HomeMy WebLinkAboutP_Utility PlanUW VMC MOB Sheet1_105084325_V1_170419DNDNDNNEW MEDICAL OFFICE BUILDINGPLANTED AREAENTRY / DROP-OFFENTRY / DROP-OFFPLANTED AREAPLANTED AREAPLANTED AREAEXISTING CURB TO BE DEMOLISHEDEDGE OF BUILDINGBELOWHCVAN+97'-3"+81'-0"RETAINING WALLHCVANFIRE LANE REQUIREMENTSNO PARKING ALLOWED IN DESIGNATED ZONE.13'-6" VERTICAL HEIGHT CLEARANCE MINIMUM.IDENTIFICATION SIGNAGE TO BE SPACED NOGREATER THAN 50'-0" APART.TRASHUTILITY TRANSFORMERARCHITECTURALGATE ANDSCREEN WALL+97'-3"MECHELECEMERGENCYTRANSFORMERUTILITY TERMINALCABINET10'-0" TRANSFORMERCLEARANCEPLANTED AREAENTRY CANOPY ABOVEPICK-UPHCVANHCVANBENCH SEATBENCH SEATBENCH SEATRETAINING WALLRETAINING WALLSTEPS LIGHTSBOLLARD LIGHTBOLLARD LIGHTBOLLARD (NO LIGHT)BOLLARD LIGHTBOLLARD LIGHTBOLLARD (NO LIGHT)10'
277'
82'
8'
S 177TH STTALBOT RD SVIC
16
15'
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
UW VMC MOB
400 S 43ST
RENTON, WA 98055
CHRIS BARKER (206)623-0717 105084325THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE SPECIFIC NOTES
OVERHEAD CIRCUIT MAP
SCALE: NONE
CIRCUIT FEET ADDED: 370' 3Ø
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
VIC-16
2016
253 202 210
35.45 35.45 35.45
288.45 237.45 245.45
GAS
PHONE
CABLE TV
503963685 105084325
N/A 108100001
N/A 594113515
N/A 593182157
N/A N/A
504422733 104289639
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:BRAD ELKIN
425-495-6489
bradley.elkin@pse.com
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
160,000SQ.
4000AMPS
ELEC
650KW
390A
2.8%
1.8%
SCALE: 1" = 50'
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
BRAD ELKIN 425-495-6489 03/30/17
BRAD ELKIN 425-495-6489 03/30/17
N/A N/A N/A
J. REIBMAN N/A 03/30/17
EASEMENT REQUIRED CITY OF RENTON
UW VMC MOB
INSTALL 3Ø J-BOX & 3Ø L/E & PM TRF
400 S 43ST, RENTON, WA 98055
N/A N/A
N/A 105084325
AS NOTED 1/2
KING N/A N/A CSPSKEIN
T23N, R05E, NE SEC 31 N/A N/A
2305E121 2305E124 2305E121 VIC-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
P01 J01 4 1 10 1 3Ø PRI 60 EHM675 EHM676 EHM677
J01 V01 2 1 15 1 1Ø PRI 25 EHM678 REPLACE EXISTING CABLE & NEW TAGS
V01 V02 4 1 370 1 1 3Ø PRI 390 EHM679 EHM680 EHM681
Vault & Equipment Table
Site Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-Complete
LB DC
J01 316503
165935
5'X7'
Diamond PL Lid
Matid: 7663200
J-BOX
Matid: 7625900 7 5
V01 316503
165937 EXISTING EXISTING
1Ø TUT 2 -
EXISTING
V02 316512
165905
7'X7' W/ 8'X10' LID
Matid: 7917900
TRF
Matid: 6259350 3 -
P01
-REMOVE EXISTING 1Ø 200A TERM & 2" RISER
-INSTALL NEW 3Ø 200A TERM ON NEW TRI-UNIT
-INSTALL 1-4" PRIMARY RISER
J01
-INSTALL NEW 575 J-BOX
V01
-EXISTING 1Ø TUT 25kVA
V02
-INSTALL 3Ø 1000kVA 277/480v PM TRF
-CONNECT AND TAG 10 RUNS CUSTOMER OWNED SVC
SPAN NOTES
SEE TABLES
P01-V01
-REPLACE EXISTING 1Ø PRI AND RESERVE V01 FROM J01
SCALE: 6" = 1 MILE
UNDERGROUND CIRCUIT MAP EXISTING
JOB
SITE
JOB
SITE
SCALE: 6" = 1 MILE
UNDERGROUND CIRCUIT MAP FUTURE
JOB
SITE