Loading...
HomeMy WebLinkAboutP_Utility Plan Renton Project 34X11_104290057_V1_170419C317325-165886 25T UNK #4 CU#4CUABC ABC#4CU ABC317330-165886 306 312 1506 317 327 322PVT 1514317309-165890 25kVA 120/240v 1408 322 1411 234 1507 1509 1503 317325-165909 DAVIS AVE SS 15TH AVE S 15TH AVE NEW "311" GRA 25 70'45' JOB SITE JOB SITE 4' X 4' WORK PIT 3/8 CUBIC YARD OF SAND 4' X 4' WORK PIT CUSTOMER TO INSTALL ±115' OF SCH'L 80 GRAY PVC CONDUIT PSE TO INSTALL ±160' OF 4/0 UG TPX 503756937 104290057 PROJECT PHASE PWR NOTIF#ORDER# Superior THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)104290057Owner / Developer Contact Info officeATTN: ROCK PL, LLC 707 S GRADY WAY, SUITE 600 RENTON, WA 98047 OLIVIER 206-406-5993 N Vicinity Map N/A FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT ONE-LINE DIAGRAM SCALE: NONE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CUSTOMER-SUPPLIED SERVICE TRENCH ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE GOODALE 425-495-7049 DAVE.GOODALE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAVE GOODALE 425-495-7049 03/16/17 JUSTIN HANG 253-508-7880 03/16/17 N/A N/A N/A JUSTIN HANG 253-508-7880 03/16/17 N/A CITY OF RENTON RENTON PROJECT INSTALL OH-UG SECONDARY PERMANENT SERVICE 311 S 15TH ST, RENTON, WA 98055 N/A N/A N/A 104290057 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SEC 19 NW N/A N/A 2305E076 2305E076 2305E076NW GRA-25 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SCALE: 1" = 50' SITE SPECIFIC NOTES P01 GRID #317325-165895: -INSTALL 1-3" CONDUIT RISER ON EXISTING S/O BRACKET M01: -INSTALL 1-200AMP METER SPAN SPECIFIC NOTES P01-M01: &86720(572,167$//“ 2)6&+ /*5$<39& CONDUIT 36(72,167$//“ 2)  8*73; MAPS & RECORDS NOTE LOCATION OF POLE AT P01 TO BE UPDATED AS SHOWN IN THE THIS DESIGN TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CUSTOMER DEVELOPMENT NOTES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS #6750.6500. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT POLE P01. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AND 3/4 CUBIC YARD OF SAND AT M01. -CUSTOMER IS REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS. -CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE DURING DIGGING IN CITY RIGHT OF WAY. -CUSTOMER IS REQUIRED TO INSTALL METER BASE ON FRONT 1/3 OF BUILDING. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL. ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTRUCTION. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE 256216.6224 -1.6- 256215224 2016 GRA-25 Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3600SQ. 320AMPS GAS 11KW 140A 1.5% 3.4 CIRCUIT FEET ADDED: 0'