Loading...
HomeMy WebLinkAboutMFP17002339DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17002339 IVR Number: 17002339 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:05/18/2017Applica!on Date:5214500700Parcel Number:6101 NE 4TH PL Permit Type :05/22/2017Issue Date:Franchise Permit Work Class:05/22/2018Expira!on Date :Minor U’lity Job Number:#101097030Franchise Type :Electric Descrip!on:Trench ~20' between exis’ng transformer 318125 167784 to street light SL1 to feed street lights SL1, SL2 & SL3. Contacts Name Address PhoneTypeBilling Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Applicant VICKI HENSON POTELCO INC 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the condi’ons hereon and according to the approved plans and specifica’ons pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all ’mes . I hereby cer’fy that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restora’on and Street Overlay Requirements . Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspec’ons and for ANY work in the Right of Way. Call 8 1 1 to locate underground u’li’es at least two full business days prior to any excava’on . In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consulta’on with the transmission pipeline company prior to performing any construc’on or excava’on ac’vi’es . This requirement to consult with the transmission pipeline company is in addi’on to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy 101097030 Carli Bunkelman 253-437-6708 Carli.Bunkelman@pse.com Rosario Ave NE & NE 4th Pl Crew to trench approx 20' between the ex transformer, 318125-167784 to street light, SL1 to feed street lights, SL1, SL2 & SL3. 20' Potelco Inc.253-437-6708 BL005109 Poteli*227PL 5/05/17 4 Carli Bunkelman MFP17002339 Holly Powers Justin Johnson 5-22-2017 5-22-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form Potelco Inc. Paul Kinberg 206-604-3346 6905 S. 228th St, Kent, WA 98032 Carli.Bunkelman@pse.com Rosario Ave NE & NE 4th Pl 8:00 am to 3:00 pm Monday through Friday 5-22-2017 Carli Bunkelman 5/05/17 Carli Bunkelman MFP17002339 Justin Johnson SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). SPEED (MPH) 25 TAPER LENGTH (FT) OFFSET WIDTH 10'12' 105 125 CONE SPACING ALONG TAPER (FT) 25 30 150 180 30 35 205 245 35 40 270 320 40 45 450 540 45 NOTE: 1. FLASHING BEACON SHALL BE INSTALLED AT EACH SIGN FOR NIGHT-TIME USE. 2. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER. 3. FLAGGERS REQUIRED TO CONTROL TRAFFIC WHENEVER THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT. TABLE A WORK AREA TRUCK WITH FLASHING BEACON NE 4TH ST NE 4TH PL ROSARIO AVE NESEE NOTE 3 200' 200' N/A SCALE PAGE 1/1 1, MAY 2017 DATE:REVISED: GEBENINI.WTRAFFIC CONTROL PLAN ROSARIO AVE NE & NE 4TH PL STREET LIGHT ENGINEERING DEPARTMENT APPROVED:DATE:RENTON, WASH 98056 GRASSJ318125-167784'6101'20+/-NE 4TH ST318106-167782SLAE4418GRASSJNE 4TH PLRETENTION PONDROSARIO AVE NE318125-167784318125-167783SLAF2533SLAF2533NE 4TH ST'6101''6013''450''453'20+/-EXISTING WIREEXISTING WIREOwner / Developer Contact InfocellATTN:Kinberg, Paul at PSE425-456-2618101097030Vicinity MapThomas Brothers Guide Pg 656 Grid J-1SCALE: 1"=50'SITE PLAN425-429-123628, APR 2017N/AN/ARosario Ave NE & NE 4th PlInstall 1-54 LED CHFLNE Corner Rosario Ave NE & NE 4th PlN/AN/AN/A1010970301"=50'1/1KINGN/AN/A3515T23N R5EN/AN/A2305E0432306E028/2305E043MAP-17N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPCIRCUIT NOJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONACCOUNT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEPOTELCO STREET LIGHT NOTESSCOPE OF PROJECT IS TO TRENCH APPROX 20'+/- OF CIC TOENERGIZE 3 EXISTING STREET LIGHTS FROM AN ALTERNATEDIRECTION.REFER TO SL CIRCUITRY TABLE FOR APPROX. WIRE LENGTHS.FLAGGING IS REQUIRED.NEW BUSINESSCORRECTIVE /10 DAY WAIVEDCell PhoneCABLE TVPHONEProject Manager Contact Information:PROJECT PHASETrenchingRemovalSt LightPWRNOTIF#ORDER#"Locates Required""Outages Required""Flagging Required"Yes NoYes NoYes NoXXReplacementXXFOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Street Lights EnergizedCompany ID#'s RECORDED in correct location on As-built.Correct QC Checklist(s) reviewed.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and proceduresand that all quality requirements are met.PLAT ENERGIZEDYESNOINTOLIGHT STREET LIGHT NOTESALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL".ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SETPLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THEPOLE.BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.)APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BEREQUIRED.THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC(NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TOAID IN THE INSTALLATION OF THE STREET LIGHTING POLES. THEDEVELOPER MUST ALSO SUPPLY THE REQUIRED 5/8" MINUSGRAVEL AT EACH STREET LIGHT LOCATION.IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIREMUST BE LEVELED.DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREETLIGHT TUBE.THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGU-MAP NO (OH/UG)101097030GEBENINI.WRenton, Wa. 98056 425-429-1236GEBENINI.WTOTAL CIC = 20+/-WIRE25'(ft)Length Design#6(in)SizeStreet Light Wire & Conduit TableCONDUIT LOCATIONSizeQtyDesignBENDSfromto(in)Length (ft)90°45°22°11°XMFRSL1CIC120'TOTAL WIRE = 25'(TO BE INSTALLED BY OTHERS)ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS.Construction Notes* From XFMR (318125-167784) to SL1 (318125-167783) Trench Approx 20'+/- of CIC to feed SL1,SL2 and SL3.* Trenching to be done by others.* Insert #6 TPX wire in CIC and energize new feed to SL1, SL2 and SL3.NRawley Robins 206-604-3151425-941-1460TROUPE.DElectric Service Cable in Conduit2" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCover12" Typical(6" Min)Backfill for Conduit - Soil that is free from debris, sharp rocks, and rocks larger than 10" indiameter. Backfill shall not damage the conduit.Backfill for Conduit(See Definition Above)ONE LINE DRAWINGSCALE: 1"=50'28, APR 201728, APR 2017TRENCH PATH0000