Loading...
HomeMy WebLinkAboutSigned Franchise Permit ApplicationDEPARTMENT OF COMMUNITY CITY OF 19 AND ECONOMIC DEVELOPMENT Renton Planning Division 1 1055 South Grady Way, 6th Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 Franchise Agency: Puget Sound Energy Franchise Job Number: 889005217 Phone: 206-276-1480 Contact Name: Georgia Savoy Job Site Address: Email: georgia.savoy@pse.com 2800 LAKE WASHINGTON BVD N Project Name: REG STATION INSPECT Description of Work: AN ANNUAL INSPECT OF OUR GAS REGULATOR STATION THAT IS IN THE GRASS. LANE CLOSURE: TRAFFIC PLAN )lease check all that apply: ❑ New Construction ❑ Repair/Relocate ❑ Underground ❑ Overhead ❑ Sidewalk ❑ Street ❑ Open Trench ❑ Bore # of feet: Contractor Name: PUGET SOUND ENERGY Phone: 206-276-1480 State Contractors License #: PUGETSE032J1 "I certify that I am the owner or applicant's authorized under this permit anc shall comply wit�i the r Signature n City of Renton Business License #: BL000663 do hereby agree to abide to the terms and conditions set forth estoration and Street Overlay Requirements. " Date 05, 2L-�, 2 4l F - INSPECTIONS SHATCBE'RE TED_24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINEAT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meet►nas shall be scheduled at a maximum or 14 days prior to the lop start date. Plan Review/Development Engineering Date Site Construction Inspector Development Engineering Manager Date Date ❑ Approved as submitted ❑ Pre -Construction Meeting required ❑ Approved with comments or redlines ❑ Camera inspection of utilities required Page 1 of 1 Published: 2/1/2018