HomeMy WebLinkAboutMFP17001800DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17001800
IVR Number: 17001800
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:04/21/2017Applica!on Date:1823059245Parcel Number:68 RAINIER AVE S
Permit Type :05/10/2017Issue Date:Franchise
Permit Work Class:05/10/2018Expira!on Date :Minor U(lity
Job Number:105084322Franchise Type :Electric
Descrip!on:Install 3 phase j box, pm transformer and a 3 phase underground line extension.
Contacts
Name Address PhoneTypeBilling
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708ApplicantX
VICKI HENSON
POTELCO INC
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the condi(ons hereon and according to the approved
plans and specifica(ons pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all (mes .
I hereby cer(fy that no work is to be done except as described above and in approved plans, and that work is to conform to Renton
Trench Restora(on and Street Overlay Requirements .
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspec(ons and for ANY work in
the Right of Way.
Call 8 1 1 to locate underground u(li(es at least two full business days prior to any excava(on .
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic
Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consulta(on with the transmission pipeline company prior
to performing any construc(on or excava(on ac(vi(es . This requirement to consult with the transmission pipeline company is in
addi(on to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy
105084322
Carli Bunkelman
253-437-6708
Carli.Bunkelman@pse.com
68 Rainier Ave S Renton Starbucks
Crew to install 3 phase j box, pm transformer and a 3 phase ug line extension
to serve new customer "68".
Potelco Inc.253-437-6708
BL005109 Poteli*227PL
4/19/2017
Justin Johnson 04/24/2017
MFP17001800
Holly Powers 5/4/2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
Potelco Inc.
Brad Elkin 425-495-6489
6905 S. 228th St, Kent, WA 98032
Brad.Elkin@pse.com
68 Rainier Ave S
9:00 am - 3:00 pm
Monday - Friday
Carli Bunkelman 4/19/2017
Justin Johnson 04/24/2017
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
2020111111121114ONLYR3-5R
RIGHT
SHOULDER
CLOSED
W21-5aRROAD
WORK
AHEAD W20-1W1-4L100'100'100'W20-7A100'STOPFLAGG
E
RFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGROADWORKAHEADW20-1 350'RAINIER AVE SRAINIER AVE SHAYES PL SW1111 BUSSTOP
STARBUCKSFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
M6-2R9-11SIDEWALKCLOSEDAHEAD
R9-9SIDEWALKCLOSEDR9-9SIDEWALK
CLOSED
R9-11SIDEWALK
CLOSED
AHEAD FLAGGER WILL ASSIST PEDESTRIANSWITH SIDEWALK CLOSUREJ02J01V01S TOBIN STmaintain (2) 12' min. lanesX'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1300Job#10508432268 Rainier Ave S, Renton WAMarch 23, 2017Sheet 1 of 1 ryan.honeysett@pse.com(425) 457-5381CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-642528" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPVAULTVaultSHEET IS FORMATTEDFOR 11 X 17
11' x 9' WORK PIT
8' x 8' WORK PIT
(1) RUN 3Ø 1/OAL JKT UG PRI CABLE ±30'
AØEHC194, BØEHC195, CØEHC196
EXISTING CONDUIT FROM DIP1 TO J02
(1) 4" DB120 GREY PVC CONDUIT ±10' J01 TO DIP1
(1) RUN 3Ø 1/OAL JKT UG PRI CABLE ±30'
AØEHC197, BØEHC198, CØEHC199
(1) 4" DB120 GREY PVC CONDUIT ±10'
(1) RUN 3Ø 1/OAL JKT UG PRI CABLE ±20'
AØ54980, BØ54981, CØ54982
(1) 4" DB120 GREY PVC CONDUIT ±10'
4' x 4' WORK PIT
S TOBIN STRAINIER AVE SLAKE AVE S54
95STARBUCKS
X170
SHOPPING
CENTER
AØ54980
BØ54981
CØ54982
317967-165820
112.5kVA 120/208V
317968-165818
NEW 1/OAL
(+&$
(+&%
(+&&
NEW 1/OAL
(+&$
(+&%
(+&&317970-165831
CØADW830
GAS
PHONE
CABLE TV
594113508
104289608
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)105084322Owner / Developer Contact Info
officeATTN:
BURKHEIMER FAMILY, LLC
1326 5TH AVENUE #708
SEATTLE, WA 98101
TED DIMOF 206-323-4144
N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
BRAD ELKIN 253-395-6872 3/8/17
BRAD ELKIN 253-395-6872 3/8/17
C. SNYDER 714-893-2405 3/15/17
REQUIRED RENTON
RENTON STARBUCKS
3PH JBOX CUT-IN, 3PH UG L/E & TRF SET
68 RAINIER AVENUE S., RENTON, WA 98055
PSE
105084322
AS NOTED 1/1
KING CSPSKEIN
NE18-T23N-R05E
2305E069 2305E076 PCR-13
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
2305E069
504061832 105084322
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:BRAD ELKIN
253-395-6872 Ext. 82-6872
bradley.elkin@pse.com
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
504419758
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SITE MAP
SCALE: 1" = 50'
CIRCUIT FEET ADDED: 30'POWER GENERAL NOTES - COMMERCIAL PROJECT
9.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
JOB SITE
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PCR-13
5.06.16
266 253 212
3.82 3.82 3.82
269.82 256.82 215.82
SITE SPECIFIC NOTES
J01: 317968-165818
-INSTALL 4'-8" x 7'-0" VAULT & COVER
-INSTALL (3) 4-POS J-BOX
-INSTALL (9) L/B ELBOWS & (3) DUST CAPS
-INSTALL GRID #
V01: 317967-165820
-INSTALL 4'-8" SQ VAULT W/ 4'-8" x 5'-6" COVER
,167$//N9$3075)9
-INSTALL (3) L/B ELBOWS
-INSTALL SECONDARY CONNECTORS
-INSTALL GRID #
-CONNECT & TAG CUSTOMER UG SVC (1 RUN OF UNK)
SPAN SPECIFIC NOTES
PSE TO INSTALL NEW PRIMARY CABLE & CONDUIT
IN CUSTOMER PROVIDED TRENCH & EXCAVATION
-SEE PRIMARY CABLE & CONDUIT TABLE
CIVIL CONTRACTOR & CUSTOMER NOTES
THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL, COMPACTION
& RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
-REQUIRED TO PROVIDE 11' X 9' WORK PIT AT J01
-REQUIRED TO PROVIDE 8' X 8' WORK PIT AT V01
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT DIP1 & DIP2
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-EXCAVATION, TRENCH & L&I INSPECTIONS ARE REQUIRED 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
CUSTOMER TRENCHING IN CITY, COUNTY OR WSDOT R.O.W NOTES
THE CUSTOMER IS RESPONSIBLE FOR REVIEWING THE MUNICIPALITIES' TRENCHING REQUIREMENTS UNDER THE PERMIT.
ALL INSPECTIONS ARE REQUIRED BY PSE
-IF A PRE-CON MEETING IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL
SET-UP & SCHEDULE A MEETING WITH THE MUNICIPALITY PRIOR TO ANY EXCAVATION OR INSTALLATION BEGINNING.
ELECTRICIAN & CUSTOMER NOTES
THE CUSTOMER IS RESPONSIBLE TO COORDINATE NEW 400-AMP METER INSTALLATION
WITH PUGET SOUND ENERGY PROJECT MANAGER & THE METERING DEPARTMENT UPON L&I INSPECTION APPROVAL
PSE CONTACT INFORMATION:
-METER DEPARTMENT - DAVE MUTSCHLER AT (206) 396-2145
-PROJECT MANAGER - BRAD ELKIN AT (253) 395-6872
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
Sq. Footage: 2034 SQ FT
Panel Size: 400 AMP
Heat Type: GAS
Est. Demand: 70kW
LRC: 65A
% V. Drop: 2.7% (208V)
% Flicker: 1.0% (208V)
FAULT CURRENT TABLE
3075$16)250(5<9
208V WINDINGS
LOCATION SIZE R/X MIN. %Z FAULT CURRENT
V01 112.5 kVA 0.3 1.55 26,900 AMPS
JOB SITE
TOP VIEW
Excavation - 10-1/3 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
8'-0"
4'-8"
3'-6"
4'-8"
6"
20"
4'-8"5'-6"
44"
8'-0"
No Secondary
PSE Primary
Conduit
Customer's service wire conduits may
enter at any corner other than the corner
where the primary cable enters the vault.
VAULT & EXCAVATION DETAIL @ V01
NOT TO SCALE
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
7'-0"
4'-0"
1'
4'-8"
VAULT & EXCAVATION DETAIL @ J01
NOT TO SCALE
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE
J01 DIP1 4 1 10 -1 --CONDUIT ONLY -
J01 J02 CABLE ONLY 131 131 1/0 AL JKT 30 EHC194 EHC195 EHC196 -
J01 DIP2 4 1 10 ----105 105 1/0 AL JKT 20 54980 54981 54982 -
J01 V01 4 1 10 1 ---154 155 1/0 AL JKT 30 EHC197 EHC198 EHC199 -
4" PVC (FT) & BENDS =30 1 1 0 0 1/0 AL JKT TOTAL (FT) =240
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
J01 317968
165818
5' x 7' x 5'
Matid: 7663200 9 3
V01 317967
165820
4'8" x 4'8" x 3'6"
Matid: 7663900
112.5KVA MP TRF
120/208V
Matid: 6258050
3 0
CIRCUIT FEET REMOVED: 20'
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 100'
Perm. Service
PRIMARY CABLE TRENCH DETAIL
NOT TO SCALE
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
4" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
317967-165820
112.5kVA
COOLING
FINS
ACCESS
CONCRETE
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR
CURB OR EDGE OF PAVEMENT
TYP. PAD
& TRANS-
FORMER
DOOR
5' MIN5' MIN
10' MIN
5'
MIN
5' MIN
3'
MIN
3' MIN 3' MIN
ROAD OR
PARKING AREA
PAD
REQUIRED
WORK SPACE
AREA
EDGE OF
PAVEMENT