Loading...
HomeMy WebLinkAboutMFP18002446DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18002446 IVR Number: 18002446 Permit Informaon Permit Name:Puget Sound Energy Gas Permits Address/Locaon :05/08/2018Application Date:3342700425Parcel Number:3916 LAKE WASHINGTON BLVD N Permit Type:05/18/2018Issue Date:Franchise Permit Work Class:05/18/2019Expiration Date:Minor Utility Job Number:107055326Franchise Type:Natural Gas Description:Tying into existing 2" MPE IP gas main on Lake washington Blvd N to serve new plat. Trench from tie in 230' to private property. Tying into existing 2" MPE IP main on Park Ave N. Trench 30' to private property. Pothole all existing utilities. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - GAS - 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Stuart Bennett Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: BL.036742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - GAS - 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy 107055326 Anish Kumar 253-208-2183 anish.kumar@pse.com 1125 N 40th St 98056 107055326 Lakeview Tying into existing 2" MPE IP gas main on Lake Washington Blvd N to serve new plat 'Lakeview'. Trenching from tie-in ~230 ft to private property. Tying into existing 2" MPE IP main on Park Ave N. Trenching ~30 ft to private property. Pavement cuts anticipated. Restoration per City of Renton standards. 260'x4'x4' PSE/Infrasource 253-208-2183 INFRASL871C2 BL.036742 5/8/2018 MFP18002446 Scott Warlick 5/9/2018 3916 Lake Washington Blvd N Justin Johnson 5-17-2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 107055326 Lakeview PSE/Infrasource Lee Brown 425-417-8620 6905 S 228th St, Kent 98032 lee.brown@pse.com 1125 N 40th St TBD 6/11/2018 Anish Kumar 5/8/2018 MFP18002446 8:00 AM TO 3:00 PM MONDAY THROUGH FRIDAY Justin Johnson 5-17-2018 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 10101414LK WASHINGTON BLVD N N 40TH STBIKELANEENDSW9-1 B BIKESMERGE WITHTRAFFICW 4 - 1 BONE LANEROADAHEADW20-4 100'100'100'ROADWORKAHEADW20-1 W20-7A ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ASTOPFLAGGER STOPFLAGG ER STOPFLAGG ER ONE LANE ROAD AHEAD W20-4ROAD WORK AHEAD W20-1W20-7A100'100'100'PATH OF INSTALLATIONCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#1070553261125 N 40th St, Renton, WAMay 1, 2017Sheet 1 of 3 ina.ustemchuk@pse.com(425)424-6425NPSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be 21' ECL of Lake Washington Blvd N& from 116' to 29' SCL of N 40th St.BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063MFP18002446 N 40TH ST 991010 PARK AVE NN 39TH PL (PVT RD)1010DEAD ENDSTOP FLAGGER STOP FLAGGERONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A100'100'100'ONE LANE ROAD AHEAD W20-4ROAD WORK AHEAD W20-1W20-7A100'100'100'ROADWORKAHEADW20-1Job#107055326 1125 N 40th St, Renton, WA May 1, 2017 Sheet 2 of 3 ina.ustemchuk@pse.com (425) 424-6425 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. 8. Work area will be 412' NCL of N 38th St & 5' ECL of Park Ave N. TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Ina Ustemchuk Card No. 010768 Card Exp.06/30/2021 ina.ustemchuk@pse.com (425)398-6063 MFP18002446 991010 PARK AVE NN 39TH PL (PVT RD)1010DEAD ENDSTOP FLAGGERONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A100'100'100'ONE LANE ROAD AHEAD W20-4ROAD WORK AHEAD W20-1W20-7A100'100'100'ROADWORKAHEADW20-1STOP FLAGGER FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK N 40TH ST Job#107055326 1125 N 40th St, Renton, WA May 1, 2017 Sheet 3 of 3 ina.ustemchuk@pse.com (425) 424-6425 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. 8. Work area will be 412' NCL of N 38th St & from CL to ____' WCL of Park Ave N. TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Ina Ustemchuk Card No. 010768 Card Exp.06/30/2021 ina.ustemchuk@pse.com (425)398-6063 MFP18002446 8 9 12 14 15 16 11 13 7 17 10 6 5 OPEN SPACE TRACT 2 1 SD AND MONUMENT TRACT 3 4 PARK AVE NN 40TH ST 86LAKE WASHINGTON BLVD N2" MPE IP 124'W 107016417 - 2005 JT2" MPE IP 21'E980912112" STW HP 2' W PAV7831652" MPE IP 2 4 ' N 107016417 - 2 0 0 5 5/8" MPE 2007-E3905 505'S 2" MPE IP 412'N 107009539 - 2000 JT 5/8" MPE 2000 3904 343'N 412'N 441'N 2" MPE IP 5'E107009539 - 2000 JT1 1 6 ' S 24'N N 39TH CT WELLS AVE N'A''B' 'F''E' 6 0 ' 4. 5 ' R O W D E D I C A T I O N 2' ROW DEDICATION 60' EXISTING ROW 47' 50' 7' ROW DEDICATION 47' 20'FLOWFLOW SEE CONST. DETAILS SEE CONST. DETAILS 'C''D' 52'N N 38TH ST 2" MPE IP 20'N 9714715 Owner / Developer Contact Info officeATTN: ICAP LAKEVIEW, LLC 3535 FACTORIA BLVD SE BELLEVUE, WA 98006 FRANCIS RZEGOCKI 425.495.1753 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105087045107055326Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-7. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL Lee Brown 425.417.8620 12.14.17 Joanna Yang 206.503.0706 12.14.17 E. HAUSER .12.14.17 RW-103693 City of Renton LAKEVIEW 2" MPE-7 GAS MAIN EXTENSION - 17 S/F LOTS 1125 N 40TH ST, RENTON, WA 98056 PUGET SOUND ENERGY 107055326 105087045 1" = 50'1 OF 2 KING 30 CIKNC 32NW-T24N-R05E 200.080 202.082 COMCAST BILL WALKER 253-288-7538 CENTURYLINK/QWEST KENNETH LUU 206-346-0144 RIGHT OF WAY VAL CONNELL 425-462-3518 . . . N/A N/A N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: Potelco Inc Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 505177523 107055326 N/A 106332704 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 GAS MAIN INSTALLATION/RETIREMENT Type/Work ManufacturerPipe Size Type Est Length Act Lgth Contractor: CONSTRUCTION COST CODES: Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:LEE BROWN 425.417.8620 Lee.Brown@pse.com N/A N/A SITE PLAN xx ... ... ... JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 FRANCIS@ICAPEQUITY.COM N Vicinity Map 47.5274, -122.2027 SITE INSTALL 2" MPE-7 85' @ 21'ECL ( )' @ ( )'ECL JOINT 2" MPE-7 200' @ 29'SCL TO 33'SCL ( )' @ ( )'SCL TO ( )'SCL 2" INLINE TEE 33'SCL, 25'ECL ( )'SCL, ( )'ECL JOINT 2" MPE-7 224' @ 33'SCL ( )' @ ( )'SCL 2" 90° ELBOW 33'SCL, 33'WCL ( )'SCL, ( )'WCL JOINT 2" MPE-7 245' @ 33'WCL ( )' @ ( )'WCL JOINT 2" MPE-7 194' @ 25'ECL ( )' @ ( )'ECL 2" INLINE TEE 25'SCL, 25'ECL ( )'SCL, ( )'ECL JOINT 2" MPE-7 108' @ 25'ECL ( )' @ ( )'ECL 2" INLINE TEE 30'SCL, 11'WCL ( )'SCL, ( )'WCL JOINT 2" MPE-7 56' @ 11'WCL ( )' @ ( )'WCL JOINT 2" MPE-7 88' @ 11'WCL ( )' @ ( )'WCL 2" CAP EOM/WIREBOX 58'NCL, 11'WCL ( )'NCL, ( )'WCL 2" CAP EOM/WIREBOX 86'SCL, 11'WCL ( )'SCL, ( )'WCL 2" CAP EOM/WIREBOX 133'SCL, 25'ECL ( )'SCL, ( )'ECL 2" POLYVALVE/OPEN 116'SCL, 22'ECL ( )'SCL, ( )'ECL ~195 FT CROSSINGS CONDUIT TABLE X-ING NO. LOCATION GAS POWER Length Remarks (type of crossing) SIZE Type Qty Location SIZE Type Qty (Primary, Feeder, Secondary, St. FROM TO (in)sched each N-S-E-W (in)sched each (ft)Light, Gas Only, etc.) X01 'A''B'4 80 1 N 3 80 2 60 PRIMARY & GAS MAIN X02 LOT 2 LOT 10 2 80 1 N 3 80 2 60 SECONDARY & GAS SERVICE X03 LOT 12 LOT 8 4 80 1 N 2 80 2 60 PRIMARY & GAS MAIN X04 'C''D'4 80 1 N 3 80 1 25 SECONDARY & GAS MAIN X05 'E''F'4 80 1 N GAS ONLY 30 GAS MAIN 2'' YELLOW SCH 80 PVC = 60 FT 2'' GREY SCH 80 PVC = 120 4'' YELLOW SCH 80 PVC = 175 FT 2" PVC Plug / Caps = 2 4" PVC Plug / Caps = 8 3'' GREY SCH 80 PVC = 265 2" PVC Plug / Caps = 4 3" PVC Plug / Caps = 10 T01 CONSTRUCTION DETAIL NOT TO SCALE 2" FUSED TIE-IN W/ 2'' 90° ELBOW 116'SCL, 21'ECL ( )'SCL, ( )'ECL INSTALL 2" MPE-7 1' @ 116'SCL ( )' @ ( )'SCL 2" 90° ELBOW 116'SCL, 28'ECL ( )'SCL, ( )'ECL INSTALL 2" MPE-7 6' @ 116'SCL ( )' @ ( )'SCL T02 CONSTRUCTION DETAIL NOT TO SCALE JOINT 2" MPE-7 3' @ 21'ECL ( )' @ ( )'ECL 2" INLINE TEE/BEGIN JT MAIN 31'SCL, 21'ECL ( )'SCL, ( )'ECL 2" CAP EOM/WIREBOX 28'SCL, 21'ECL ( )'SCL, ( )'ECL BEGIN JT MAIN/ 2" POLYVALVE/OPEN 402'NCL, 24'WCL ( )'NCL, ( )'WCL 2" HVTT TIE-IN 402'NCL, 5'ECL ( )'NCL, ( )'ECL SIDE LOT OF LOT 1 AT STEEP SLOPE; NO EXCAVATION POSSIBLE; DEVELOPER TO EXCAVATE IN ROW UNDER SIDEWALK 2" 90° ELBOW 402'NCL, 33'WCL ( )'NCL, ( )'WCL JOINT 2" MPE-7 9' @ 402'NCL ( )' @ ( )'NCL INSTALL 2" MPE-7 29' @ 402'NCL ( )' @ ( )'NCL INSTALL 2"MPE-7 121 FT JOINT 2"MPE-7 1333 FT .... .... .... .... JOINT 2" MPE-7 206' @ 25'SCL TO 30'SCL ( )' @ ( )'SCL TO ( )'SCL MFP18002446 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL Lee Brown 425.417.8620 12.14.17 Joanna Yang 206.503.0706 12.14.17 E. HAUSER .12.14.17 RW-103693 City of Renton LAKEVIEW 2" MPE-7 GAS MAIN EXTENSION - 17 S/F LOTS 1125 N 40TH ST, RENTON, WA 98056 PUGET SOUND ENERGY 107055326 105087045 AS SHOWN 2 OF 2 KING 30 CIKNC 32NW-T24N-R05E 200.080 202.082 COMCAST BILL WALKER 253-288-7538 CENTURYLINK/QWEST KENNETH LUU 206-346-0144 RIGHT OF WAY VAL CONNELL 425-462-3518 . . . N/A N/A N/A ... ... ... ... Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: Potelco Inc Date ______________ (CHECK BOX TO CONFIRM COMPLETION) GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS LS TWIN 2" MAIN 1&2 1 1/8 MPE-7 65 ( ')SCL 2600 SS SINGLE 2" MAIN 3 1 1/8 MPE-7 10 ( ')NCL 2600 SS SINGLE 2" MAIN 4 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 5 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 6 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 7 1 1/8 MPE-7 10 ( ')WCL 2600 SS SINGLE 2" MAIN 8 1 1/8 MPE-7 10 ( ')WCL 2600 SS SINGLE 2" MAIN 9 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 10 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 11 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 12 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 13 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 14 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 15 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 16 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLE 2" MAIN 17 1 1/8 MPE-7 10 ( ')SCL 2600 SS SINGLES =15 1 1 215 FT 1 1/8" PE PIPE LS TWIN =1 1 1 TOTAL EFV 16 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 N/A PROPOSED 2" MPE -7 - 21' ECL G G EXISTING 2" PE IP 21'ECL 9809121NOT TO SCALE CROSS SECTION - LK WASHINGTON BLVD N LOOKING NORTH PROPOSED 2" MPE -7 - 29'SCL TO 33'SCL G NOT TO SCALE CROSS SECTION - N 40TH ST LOOKING EAST NOT TO SCALE CROSS SECTION - WELLS AVE N LOOKING NORTH PROPOSED 2" MPE -7 - 25'ECL G NOT TO SCALE CROSS SECTION - N 39TH CT LOOKING EAST PROPOSED 2" MPE -7 - 25'SCL PROP. 2" PE IP - 11'W G 20' ACCESS NOT TO SCALE CROSS SECTION - N 39TH CT N/S LOOKING NORTH NOT TO SCALE CROSS SECTION - PARK AVE N LOOKING NORTH G EXISTING 2" PE IP 5'ECL 107009539-2000 G PROPOSED 2" MPE -7 - 33'WCL G MFP18002446