HomeMy WebLinkAboutMFP17002346DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17002346
IVR Number: 17002346
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:05/18/2017Applica!on Date:5128000095Parcel Number:14914 130TH AVE SE
Permit Type :05/22/2017Issue Date:Franchise
Permit Work Class:05/22/2018Expira!on Date :Minor U’lity
Job Number:#101105107Franchise Type :Electric
Descrip!on:Replace transformer bank with single phase transformer on exis’ng pole P01. No hard surface cuts or trenching
needed.
Contacts
Name Address PhoneTypeBilling
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Applicant
VICKI HENSON
POTELCO INC
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the condi’ons hereon and according to the approved
plans and specifica’ons pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all ’mes .
I hereby cer’fy that no work is to be done except as described above and in approved plans, and that work is to conform to Renton
Trench Restora’on and Street Overlay Requirements .
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspec’ons and for ANY work in
the Right of Way.
Call 8 1 1 to locate underground u’li’es at least two full business days prior to any excava’on .
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic
Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consulta’on with the transmission pipeline company prior
to performing any construc’on or excava’on ac’vi’es . This requirement to consult with the transmission pipeline company is in
addi’on to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy
101105107
Carli Bunkelman
253-437-6708
Carli.Bunkelman@pse.com
14914 130th Ave SE
Crew to replace transformer bank, with single phase transformer @ ex pole P01.
S bound lane closure on 130th Ave SE anticipated. No hard surface disturbance, trenching or
civil work anticipated.
Potelco Inc.253-437-6708
BL005109 Poteli*227PL
5/08/2017
4
Carli Bunkelman
MFP17002346
Holly Powers
Justin Johnson
5-22-2017
5-22-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
Potelco Inc.
Dennis Martin 425-449-7514
6905 S. 228th St, Kent, WA 98032
Dennis.Martin@pse.com
14914 130th Ave SE
8:00 am to 3:00 pm
Monday through Friday 5-22-2017
Carli Bunkelman 5/08/2017
Carli Bunkelman
MFP17002346
Justin Johnson
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
P01171710
10101011111111FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGFROM TOTOW A
WAY AREAPHONE 888-9999INFRAS
O
U
R
C
E LLC 000 0000000NO PARKINGSTOPFLAG
GE
RSTOPFLAGG
ER
ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1
W20-7A100'100'100'ONE LANEROADAHEADW20-4 ROADWORKAHEADW20-1 W20
-
7A 100'100'100'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A10
0
'
10
0
'X'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1100'100'BEPR
E
P
A
R
E
D
TO
ST
O
P W3-4RO
A
D
WO
R
K
AH
E
A
D
W20-1100'100'131ST AVE SE
13
1
S
T
A
V
E
S
ESE 149TH STSE 150TH ST10101
3
0
TH
AVE
SEUSE MAXIMUM AVAILABLESPACE FOR SIGNSJob#10110510714914 130th Ave SE, King County WAMay 2, 2017Sheet 1 of 1 ryan.honeysett@pse.com(425) 457-5381CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPOLESHEET IS FORMATTEDFOR 11 X 17Notes:1. All signs and spacing to conform to the MUTCDand King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425
317412-167113
3 x10kVA 120/208v
14914
317422-167104
25kVA 120/240v
R
O
W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
R
O
W
R
O
W
R
O
W
ROW
ROW
ROW
ROW
ROWR
O
W
R
O
W ROWROWROW
ROW
ROWROWJOB SITE
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A 583056697
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"X X
X
X
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101105107N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. MARTIN 425-449-7514 4/27/17
M. SANCHEZ 714-893-2405 4/27/17
L. ORTIZ 714-893-2405 4/27/17
N/A KING COUNTY
FWD-16 / B/O XFMR BANK / O-368996
B/O TRANSFORMER BANK REPLACEMENT
14914 130TH AVE SE. RENTON, WA 98058
ASPLUNDH CONSTRUCTION CORP.
O-368996
101105107
AS NOTED 1/1
KING FAC-SVC
NE21-23N-05E
2305E081 2305E088 FWD-162305E081
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E088
11302760 101105107
SITE MAP
SCALE: 1" = 50'
Owner / Developer Contact Info
officeATTN:
PUGET SOUND ENERGY
DENNIS MARTIN 425-449-7514
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DENNIS MARTIN
425-736-8880
DENNIS.MARTIN@PSE.COM
9.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
317412-167113
25kVA
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
SITE SPECIFIC NOTES
P01 (317412-167113)
-EXISTING 45' CL 1 (1968) POLE TO REMAIN
-REMOVE THE 120/208v 3Ø TRANSFORMER BANK & CUTOUTS
-INSTALL (1) 120/240v 25kVA TRANSFORMER (TRFNXF) PER STD 6025.1000
-RECONNECT SERVICE TO THE STREET LIGHT ON THE POLE
THOMAS GUIDE
656-G4
SINGLE-PHASE OH TRANSFORMER
NOT TO SCALE 6025.1000
P01
317412-167113
3x10kVA
Company ID#:
Company ID#:
CIRCUIT FEET ADDED: NONE