Loading...
HomeMy WebLinkAboutP_Utility Plan MCI RENTON_186048141 TK#106544_V1_170504SITE PLAN: P01 & P02 SCALE: 1:100 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) SITE SPECIFIC NOTES P01: 316555-166901 - INSTALL NEW 55' CL -1 POLE W/ GROUNDS - INSTALL NEW 30 DBL PIN FIBERGLASS ARM W/ DBL PTP STD#6033.2022 (ANGC313) - INSTALL NEW COMMON NEUTRAL RIGID CLEVIS STD#6033.2022 (ANGC313) - INSTALL 2 NEW RIGID CLEVIS FOR TRIPLEX (1- SOUTH, 1- WEST) - TRANSFER OH 25kVA TRANSFORMER & CUTOUT - TRANSFER & EXTEND (1) 2" RISER & UG TRIPLEX TO NEUTRAL HEIGHT - TRANSFER & RECONNECT ALL TRIPLEX - TRANSFER STREETLIGHT & EXTEND STREETLIGHT SERVICE STD#700.8000 (FIG. 13) - SEE SPAN NOTES FOR SPAN GUY REPLACEMENT - COMMUNICATIONS TO TRANSFER THEIR OWN WIRES - REMOVE & RETIRE EXISTING 50' CL -1 POLE P02: 316562-166899 - INSTALL 3/8" NEW NEUTRAL DOWN TO EXISTING ANCHOR NORTH - INSTALL STREETLIGHT SERVICE MOLDING (MAT. ID- 8920300) SPAN NOTES P01 - P02 - REPLACE PRIMARY SPAN GUY WITH NEW 7/16" SPAN GUY - INSTALL NEW 3/8" NEUTRAL SPAN GUY POWER GENERAL NOTES 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. All work is to be done in accordance with local municipal and county permit requirements as applicable. 5. Inclement weather conditions may cause delays in construction times and dates. POLE RETIREMENT TABLE TEMP TRANSFERS 12602 SITE POLE DATA POLE B WAN 5f_ 172SrX97°1 12632 e/ V X 10oT V. m ¢I :c. 9 t 6j� C 253.327.3162 3/7/17 # TEL TV 12710 TRAN RMVD ID NUMBER 316576-166895 o 5T X542 U�...... B X372 14orX9332 X12295 N/A N/A n NO I 600A Emer Sect Gas Wk Ctr N/A N/A L IO{ LU GRID # iA CLASS YEAR TOPPED RMVD A I — 316562/,—,--,, 316565.166912 (101081596) 2� OH CKT MAP 2305E136 166899 , 316565.166929 50 12520 UNK I Q PAN JOINT FACILITIES ARRANGEMENTS SE PETROVITSKY RD i 316558-166882 N/A N/A N/A v CONTACT ROL 33541ACMFCSR PHONE# 13 316559-166915 316558-166929 5E 161st P1 23�05E112 ROL-13 PETROVITSKY RD REPLACE DISTRIBUTION POLE, INSTALL SPAN & DOWN GUYS 12601 SE PETROVITSKY RD RENTON, WA 98058 INCIDENT MAOP N/A N/A Gas Order Elect Order N/A 186048141 SCALE PAGE 1:100 1 1/1 10kVA 1201240v ISM 1201240Y 316553-166876, A �� \\ P O 1 s�c 316555 RVA 12012 12�V240v b sE 166901 316550.166885 J. 316546-166875 TREE TRIMMING 37.5kVA 1201240Y REQUIRED 16539-166857 12615 12627 12711 12601 SITE PLAN: P01 & P02 SCALE: 1:100 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) SITE SPECIFIC NOTES P01: 316555-166901 - INSTALL NEW 55' CL -1 POLE W/ GROUNDS - INSTALL NEW 30 DBL PIN FIBERGLASS ARM W/ DBL PTP STD#6033.2022 (ANGC313) - INSTALL NEW COMMON NEUTRAL RIGID CLEVIS STD#6033.2022 (ANGC313) - INSTALL 2 NEW RIGID CLEVIS FOR TRIPLEX (1- SOUTH, 1- WEST) - TRANSFER OH 25kVA TRANSFORMER & CUTOUT - TRANSFER & EXTEND (1) 2" RISER & UG TRIPLEX TO NEUTRAL HEIGHT - TRANSFER & RECONNECT ALL TRIPLEX - TRANSFER STREETLIGHT & EXTEND STREETLIGHT SERVICE STD#700.8000 (FIG. 13) - SEE SPAN NOTES FOR SPAN GUY REPLACEMENT - COMMUNICATIONS TO TRANSFER THEIR OWN WIRES - REMOVE & RETIRE EXISTING 50' CL -1 POLE P02: 316562-166899 - INSTALL 3/8" NEW NEUTRAL DOWN TO EXISTING ANCHOR NORTH - INSTALL STREETLIGHT SERVICE MOLDING (MAT. ID- 8920300) SPAN NOTES P01 - P02 - REPLACE PRIMARY SPAN GUY WITH NEW 7/16" SPAN GUY - INSTALL NEW 3/8" NEUTRAL SPAN GUY POWER GENERAL NOTES 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. All work is to be done in accordance with local municipal and county permit requirements as applicable. 5. Inclement weather conditions may cause delays in construction times and dates. POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE POLE DATA POLE B WAN 5f_ 172SrX97°1 2 STS 1 A .B A: AO 3. 10oT V. m ¢I :c. 9 t 6j� C 253.327.3162 3/7/17 # TEL TV FIBER TRAN RMVD ID NUMBER SITES o 5T X542 U�...... B X372 14orX9332 X12295 N/A N/A n NO I 600A Emer Sect Gas Wk Ctr N/A N/A L IO{ DRAWN BY SIERRA VEGA GRID # HEIGHT CLASS YEAR TOPPED RMVD A I — 1sT X9551 65T Gy &r 181 ST I of $ 00312 . OH CKT MAP 2305E136 P01 316555-166901 50 1 UNK I Q PAN JOINT FACILITIES ARRANGEMENTS tlre�vstslt N/A N/A N/A -{POLE �TABLE (NEW)-- ^�- Site Pole Data # Grid # Height Class Year Remarks / Location Ref. P01 316555-166901 55 1 2017 PSE Equip # POTELCO DESIGN AND QUALITY ASSURANCE ❑ This design complies with PSE Design/Engineering Standards. Any/all variations have been pre-approved/documented by the appropriate PSE Representative. Signature Print Name Date SK553 JAS_-1UUT�\�A 14I 1 e' -1 1 -,i B 4/GLJ/ T h+ % NOTIF# ORDER# •' q _ B f I I SE 171 PL A.. B 504174583 186048141 :10oT SK3A A,B 1_l—�~_Y—Y—Y— Y—YrY—a B WAN 5f_ 172SrX97°1 2 STS 1 A .B A: AO 3. 10oT V. m ¢I :c. 9 t 6j� C 253.327.3162 3/7/17 30 Q 34ti:Z g. 30'.. C'. le NI ^I �2 100T 07 m A A. X11599 t00T- I N B. 30 11% 30 ENGR - POWER SIERRA VEGA 5 ST I ^ YA:• -.• 3p. ..... 100T :% 0/ ( 40T 40T 1 06. X3401 X8822 X37 :� ti-.: 440 40T 106 65T R SE 176 ST e 40 SITES o 5T X542 U�...... B X372 14orX9332 X12295 N/A N/A n NO I 600A Emer Sect Gas Wk Ctr N/A N/A L IO{ DRAWN BY SIERRA VEGA ? B IQ — A -I ")bl---- ° JOB CHECKED BY q 15 I 1/4 SEC SE -28, T23, R05E I SITES •.> PLAT MAP N/A A I — 1sT X9551 65T Gy &r 181 ST I of $ 00312 . OH CKT MAP 2305E136 X10756 A25T S2 1B2 ST ST 15T I ICIRCUITNO 1FOREMAN ROL-13 _ I X46831 W I I � I Q PAN JOINT FACILITIES ARRANGEMENTS OVERHEAD CIRCUIT MAP NOT TO SCALE ENGR-1: #106544 FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. F-1Deviationsnoted on the As -built and their reason. ❑ 1 certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Installation Removal Expense 504174583 186048141 101104382 108099888 186048283 Vicinity Map N/A CAl I /Rnn1 A9A_9999 1 Developer "Locates Required" "Outages Required" "Flagging Required" Yes Yes x PSE 2 BUSINESS DAYS BEFORE YOU DIG No X No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES Yes x No REAL ESTATE/EASEMENT PERMIT Yes x No N/A CITY OF RENTON 3 "/w N lest PHONE NO DATE 2 PROJECT MGR SIERRA VEGA 253.327.3162 3/7/17 1 JOB ENGR - POWER SIERRA VEGA 253.327.3162 3/17/17 ti-.: BY SITES ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr N/A N/A POWER WK CTR QCSOKE DRAWN BY SIERRA VEGA 253.327.3162 3/17/17 CHECKED BY 1/4 SEC SE -28, T23, R05E OP MAP N/A PLAT MAP N/A APPROVED BY — FOREMAN #1 U -MAP NO (POWER) 2305E112 OH CKT MAP 2305E136 JUGCKTMAP N/A ICIRCUITNO 1FOREMAN ROL-13 #2 IMAPPING ANA JOINT FACILITIES ARRANGEMENTS tlre�vstslt N/A N/A N/A ts1 Its CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A 5E 161st P1 23�05E112 ROL-13 PETROVITSKY RD REPLACE DISTRIBUTION POLE, INSTALL SPAN & DOWN GUYS 12601 SE PETROVITSKY RD RENTON, WA 98058 INCIDENT MAOP N/A N/A Gas Order Elect Order N/A 186048141 SCALE PAGE 1:100 1 1/1 J. CAl I /Rnn1 A9A_9999 1 Developer "Locates Required" "Outages Required" "Flagging Required" Yes Yes x PSE 2 BUSINESS DAYS BEFORE YOU DIG No X No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES Yes x No REAL ESTATE/EASEMENT PERMIT Yes x No N/A CITY OF RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR SIERRA VEGA 253.327.3162 3/7/17 1 ENGR - POWER SIERRA VEGA 253.327.3162 3/17/17 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr N/A N/A POWER WK CTR QCSOKE DRAWN BY SIERRA VEGA 253.327.3162 3/17/17 CHECKED BY 1/4 SEC SE -28, T23, R05E OP MAP N/A PLAT MAP N/A APPROVED BY — FOREMAN #1 U -MAP NO (POWER) 2305E112 OH CKT MAP 2305E136 JUGCKTMAP N/A ICIRCUITNO 1FOREMAN ROL-13 #2 IMAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A SPUGET OUND ENERGY DESIGNED BY POTELCO 23�05E112 ROL-13 PETROVITSKY RD REPLACE DISTRIBUTION POLE, INSTALL SPAN & DOWN GUYS 12601 SE PETROVITSKY RD RENTON, WA 98058 INCIDENT MAOP N/A N/A Gas Order Elect Order N/A 186048141 SCALE PAGE 1:100 1 1/1