HomeMy WebLinkAboutP_Utility Plan Renton Project 34X11_104290057_V1_170419C317325-165886
25T
UNK
#4 CU#4CUABC ABC#4CU ABC317330-165886
306
312
1506
317 327
322PVT
1514317309-165890
25kVA 120/240v
1408 322 1411
234
1507
1509
1503
317325-165909
DAVIS AVE SS 15TH AVE S 15TH AVE
NEW
"311"
GRA
25
70'45'
JOB SITE
JOB SITE
4' X 4'
WORK PIT
3/8 CUBIC
YARD OF SAND
4' X 4'
WORK PIT
CUSTOMER TO INSTALL
±115' OF SCH'L 80 GRAY
PVC CONDUIT
PSE TO INSTALL ±160' OF
4/0 UG TPX
503756937 104290057
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)104290057Owner / Developer Contact Info
officeATTN:
ROCK PL, LLC
707 S GRADY WAY, SUITE 600
RENTON, WA 98047
OLIVIER 206-406-5993
N
Vicinity Map
N/A
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT ONE-LINE DIAGRAM
SCALE: NONE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER-SUPPLIED SERVICE TRENCH
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVE GOODALE
425-495-7049
DAVE.GOODALE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DAVE GOODALE 425-495-7049 03/16/17
JUSTIN HANG 253-508-7880 03/16/17
N/A N/A N/A
JUSTIN HANG 253-508-7880 03/16/17
N/A CITY OF RENTON
RENTON PROJECT
INSTALL OH-UG SECONDARY PERMANENT SERVICE
311 S 15TH ST, RENTON, WA 98055
N/A N/A
N/A 104290057
AS NOTED 1/1
KING N/A N/A CSPSKEIN
T23N, R05E, SEC 19 NW N/A N/A
2305E076 2305E076 2305E076NW GRA-25
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SCALE: 1" = 50'
SITE SPECIFIC NOTES
P01 GRID #317325-165895:
-INSTALL 1-3" CONDUIT RISER ON EXISTING S/O BRACKET
M01:
-INSTALL 1-200AMP METER
SPAN SPECIFIC NOTES
P01-M01:
&86720(572,167$//
2)6&+
/*5$<39&
CONDUIT
36(72,167$//
2)8*73;
MAPS & RECORDS NOTE
LOCATION OF POLE AT P01 TO BE UPDATED AS SHOWN IN
THE THIS DESIGN
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
CUSTOMER DEVELOPMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING,
SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS #6750.6500.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS
ON SELECT BACKFILL**
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT
AT POLE P01.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT
AND 3/4 CUBIC YARD OF SAND AT M01.
-CUSTOMER IS REQUIRED TO PROVIDE & INSTALL 3/8"
NON-POLY PULL ROPE IN ALL CONDUITS.
-CUSTOMER MUST HAVE A COPY OF PSE PROVIDED
PERMIT ON SITE DURING DIGGING IN CITY RIGHT OF WAY.
-CUSTOMER IS REQUIRED TO INSTALL METER BASE ON
FRONT 1/3 OF BUILDING.
ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE
BEFORE FINAL BACKFILL.
ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED
72HRS BEFORE CONSTRUCTION.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
256216.6224
-1.6-
256215224
2016
GRA-25
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3600SQ.
320AMPS
GAS
11KW
140A
1.5%
3.4
CIRCUIT FEET ADDED: 0'