Loading...
HomeMy WebLinkAboutP_Utility Plan_101105107_V1_170508317412-167113 3 x10kVA 120/208v 14914 317422-167104 25kVA 120/240v R O W ROW ROW ROW ROW ROW ROW ROW ROW ROW R O W R O W R O W ROW ROW ROW ROW ROWR O W R O W ROWROWROW ROW ROWROWJOB SITE GAS PHONE CABLE TV N/A N/A N/A N/A N/A 583056697 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"X X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101105107N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. MARTIN 425-449-7514 4/27/17 M. SANCHEZ 714-893-2405 4/27/17 L. ORTIZ 714-893-2405 4/27/17 N/A KING COUNTY FWD-16 / B/O XFMR BANK / O-368996 B/O TRANSFORMER BANK REPLACEMENT 14914 130TH AVE SE. RENTON, WA 98058 ASPLUNDH CONSTRUCTION CORP. O-368996 101105107 AS NOTED 1/1 KING FAC-SVC NE21-23N-05E 2305E081 2305E088 FWD-162305E081 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E088 11302760 101105107 SITE MAP SCALE: 1" = 50' Owner / Developer Contact Info officeATTN: PUGET SOUND ENERGY DENNIS MARTIN 425-449-7514 E-Mail: Cell Phone: Project Manager Contact Information: Manager:DENNIS MARTIN 425-736-8880 DENNIS.MARTIN@PSE.COM 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage P01 317412-167113 25kVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage SITE SPECIFIC NOTES P01 (317412-167113) -EXISTING 45' CL 1 (1968) POLE TO REMAIN -REMOVE THE 120/208v 3Ø TRANSFORMER BANK & CUTOUTS -INSTALL (1) 120/240v 25kVA TRANSFORMER (TRFNXF) PER STD 6025.1000 -RECONNECT SERVICE TO THE STREET LIGHT ON THE POLE THOMAS GUIDE 656-G4 SINGLE-PHASE OH TRANSFORMER NOT TO SCALE 6025.1000 P01 317412-167113 3x10kVA Company ID#: Company ID#: CIRCUIT FEET ADDED: NONE