HomeMy WebLinkAboutP_Utility Plan_101105107_V1_170508317412-167113
3 x10kVA 120/208v
14914
317422-167104
25kVA 120/240v
R
O
W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
R
O
W
R
O
W
R
O
W
ROW
ROW
ROW
ROW
ROWR
O
W
R
O
W ROWROWROW
ROW
ROWROWJOB SITE
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A 583056697
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"X X
X
X
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101105107N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. MARTIN 425-449-7514 4/27/17
M. SANCHEZ 714-893-2405 4/27/17
L. ORTIZ 714-893-2405 4/27/17
N/A KING COUNTY
FWD-16 / B/O XFMR BANK / O-368996
B/O TRANSFORMER BANK REPLACEMENT
14914 130TH AVE SE. RENTON, WA 98058
ASPLUNDH CONSTRUCTION CORP.
O-368996
101105107
AS NOTED 1/1
KING FAC-SVC
NE21-23N-05E
2305E081 2305E088 FWD-162305E081
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E088
11302760 101105107
SITE MAP
SCALE: 1" = 50'
Owner / Developer Contact Info
officeATTN:
PUGET SOUND ENERGY
DENNIS MARTIN 425-449-7514
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DENNIS MARTIN
425-736-8880
DENNIS.MARTIN@PSE.COM
9.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
317412-167113
25kVA
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
SITE SPECIFIC NOTES
P01 (317412-167113)
-EXISTING 45' CL 1 (1968) POLE TO REMAIN
-REMOVE THE 120/208v 3Ø TRANSFORMER BANK & CUTOUTS
-INSTALL (1) 120/240v 25kVA TRANSFORMER (TRFNXF) PER STD 6025.1000
-RECONNECT SERVICE TO THE STREET LIGHT ON THE POLE
THOMAS GUIDE
656-G4
SINGLE-PHASE OH TRANSFORMER
NOT TO SCALE 6025.1000
P01
317412-167113
3x10kVA
Company ID#:
Company ID#:
CIRCUIT FEET ADDED: NONE