HomeMy WebLinkAboutMFP17001809DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17001809
IVR Number: 17001809
Permit Inrman
Permit Name:Puget Sound Energy - Electric
Address/Lcan :04/21/2017Aican Date :3340401416Parce Number :311 S 15TH ST
Permit Tye :05/10/2017Issue Date:Franchise
Permit Wrk Cass :05/10/2018Eiran Date :Minor lity
Jb Number :104290057Franchise Tye :Electric
Descrin:nstall riser on eisng ole P01 and ull wire in 3" conduit aroimately 5' to roerty.
Cntacts
Name Address PhneTyeBiing
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708AlicantX
VCK HENSON
POTELCO NC
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Eectrica Cntractr : POTEL *344O4
Cnstrucn Cntractr : POTEL *227PL
CTY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
enera Cndins & Signature
Permission is herey gien or the work descried o n this ermit according to the condions hereon and according to the aroed
lans and secicaons ertaining thereto, suject to comliance with the Ordinance o the City o Ren ton.
This ermit and lans must e osted at the jo sit e at all mes .
herey cery that no work is to e done ecet a s descried aoe and in aroed lans, and that w ork is to conorm to Renton
Trench Restoraon and Street Oerlay Reuirements .
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in adance to schedule an inse cons and or ANY work in
the Right o Way.
Call 8 1 1 to locate underground ulies at least two ull us iness days rior to any ecaaon .
n accordance with RCW 19.122.033(4) the ermit hol der is reuired to contact (Williams Northwest Pie line at 425.868.1010) (Olymic
Pieline at 206.510.0575)(Puget Sound Energy at 425 .457.5816) to reuest a consultaon with the transm ission ieline comany rior
to erorming any construcon or ecaaon acies . This reuirement to consult with the transmissio n ieline comany is in
addion to the reuirement to Call eore You ig a s reuired in RCW 19.122.
(ate )(Signature)
Page 1 o 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy
104290057
Carli Bunkelman
253-437-6708
Carli.Bunkelman@pse.com
311 S 15th St Renton Project
Crew to install riser on ex pole P01 and pull in wire in customer installed 3" conduit
approx 5' to pvt property for new service to "311".
5'
Potelco Inc.253-437-6708
BL005109 Poteli*227PL
4/18/2017
Justin Johnson 04/24/2017
Holly Powers 5/4/2017
MFP17001809
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
Potelco Inc.
Carli Bunkelman 253-437-6708
6905 S. 228th St, Kent, WA 98032
Carli.Bunkelman@pse.com
311 S 15th St
8:00 am - 3:00 pm
Monday - Friday
Carli Bunkelman 4/18/2017
Justin Johnson 04/24/2017
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
P01S 15TH AVESHATTUCK AVE S
LAKE AVE S
DAVIS AVE S
111111111212
1212S 15TH AVESHATTUCK AVE S11111010STOPFLAGG
ER
STOPFLAGGE
R
ONE LANE
ROAD
AHEAD W20-4ROAD
WORK
AHEAD W20-1W20-7A100'100'100'ROADWORKAHEADW20-1
100'ROADWORKAHEADW20-1100'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7A100'100'100'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A100'100'100'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1
W20-7A100'100'100'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING NCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#104290057311 S 15TH ST RENTON, WAMARCH 30, 2017SALLY.BERGMAN@pse.com(425) 398-6003PSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOP
C317325-165886
25T
UNK
#4 CU#4CUABC ABC#4CU ABC317330-165886
306
312
1506
317 327
322PVT
1514317309-165890
25kVA 120/240v
1408 322 1411
234
1507
1509
1503
317325-165909
DAVIS AVE SS 15TH AVE S 15TH AVE
NEW
"311"
GRA
25
70'45'
JOB SITE
JOB SITE
4' X 4'
WORK PIT
3/8 CUBIC
YARD OF SAND
4' X 4'
WORK PIT
CUSTOMER TO INSTALL
±115' OF SCH'L 80 GRAY
PVC CONDUIT
PSE TO INSTALL ±160' OF
4/0 UG TPX
503756937 104290057
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)104290057Owner / Developer Contact Info
officeATTN:
ROCK PL, LLC
707 S GRADY WAY, SUITE 600
RENTON, WA 98047
OLIVIER 206-406-5993
N
Vicinity Map
N/A
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT ONE-LINE DIAGRAM
SCALE: NONE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER-SUPPLIED SERVICE TRENCH
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVE GOODALE
425-495-7049
DAVE.GOODALE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DAVE GOODALE 425-495-7049 03/16/17
JUSTIN HANG 253-508-7880 03/16/17
N/A N/A N/A
JUSTIN HANG 253-508-7880 03/16/17
N/A CITY OF RENTON
RENTON PROJECT
INSTALL OH-UG SECONDARY PERMANENT SERVICE
311 S 15TH ST, RENTON, WA 98055
N/A N/A
N/A 104290057
AS NOTED 1/1
KING N/A N/A CSPSKEIN
T23N, R05E, SEC 19 NW N/A N/A
2305E076 2305E076 2305E076NW GRA-25
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SCALE: 1" = 50'
SITE SPECIFIC NOTES
P01 GRID #317325-165895:
-INSTALL 1-3" CONDUIT RISER ON EXISTING S/O BRACKET
M01:
-INSTALL 1-200AMP METER
SPAN SPECIFIC NOTES
P01-M01:
&86720(572,167$//
2)6&+
/*5$<39&
CONDUIT
36(72,167$//
2)8*73;
MAPS & RECORDS NOTE
LOCATION OF POLE AT P01 TO BE UPDATED AS SHOWN IN
THE THIS DESIGN
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
CUSTOMER DEVELOPMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING,
SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS #6750.6500.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS
ON SELECT BACKFILL**
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT
AT POLE P01.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT
AND 3/4 CUBIC YARD OF SAND AT M01.
-CUSTOMER IS REQUIRED TO PROVIDE & INSTALL 3/8"
NON-POLY PULL ROPE IN ALL CONDUITS.
-CUSTOMER MUST HAVE A COPY OF PSE PROVIDED
PERMIT ON SITE DURING DIGGING IN CITY RIGHT OF WAY.
-CUSTOMER IS REQUIRED TO INSTALL METER BASE ON
FRONT 1/3 OF BUILDING.
ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE
BEFORE FINAL BACKFILL.
ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED
72HRS BEFORE CONSTRUCTION.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
256216.6224
-1.6-
256215224
2016
GRA-25
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3600SQ.
320AMPS
GAS
11KW
140A
1.5%
3.4
CIRCUIT FEET ADDED: 0'
Justin, Is this a joint trench application????
- We have already issued a gas permit for the
home a couple of months ago. I don't know if
Century link is going to go in or if they just copied
over the detail by accident.