANICAL PE 5200551
3 2 ELBOW 2" X 90 MDPE 6000484
2 3 CAP 2" MDPE 5200649
1 20'PIPE 2" STRAIGHT MED DENSITY 7000263
MFP18001345