Loading...
HomeMy WebLinkAboutMFP17001800DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17001800 IVR Number: 17001800 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:04/21/2017Applica!on Date:1823059245Parcel Number:68 RAINIER AVE S Permit Type :05/10/2017Issue Date:Franchise Permit Work Class:05/10/2018Expira!on Date :Minor U(lity Job Number:105084322Franchise Type :Electric Descrip!on:Install 3 phase j box, pm transformer and a 3 phase underground line extension. Contacts Name Address PhoneTypeBilling Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708ApplicantX VICKI HENSON POTELCO INC 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the condi(ons hereon and according to the approved plans and specifica(ons pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all (mes . I hereby cer(fy that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restora(on and Street Overlay Requirements . Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspec(ons and for ANY work in the Right of Way. Call 8 1 1 to locate underground u(li(es at least two full business days prior to any excava(on . In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consulta(on with the transmission pipeline company prior to performing any construc(on or excava(on ac(vi(es . This requirement to consult with the transmission pipeline company is in addi(on to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy 105084322 Carli Bunkelman 253-437-6708 Carli.Bunkelman@pse.com 68 Rainier Ave S Renton Starbucks Crew to install 3 phase j box, pm transformer and a 3 phase ug line extension to serve new customer "68". Potelco Inc.253-437-6708 BL005109 Poteli*227PL 4/19/2017 Justin Johnson 04/24/2017 MFP17001800 Holly Powers 5/4/2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form Potelco Inc. Brad Elkin 425-495-6489 6905 S. 228th St, Kent, WA 98032 Brad.Elkin@pse.com 68 Rainier Ave S 9:00 am - 3:00 pm Monday - Friday Carli Bunkelman 4/19/2017 Justin Johnson 04/24/2017 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 2020111111121114ONLYR3-5R RIGHT SHOULDER CLOSED W21-5aRROAD WORK AHEAD W20-1W1-4L100'100'100'W20-7A100'STOPFLAGG E RFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGROADWORKAHEADW20-1 350'RAINIER AVE SRAINIER AVE SHAYES PL SW1111 BUSSTOP STARBUCKSFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING M6-2R9-11SIDEWALKCLOSEDAHEAD R9-9SIDEWALKCLOSEDR9-9SIDEWALK CLOSED R9-11SIDEWALK CLOSED AHEAD FLAGGER WILL ASSIST PEDESTRIANSWITH SIDEWALK CLOSUREJ02J01V01S TOBIN STmaintain (2) 12' min. lanesX'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1300Job#10508432268 Rainier Ave S, Renton WAMarch 23, 2017Sheet 1 of 1 ryan.honeysett@pse.com(425) 457-5381CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-642528" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPVAULTVaultSHEET IS FORMATTEDFOR 11 X 17 11' x 9' WORK PIT 8' x 8' WORK PIT (1) RUN 3Ø 1/OAL JKT UG PRI CABLE ±30' AØEHC194, BØEHC195, CØEHC196 EXISTING CONDUIT FROM DIP1 TO J02 (1) 4" DB120 GREY PVC CONDUIT ±10' J01 TO DIP1 (1) RUN 3Ø 1/OAL JKT UG PRI CABLE ±30' AØEHC197, BØEHC198, CØEHC199 (1) 4" DB120 GREY PVC CONDUIT ±10' (1) RUN 3Ø 1/OAL JKT UG PRI CABLE ±20' AØ54980, BØ54981, CØ54982 (1) 4" DB120 GREY PVC CONDUIT ±10' 4' x 4' WORK PIT S TOBIN STRAINIER AVE SLAKE AVE S54 95STARBUCKS X170 SHOPPING CENTER AØ54980 BØ54981 CØ54982 317967-165820 112.5kVA 120/208V 317968-165818 NEW 1/OAL (+&$‘ (+&%‘ (+&&‘ NEW 1/OAL (+&$‘ (+&%‘ (+&&‘317970-165831 CØADW830 GAS PHONE CABLE TV 594113508 104289608 PROJECT PHASE PWR NOTIF#ORDER# Superior PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)105084322Owner / Developer Contact Info officeATTN: BURKHEIMER FAMILY, LLC 1326 5TH AVENUE #708 SEATTLE, WA 98101 TED DIMOF 206-323-4144 N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP BRAD ELKIN 253-395-6872 3/8/17 BRAD ELKIN 253-395-6872 3/8/17 C. SNYDER 714-893-2405 3/15/17 REQUIRED RENTON RENTON STARBUCKS 3PH JBOX CUT-IN, 3PH UG L/E & TRF SET 68 RAINIER AVENUE S., RENTON, WA 98055 PSE 105084322 AS NOTED 1/1 KING CSPSKEIN NE18-T23N-R05E 2305E069 2305E076 PCR-13 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD 2305E069 504061832 105084322 E-Mail: Cell Phone: Project Manager Contact Information: Manager:BRAD ELKIN 253-395-6872 Ext. 82-6872 bradley.elkin@pse.com ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 504419758 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SITE MAP SCALE: 1" = 50' CIRCUIT FEET ADDED: 30'POWER GENERAL NOTES - COMMERCIAL PROJECT 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. JOB SITE CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PCR-13 5.06.16 266 253 212 3.82 3.82 3.82 269.82 256.82 215.82 SITE SPECIFIC NOTES J01: 317968-165818 -INSTALL 4'-8" x 7'-0" VAULT & COVER -INSTALL (3) 4-POS J-BOX -INSTALL (9) L/B ELBOWS & (3) DUST CAPS -INSTALL GRID # V01: 317967-165820 -INSTALL 4'-8" SQ VAULT W/ 4'-8" x 5'-6" COVER ,167$//N9$‘3075)9 -INSTALL (3) L/B ELBOWS -INSTALL SECONDARY CONNECTORS -INSTALL GRID # -CONNECT & TAG CUSTOMER UG SVC (1 RUN OF UNK) SPAN SPECIFIC NOTES PSE TO INSTALL NEW PRIMARY CABLE & CONDUIT IN CUSTOMER PROVIDED TRENCH & EXCAVATION -SEE PRIMARY CABLE & CONDUIT TABLE CIVIL CONTRACTOR & CUSTOMER NOTES THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 -REQUIRED TO PROVIDE 11' X 9' WORK PIT AT J01 -REQUIRED TO PROVIDE 8' X 8' WORK PIT AT V01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT AT DIP1 & DIP2 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -EXCAVATION, TRENCH & L&I INSPECTIONS ARE REQUIRED 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE CUSTOMER TRENCHING IN CITY, COUNTY OR WSDOT R.O.W NOTES THE CUSTOMER IS RESPONSIBLE FOR REVIEWING THE MUNICIPALITIES' TRENCHING REQUIREMENTS UNDER THE PERMIT. ALL INSPECTIONS ARE REQUIRED BY PSE -IF A PRE-CON MEETING IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP & SCHEDULE A MEETING WITH THE MUNICIPALITY PRIOR TO ANY EXCAVATION OR INSTALLATION BEGINNING. ELECTRICIAN & CUSTOMER NOTES THE CUSTOMER IS RESPONSIBLE TO COORDINATE NEW 400-AMP METER INSTALLATION WITH PUGET SOUND ENERGY PROJECT MANAGER & THE METERING DEPARTMENT UPON L&I INSPECTION APPROVAL PSE CONTACT INFORMATION: -METER DEPARTMENT - DAVE MUTSCHLER AT (206) 396-2145 -PROJECT MANAGER - BRAD ELKIN AT (253) 395-6872 NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE Sq. Footage: 2034 SQ FT Panel Size: 400 AMP Heat Type: GAS Est. Demand: 70kW LRC: 65A % V. Drop: 2.7% (208V) % Flicker: 1.0% (208V) FAULT CURRENT TABLE ‘3075$16)250(5 <9 208V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT V01 112.5 kVA 0.3 1.55 26,900 AMPS JOB SITE TOP VIEW Excavation - 10-1/3 cubic yards SIDE VIEW Rock Crushed 6" 4'-4" 2" 8'-0" 4'-8" 3'-6" 4'-8" 6" 20" 4'-8"5'-6" 44" 8'-0" No Secondary PSE Primary Conduit Customer's service wire conduits may enter at any corner other than the corner where the primary cable enters the vault. VAULT & EXCAVATION DETAIL @ V01 NOT TO SCALE 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" VAULT & EXCAVATION DETAIL @ J01 NOT TO SCALE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE J01 DIP1 4 1 10 -1 --CONDUIT ONLY - J01 J02 CABLE ONLY 131 131 1/0 AL JKT 30 EHC194 EHC195 EHC196 - J01 DIP2 4 1 10 ----105 105 1/0 AL JKT 20 54980 54981 54982 - J01 V01 4 1 10 1 ---154 155 1/0 AL JKT 30 EHC197 EHC198 EHC199 - 4" PVC (FT) & BENDS =30 1 1 0 0 1/0 AL JKT TOTAL (FT) =240 VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED J01 317968 165818 5' x 7' x 5' Matid: 7663200 9 3 V01 317967 165820 4'8" x 4'8" x 3'6" Matid: 7663900 112.5KVA MP TRF 120/208V Matid: 6258050 3 0 CIRCUIT FEET REMOVED: 20' UNDERGROUND CIRCUIT MAP SCALE: 1" = 100' Perm. Service PRIMARY CABLE TRENCH DETAIL NOT TO SCALE Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 4" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 317967-165820 112.5kVA COOLING FINS ACCESS CONCRETE MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR CURB OR EDGE OF PAVEMENT TYP. PAD & TRANS- FORMER DOOR 5' MIN5' MIN 10' MIN 5' MIN 5' MIN 3' MIN 3' MIN 3' MIN ROAD OR PARKING AREA PAD REQUIRED WORK SPACE AREA EDGE OF PAVEMENT