HomeMy WebLinkAboutP_Utility Plan MCI RENTON_186048141 TK#106544_V1_170504SITE PLAN: P01 & P02
SCALE: 1:100
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
SITE SPECIFIC NOTES
P01: 316555-166901
- INSTALL NEW 55' CL -1 POLE W/ GROUNDS
- INSTALL NEW 30 DBL PIN FIBERGLASS ARM W/ DBL PTP STD#6033.2022 (ANGC313)
- INSTALL NEW COMMON NEUTRAL RIGID CLEVIS STD#6033.2022 (ANGC313)
- INSTALL 2 NEW RIGID CLEVIS FOR TRIPLEX (1- SOUTH, 1- WEST)
- TRANSFER OH 25kVA TRANSFORMER & CUTOUT
- TRANSFER & EXTEND (1) 2" RISER & UG TRIPLEX TO NEUTRAL HEIGHT
- TRANSFER & RECONNECT ALL TRIPLEX
- TRANSFER STREETLIGHT & EXTEND STREETLIGHT SERVICE STD#700.8000 (FIG. 13)
- SEE SPAN NOTES FOR SPAN GUY REPLACEMENT
- COMMUNICATIONS TO TRANSFER THEIR OWN WIRES
- REMOVE & RETIRE EXISTING 50' CL -1 POLE
P02: 316562-166899
- INSTALL 3/8" NEW NEUTRAL DOWN TO EXISTING ANCHOR NORTH
- INSTALL STREETLIGHT SERVICE MOLDING (MAT. ID- 8920300)
SPAN NOTES
P01 - P02
- REPLACE PRIMARY SPAN GUY WITH NEW 7/16" SPAN GUY
- INSTALL NEW 3/8" NEUTRAL SPAN GUY
POWER GENERAL NOTES
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this
work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three
(3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work
to get the underground facilities located.
4. All work is to be done in accordance with local municipal and county permit requirements as applicable.
5. Inclement weather conditions may cause delays in construction times and dates.
POLE RETIREMENT TABLE
TEMP TRANSFERS
12602
SITE
POLE DATA
POLE
B WAN 5f_ 172SrX97°1
12632
e/ V
X
10oT V.
m ¢I
:c. 9 t
6j� C
253.327.3162 3/7/17
#
TEL
TV
12710
TRAN
RMVD
ID NUMBER
316576-166895
o
5T X542 U�...... B
X372 14orX9332 X12295
N/A N/A
n NO I 600A
Emer Sect Gas Wk Ctr
N/A N/A
L IO{
LU
GRID #
iA
CLASS
YEAR
TOPPED
RMVD
A I
—
316562/,—,--,,
316565.166912
(101081596)
2�
OH CKT MAP
2305E136
166899
, 316565.166929
50
12520
UNK
I Q PAN
JOINT FACILITIES ARRANGEMENTS
SE PETROVITSKY RD
i
316558-166882
N/A N/A N/A
v
CONTACT
ROL
33541ACMFCSR
PHONE#
13
316559-166915 316558-166929
5E 161st P1
23�05E112 ROL-13 PETROVITSKY RD
REPLACE DISTRIBUTION POLE, INSTALL SPAN & DOWN GUYS
12601 SE PETROVITSKY RD RENTON, WA 98058
INCIDENT MAOP
N/A N/A
Gas Order Elect Order
N/A 186048141
SCALE PAGE
1:100 1 1/1
10kVA 1201240v ISM 1201240Y
316553-166876, A
�� \\
P O 1
s�c
316555 RVA 12012
12�V240v b
sE
166901
316550.166885
J.
316546-166875
TREE TRIMMING
37.5kVA 1201240Y
REQUIRED
16539-166857
12615 12627
12711
12601
SITE PLAN: P01 & P02
SCALE: 1:100
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
SITE SPECIFIC NOTES
P01: 316555-166901
- INSTALL NEW 55' CL -1 POLE W/ GROUNDS
- INSTALL NEW 30 DBL PIN FIBERGLASS ARM W/ DBL PTP STD#6033.2022 (ANGC313)
- INSTALL NEW COMMON NEUTRAL RIGID CLEVIS STD#6033.2022 (ANGC313)
- INSTALL 2 NEW RIGID CLEVIS FOR TRIPLEX (1- SOUTH, 1- WEST)
- TRANSFER OH 25kVA TRANSFORMER & CUTOUT
- TRANSFER & EXTEND (1) 2" RISER & UG TRIPLEX TO NEUTRAL HEIGHT
- TRANSFER & RECONNECT ALL TRIPLEX
- TRANSFER STREETLIGHT & EXTEND STREETLIGHT SERVICE STD#700.8000 (FIG. 13)
- SEE SPAN NOTES FOR SPAN GUY REPLACEMENT
- COMMUNICATIONS TO TRANSFER THEIR OWN WIRES
- REMOVE & RETIRE EXISTING 50' CL -1 POLE
P02: 316562-166899
- INSTALL 3/8" NEW NEUTRAL DOWN TO EXISTING ANCHOR NORTH
- INSTALL STREETLIGHT SERVICE MOLDING (MAT. ID- 8920300)
SPAN NOTES
P01 - P02
- REPLACE PRIMARY SPAN GUY WITH NEW 7/16" SPAN GUY
- INSTALL NEW 3/8" NEUTRAL SPAN GUY
POWER GENERAL NOTES
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this
work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three
(3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work
to get the underground facilities located.
4. All work is to be done in accordance with local municipal and county permit requirements as applicable.
5. Inclement weather conditions may cause delays in construction times and dates.
POLE RETIREMENT TABLE
TEMP TRANSFERS
ST. LIGHT TRANSFERS
SITE
POLE DATA
POLE
B WAN 5f_ 172SrX97°1
2
STS 1 A .B A: AO
3.
10oT V.
m ¢I
:c. 9 t
6j� C
253.327.3162 3/7/17
#
TEL
TV
FIBER
TRAN
RMVD
ID NUMBER
SITES
o
5T X542 U�...... B
X372 14orX9332 X12295
N/A N/A
n NO I 600A
Emer Sect Gas Wk Ctr
N/A N/A
L IO{
DRAWN BY SIERRA VEGA
GRID #
HEIGHT
CLASS
YEAR
TOPPED
RMVD
A I
—
1sT X9551
65T Gy &r 181 ST
I of $ 00312 .
OH CKT MAP
2305E136
P01
316555-166901
50
1
UNK
I Q PAN
JOINT FACILITIES ARRANGEMENTS
tlre�vstslt
N/A N/A N/A
-{POLE �TABLE (NEW)-- ^�-
Site Pole Data
# Grid # Height Class Year Remarks / Location Ref.
P01 316555-166901 55 1 2017 PSE Equip #
POTELCO DESIGN AND
QUALITY ASSURANCE
❑ This design complies with PSE
Design/Engineering Standards.
Any/all variations have been
pre-approved/documented by the
appropriate PSE Representative.
Signature
Print Name
Date
SK553 JAS_-1UUT�\�A 14I 1 e' -1 1 -,i B 4/GLJ/
T h+ %
NOTIF# ORDER#
•' q _ B f I I SE 171 PL
A.. B
504174583 186048141
:10oT
SK3A
A,B 1_l—�~_Y—Y—Y—
Y—YrY—a
B WAN 5f_ 172SrX97°1
2
STS 1 A .B A: AO
3.
10oT V.
m ¢I
:c. 9 t
6j� C
253.327.3162 3/7/17
30 Q 34ti:Z g. 30'.. C'.
le NI
^I
�2 100T 07
m A A. X11599
t00T- I N B. 30 11% 30
ENGR - POWER SIERRA VEGA
5 ST I ^ YA:• -.• 3p. ..... 100T :% 0/ ( 40T 40T
1 06. X3401 X8822 X37
:�
ti-.:
440 40T 106 65T R SE 176 ST e
40
SITES
o
5T X542 U�...... B
X372 14orX9332 X12295
N/A N/A
n NO I 600A
Emer Sect Gas Wk Ctr
N/A N/A
L IO{
DRAWN BY SIERRA VEGA
? B IQ — A -I
")bl---- ° JOB
CHECKED BY
q 15 I
1/4 SEC
SE -28, T23, R05E
I
SITES •.>
PLAT MAP
N/A
A I
—
1sT X9551
65T Gy &r 181 ST
I of $ 00312 .
OH CKT MAP
2305E136
X10756 A25T S2 1B2 ST
ST 15T I
ICIRCUITNO 1FOREMAN
ROL-13
_
I X46831 W
I
I �
I Q PAN
JOINT FACILITIES ARRANGEMENTS
OVERHEAD CIRCUIT MAP
NOT TO SCALE
ENGR-1: #106544
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED & work Area left in CLEAN/SAFE Condition.
❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑ Field Changes RED -LINED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location on As -built.
❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
F-1Deviationsnoted on the As -built and their reason.
❑ 1 certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Foreman's Signature
Print Name Date
PROJECT PHASE
NOTIF# ORDER#
PWR Superior
Installation
Removal
Expense
504174583 186048141
101104382
108099888
186048283
Vicinity Map
N/A
CAl I /Rnn1 A9A_9999 1
Developer
"Locates Required"
"Outages Required"
"Flagging Required"
Yes Yes x PSE 2 BUSINESS DAYS BEFORE YOU DIG
No X No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
Yes x No REAL ESTATE/EASEMENT PERMIT
Yes x No N/A CITY OF RENTON
3
"/w N
lest
PHONE NO DATE
2
PROJECT MGR SIERRA VEGA
253.327.3162 3/7/17
1
JOB
ENGR - POWER SIERRA VEGA
253.327.3162 3/17/17
ti-.:
BY
SITES
ENGR - GAS N/A
N/A N/A
COUNTY
KING
Emer Sect Gas Wk Ctr
N/A N/A
POWER WK CTR
QCSOKE
DRAWN BY SIERRA VEGA
253.327.3162 3/17/17
CHECKED BY
1/4 SEC
SE -28, T23, R05E
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY
—
FOREMAN #1
U -MAP NO (POWER)
2305E112
OH CKT MAP
2305E136
JUGCKTMAP
N/A
ICIRCUITNO 1FOREMAN
ROL-13
#2
IMAPPING
ANA
JOINT FACILITIES ARRANGEMENTS
tlre�vstslt
N/A N/A N/A
ts1 Its
CONTACT
N/A N/A N/A
N/A
PHONE#
N/A N/A N/A
N/A
5E 161st P1
23�05E112 ROL-13 PETROVITSKY RD
REPLACE DISTRIBUTION POLE, INSTALL SPAN & DOWN GUYS
12601 SE PETROVITSKY RD RENTON, WA 98058
INCIDENT MAOP
N/A N/A
Gas Order Elect Order
N/A 186048141
SCALE PAGE
1:100 1 1/1
J.
CAl I /Rnn1 A9A_9999 1
Developer
"Locates Required"
"Outages Required"
"Flagging Required"
Yes Yes x PSE 2 BUSINESS DAYS BEFORE YOU DIG
No X No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
Yes x No REAL ESTATE/EASEMENT PERMIT
Yes x No N/A CITY OF RENTON
3
FUNCTION CONTACT
PHONE NO DATE
2
PROJECT MGR SIERRA VEGA
253.327.3162 3/7/17
1
ENGR - POWER SIERRA VEGA
253.327.3162 3/17/17
REV# DATE
BY
DESCRIPTION
ENGR - GAS N/A
N/A N/A
COUNTY
KING
Emer Sect Gas Wk Ctr
N/A N/A
POWER WK CTR
QCSOKE
DRAWN BY SIERRA VEGA
253.327.3162 3/17/17
CHECKED BY
1/4 SEC
SE -28, T23, R05E
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY
—
FOREMAN #1
U -MAP NO (POWER)
2305E112
OH CKT MAP
2305E136
JUGCKTMAP
N/A
ICIRCUITNO 1FOREMAN
ROL-13
#2
IMAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N/A N/A N/A
N/A
CONTACT
N/A N/A N/A
N/A
PHONE#
N/A N/A N/A
N/A
SPUGET
OUND
ENERGY
DESIGNED BY POTELCO
23�05E112 ROL-13 PETROVITSKY RD
REPLACE DISTRIBUTION POLE, INSTALL SPAN & DOWN GUYS
12601 SE PETROVITSKY RD RENTON, WA 98058
INCIDENT MAOP
N/A N/A
Gas Order Elect Order
N/A 186048141
SCALE PAGE
1:100 1 1/1