HomeMy WebLinkAboutP_Utility Plan_101097030_V1_170505GRASSJ318125-167784'6101'20+/-NE 4TH ST318106-167782SLAE4418GRASSJNE 4TH PLRETENTION PONDROSARIO AVE NE318125-167784318125-167783SLAF2533SLAF2533NE 4TH ST'6101''6013''450''453'20+/-EXISTING WIREEXISTING WIREOwner / Developer Contact InfocellATTN:Kinberg, Paul at PSE425-456-2618101097030Vicinity MapThomas Brothers Guide Pg 656 Grid J-1SCALE: 1"=50'SITE PLAN425-429-123628, APR 2017N/AN/ARosario Ave NE & NE 4th PlInstall 1-54 LED CHFLNE Corner Rosario Ave NE & NE 4th PlN/AN/AN/A1010970301"=50'1/1KINGN/AN/A3515T23N R5EN/AN/A2305E0432306E028/2305E043MAP-17N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPCIRCUIT NOJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONACCOUNT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEPOTELCO STREET LIGHT NOTESSCOPE OF PROJECT IS TO TRENCH APPROX 20'+/- OF CIC TOENERGIZE 3 EXISTING STREET LIGHTS FROM AN ALTERNATEDIRECTION.REFER TO SL CIRCUITRY TABLE FOR APPROX. WIRE LENGTHS.FLAGGING IS REQUIRED.NEW BUSINESSCORRECTIVE /10 DAY WAIVEDCell PhoneCABLE TVPHONEProject Manager Contact Information:PROJECT PHASETrenchingRemovalSt LightPWRNOTIF#ORDER#"Locates Required""Outages Required""Flagging Required"Yes NoYes NoYes NoXXReplacementXXFOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Street Lights EnergizedCompany ID#'s RECORDED in correct location on As-built.Correct QC Checklist(s) reviewed.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and proceduresand that all quality requirements are met.PLAT ENERGIZEDYESNOINTOLIGHT STREET LIGHT NOTESALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL".ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SETPLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THEPOLE.BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.)APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BEREQUIRED.THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC(NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TOAID IN THE INSTALLATION OF THE STREET LIGHTING POLES. THEDEVELOPER MUST ALSO SUPPLY THE REQUIRED 5/8" MINUSGRAVEL AT EACH STREET LIGHT LOCATION.IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIREMUST BE LEVELED.DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREETLIGHT TUBE.THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGU-MAP NO (OH/UG)101097030GEBENINI.WRenton, Wa. 98056 425-429-1236GEBENINI.WTOTAL CIC = 20+/-WIRE25'(ft)Length Design#6(in)SizeStreet Light Wire & Conduit TableCONDUIT LOCATIONSizeQtyDesignBENDSfromto(in)Length (ft)90°45°22°11°XMFRSL1CIC120'TOTAL WIRE = 25'(TO BE INSTALLED BY OTHERS)ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS.Construction Notes* From XFMR (318125-167784) to SL1 (318125-167783) Trench Approx 20'+/- of CIC to feed SL1,SL2 and SL3.* Trenching to be done by others.* Insert #6 TPX wire in CIC and energize new feed to SL1, SL2 and SL3.NRawley Robins 206-604-3151425-941-1460TROUPE.DElectric Service Cable in Conduit2" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCover12" Typical(6" Min)Backfill for Conduit - Soil that is free from debris, sharp rocks, and rocks larger than 10" indiameter. Backfill shall not damage the conduit.Backfill for Conduit(See Definition Above)ONE LINE DRAWINGSCALE: 1"=50'28, APR 201728, APR 2017TRENCH PATH0000