Loading...
HomeMy WebLinkAboutMFP17001809DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17001809 IVR Number: 17001809 Permit Inrman Permit Name:Puget Sound Energy - Electric Address/Lcan :04/21/2017Aican Date :3340401416Parce Number :311 S 15TH ST Permit Tye :05/10/2017Issue Date:Franchise Permit Wrk Cass :05/10/2018Eiran Date :Minor lity Jb Number :104290057Franchise Tye :Electric Descrin:nstall riser on eisng ole P01 and ull wire in 3" conduit aroimately 5' to roerty. Cntacts Name Address PhneTyeBiing Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708AlicantX VCK HENSON POTELCO NC 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Eectrica Cntractr : POTEL *344O4 Cnstrucn Cntractr : POTEL *227PL CTY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner enera Cndins & Signature Permission is herey gien or the work descried o n this ermit according to the condions hereon and according to the aroed lans and secicaons ertaining thereto, suject to comliance with the Ordinance o the City o Ren ton. This ermit and lans must e osted at the jo sit e at all mes . herey cery that no work is to e done ecet a s descried aoe and in aroed lans, and that w ork is to conorm to Renton Trench Restoraon and Street Oerlay Reuirements . Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in adance to schedule an inse cons and or ANY work in the Right o Way. Call 8 1 1 to locate underground ulies at least two ull us iness days rior to any ecaaon . n accordance with RCW 19.122.033(4) the ermit hol der is reuired to contact (Williams Northwest Pie line at 425.868.1010) (Olymic Pieline at 206.510.0575)(Puget Sound Energy at 425 .457.5816) to reuest a consultaon with the transm ission ieline comany rior to erorming any construcon or ecaaon acies . This reuirement to consult with the transmissio n ieline comany is in addion to the reuirement to Call eore You ig a s reuired in RCW 19.122. (ate )(Signature) Page 1 o 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy 104290057 Carli Bunkelman 253-437-6708 Carli.Bunkelman@pse.com 311 S 15th St Renton Project Crew to install riser on ex pole P01 and pull in wire in customer installed 3" conduit approx 5' to pvt property for new service to "311". 5' Potelco Inc.253-437-6708 BL005109 Poteli*227PL 4/18/2017 Justin Johnson 04/24/2017 Holly Powers 5/4/2017 MFP17001809 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form Potelco Inc. Carli Bunkelman 253-437-6708 6905 S. 228th St, Kent, WA 98032 Carli.Bunkelman@pse.com 311 S 15th St 8:00 am - 3:00 pm Monday - Friday Carli Bunkelman 4/18/2017 Justin Johnson 04/24/2017 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). P01S 15TH AVESHATTUCK AVE S LAKE AVE S DAVIS AVE S 111111111212 1212S 15TH AVESHATTUCK AVE S11111010STOPFLAGG ER STOPFLAGGE R ONE LANE ROAD AHEAD W20-4ROAD WORK AHEAD W20-1W20-7A100'100'100'ROADWORKAHEADW20-1 100'ROADWORKAHEADW20-1100'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7A100'100'100'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A100'100'100'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1 W20-7A100'100'100'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#104290057311 S 15TH ST RENTON, WAMARCH 30, 2017SALLY.BERGMAN@pse.com(425) 398-6003PSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOP C317325-165886 25T UNK #4 CU#4CUABC ABC#4CU ABC317330-165886 306 312 1506 317 327 322PVT 1514317309-165890 25kVA 120/240v 1408 322 1411 234 1507 1509 1503 317325-165909 DAVIS AVE SS 15TH AVE S 15TH AVE NEW "311" GRA 25 70'45' JOB SITE JOB SITE 4' X 4' WORK PIT 3/8 CUBIC YARD OF SAND 4' X 4' WORK PIT CUSTOMER TO INSTALL ±115' OF SCH'L 80 GRAY PVC CONDUIT PSE TO INSTALL ±160' OF 4/0 UG TPX 503756937 104290057 PROJECT PHASE PWR NOTIF#ORDER# Superior THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)104290057Owner / Developer Contact Info officeATTN: ROCK PL, LLC 707 S GRADY WAY, SUITE 600 RENTON, WA 98047 OLIVIER 206-406-5993 N Vicinity Map N/A FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT ONE-LINE DIAGRAM SCALE: NONE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CUSTOMER-SUPPLIED SERVICE TRENCH ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE GOODALE 425-495-7049 DAVE.GOODALE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAVE GOODALE 425-495-7049 03/16/17 JUSTIN HANG 253-508-7880 03/16/17 N/A N/A N/A JUSTIN HANG 253-508-7880 03/16/17 N/A CITY OF RENTON RENTON PROJECT INSTALL OH-UG SECONDARY PERMANENT SERVICE 311 S 15TH ST, RENTON, WA 98055 N/A N/A N/A 104290057 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SEC 19 NW N/A N/A 2305E076 2305E076 2305E076NW GRA-25 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SCALE: 1" = 50' SITE SPECIFIC NOTES P01 GRID #317325-165895: -INSTALL 1-3" CONDUIT RISER ON EXISTING S/O BRACKET M01: -INSTALL 1-200AMP METER SPAN SPECIFIC NOTES P01-M01: &86720(572,167$//“ 2)6&+ /*5$<39& CONDUIT 36(72,167$//“ 2)  8*73; MAPS & RECORDS NOTE LOCATION OF POLE AT P01 TO BE UPDATED AS SHOWN IN THE THIS DESIGN TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CUSTOMER DEVELOPMENT NOTES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS #6750.6500. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT POLE P01. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AND 3/4 CUBIC YARD OF SAND AT M01. -CUSTOMER IS REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS. -CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE DURING DIGGING IN CITY RIGHT OF WAY. -CUSTOMER IS REQUIRED TO INSTALL METER BASE ON FRONT 1/3 OF BUILDING. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL. ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTRUCTION. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE 256216.6224 -1.6- 256215224 2016 GRA-25 Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3600SQ. 320AMPS GAS 11KW 140A 1.5% 3.4 CIRCUIT FEET ADDED: 0' Justin, Is this a joint trench application???? - We have already issued a gas permit for the home a couple of months ago. I don't know if Century link is going to go in or if they just copied over the detail by accident.