Loading...
HomeMy WebLinkAboutMFP17001799DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17001799 IVR Number: 17001799 Permit Inrman Permit Name:Puget Sound Energy - Electric Address/Lcan :04/21/2017Aican Date :8857670060Parce Number :400 S 43RD ST Permit Tye :05/10/2017Issue Date:Franchise Permit Wrk Cass :05/10/2018Eiran Date :Minor lity Jb Number :105084325Franchise Tye :Electric Descrin:Install 3 phase j box and 3 phase ug line extension to new pm transformer. Pre onstrucon meeng reu ired. Cntacts Name Address PhneTyeBiing arli Bunkelman PSE/POTELO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708ApplicantX VIKI HENSON POTELO IN 8001 212th St S Kent, WA 98032 B: (253) 863-0484ontractor Business License Number: BL.005109Eectrica Cntractr : POTELI*344O4 Cnstrucn Cntractr : POTELI*227PL PBLI HOSP DIST#1 KING O P O BOX 50010 Renton, WA 98058 Owner ITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner enera Cndins & Signature Permission is hereby gien for the work described o n this permit according to the condions hereon and according to the approed plans and specicaons pertaining thereto, subject to compliance with the Ordinance of the ity of Ren ton. This permit and plans must be posted at the job site at all mes . I hereby cerfy that no work is to be done except a s described aboe and in approed plans, and that w ork is to conform to Renton Trench Restoraon and Street Oerlay Reuirements . all (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in adance to schedule an inspe cons and for ANY work in the Right of Way. all 8 1 1 to locate underground ulies at least two full bus iness days prior to any excaaon . In accordance with RW 19.122.033(4) the permit hol der is reuired to contact (Williams Northwest Pipe line at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to reuest a consultaon with the transm ission pipeline company prior to performing any construcon or excaaon acies . This reuirement to consult with the transmissio n pipeline company is in addion to the reuirement to all before You Dig a s reuired in RW 19.122. (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy 105084325 Carli Bunkelman 253-437-6708 Carli.Bunkelman@pse.com 400 s 43rd St UW VMC MOB Crew to install 3 phase j box and a 3 phase ug line extension to newpm transformer to serve "400". 10' Potelco Inc.253-437-6708 BL005109 Poteli*227PL 4/19/2017 Justin Johnson 04/24/2017 MFP17001799 Holly Powers 5/4/2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form UW VMC MOB Potelco Inc. Brad Elkin 425-495-6489 6905 S. 228th St, Kent, WA 98032 Brad.Elkin@pse.com 400 s 43rd St 8:30 am - 3:00 pm Monday - Friday Carli Bunkelman 4/19/2017 Justin Johnson 04/24/2017 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). P01 BUSSTOPRIGH T KEEP R4-7BARRW-BRDW4-2LROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5R100'100'100'CENTE R L A N E CLOS E D AHEA D W9-3ROA D WOR K AHEA D W20-1100'100'100'W4-2RS 177th StTalbot Rd SCONETOPPERCONETOPPERROADWORKAHEADW20-111 111212R9-9SIDEWALKCLOSEDR9-9SIDEW A L K CLOSE D R9-11SIDE W A L K CLOS E D AHEA D DET O U RM4-9bMOVE BUS STOP APPROX 50' SOUTH STOP FLAGGER SPOTTER TO ASSIST PEDESTRIANS CROSS A WORKING AREA PLACE SIGNS AT NEAREST CROSSWALK CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY Job#105084325 400 S 43rd St Renton, WA April 6th, 2017 Sheet 1 of 1 mitchell.peterson@pse.com 425-398-6071 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 28" TRAFFIC CONE TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG STOP FLAGGER LEGEND POLE ARROW BOARD DNDNDNNEW MEDICAL OFFICE BUILDINGPLANTED AREAENTRY / DROP-OFFENTRY / DROP-OFFPLANTED AREAPLANTED AREAPLANTED AREAEXISTING CURB TO BE DEMOLISHEDEDGE OF BUILDINGBELOWHCVAN+97'-3"+81'-0"RETAINING WALLHCVANFIRE LANE REQUIREMENTSNO PARKING ALLOWED IN DESIGNATED ZONE.13'-6" VERTICAL HEIGHT CLEARANCE MINIMUM.IDENTIFICATION SIGNAGE TO BE SPACED NOGREATER THAN 50'-0" APART.TRASHUTILITY TRANSFORMERARCHITECTURALGATE ANDSCREEN WALL+97'-3"MECHELECEMERGENCYTRANSFORMERUTILITY TERMINALCABINET10'-0" TRANSFORMERCLEARANCEPLANTED AREAENTRY CANOPY ABOVEPICK-UPHCVANHCVANBENCH SEATBENCH SEATBENCH SEATRETAINING WALLRETAINING WALLSTEPS LIGHTSBOLLARD LIGHTBOLLARD LIGHTBOLLARD (NO LIGHT)BOLLARD LIGHTBOLLARD LIGHTBOLLARD (NO LIGHT)10' 277' 82' 8' S 177TH STTALBOT RD SVIC 16 15' SITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: UW VMC MOB 400 S 43ST RENTON, WA 98055 CHRIS BARKER (206)623-0717 105084325THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: NONE CIRCUIT FEET ADDED: 370' 3Ø ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE VIC-16 2016 253 202 210 35.45 35.45 35.45 288.45 237.45 245.45 GAS PHONE CABLE TV 503963685 105084325 N/A 108100001 N/A 594113515 N/A 593182157 N/A N/A 504422733 104289639 N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:BRAD ELKIN 425-495-6489 bradley.elkin@pse.com LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 160,000SQ. 4000AMPS ELEC 650KW 390A 2.8% 1.8% SCALE: 1" = 50' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP BRAD ELKIN 425-495-6489 03/30/17 BRAD ELKIN 425-495-6489 03/30/17 N/A N/A N/A J. REIBMAN N/A 03/30/17 EASEMENT REQUIRED CITY OF RENTON UW VMC MOB INSTALL 3Ø J-BOX & 3Ø L/E & PM TRF 400 S 43ST, RENTON, WA 98055 N/A N/A N/A 105084325 AS NOTED 1/2 KING N/A N/A CSPSKEIN T23N, R05E, NE SEC 31 N/A N/A 2305E121 2305E124 2305E121 VIC-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) P01 J01 4 1 10 1 3Ø PRI 60 EHM675 EHM676 EHM677 J01 V01 2 1 15 1 1Ø PRI 25 EHM678 REPLACE EXISTING CABLE & NEW TAGS V01 V02 4 1 370 1 1 3Ø PRI 390 EHM679 EHM680 EHM681 Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-Complete LB DC J01 316503 165935 5'X7' Diamond PL Lid Matid: 7663200 J-BOX Matid: 7625900 7 5 V01 316503 165937 EXISTING EXISTING 1Ø TUT 2 - EXISTING V02 316512 165905 7'X7' W/ 8'X10' LID Matid: 7917900 TRF Matid: 6259350 3 - P01 -REMOVE EXISTING 1Ø 200A TERM & 2" RISER -INSTALL NEW 3Ø 200A TERM ON NEW TRI-UNIT -INSTALL 1-4" PRIMARY RISER J01 -INSTALL NEW 575 J-BOX V01 -EXISTING 1Ø TUT 25kVA V02 -INSTALL 3Ø 1000kVA 277/480v PM TRF -CONNECT AND TAG 10 RUNS CUSTOMER OWNED SVC SPAN NOTES SEE TABLES P01-V01 -REPLACE EXISTING 1Ø PRI AND RESERVE V01 FROM J01 SCALE: 6" = 1 MILE UNDERGROUND CIRCUIT MAP EXISTING JOB SITE JOB SITE SCALE: 6" = 1 MILE UNDERGROUND CIRCUIT MAP FUTURE JOB SITE 15' 15' 8'11X11 WORK PIT 11X9 WORK PIT 4X4 WORK PIT (1) RUN 3Ø 1/0 PRI, ± 50' 1-2" SCH'L 80 CONDUIT, ± 15' (1) RUN 3Ø 4/0 PRI, ± 390' 1-2" SCH'L 80 CONDUIT, ± 370' 277' 82' (1) RUN 1Ø 4/0 PRI, ± 35' 1-2" SCH'L 80 CONDUIT, ± 15' SCALE: NONE CIRCUIT ONE-LINE DIAGRAM 4'-0" 1'-0" 5'-8" 8" 7'-0" Tubes for 1" adjustable bolts ( 4) Cover 2,490 lbs Top Section 1,835 lbs Base 4,760 lbs 4'-8" (2) 3' Square Plate Doors NOTE: For Installations in pavement or sidewalks with adjustable cover SIDE VIEW TOP VIEW 9'-0" 11'-0" 2" 6'-0" 6" Crushed Rock 3-piece handhole, increase excavation Depth to 6'-6" and 24 cubic yards. 4'-8" x 7' Handhole ( 575) w/adjustable Cover MID#: 7663206 VAULT & EXCAVATION DETAIL Not to scale 6051.1500 Excavation - 20 cubic yards Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 4" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. 2" Excavation - 20 cubic yards 10'-0" 7'-0" 8'-0" 8" 6'-2" SIDE VIEW 6'-6"Crushed 6" Rock 11' 11' TOP VIEW 5'-6" 7'-0" 6775.0030Not to scale VAULT & EXCAVATION DETAIL UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP BRAD ELKIN 425-495-6489 03/30/17 BRAD ELKIN 425-495-6489 03/30/17 N/A N/A N/A J. REIBMAN N/A 03/30/17 EASEMENT REQUIRED CITY OF RENTON UW VMC MOB INSTALL 3Ø J-BOX & 3Ø L/E & PM TRF 400 S 43ST, RENTON, WA 98055 N/A N/A N/A 105084325 AS NOTED 2/2 KING N/A N/A CSPSKEIN T23N, R05E, NE SEC 31 N/A N/A 2305E121 2305E124 2305E121 VIC-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 18" MIN 18" MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 6775.0035 Not to scale 5' MIN 5' MIN 5' MIN 10' MIN OF CLEARANCE FOR NON COMBUSTIBLES