Loading...
HomeMy WebLinkAboutP_Utilitiy plan_101104477_Renton NE 31st Street Bridge PI_V1_170524N Vicinity Map 101104477THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) OVERHEAD CIRCUIT MAP (D2405E136) SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" NICHOLAS LANIER CELL 253-266-4957 Project Manager Contact Information: RENTON NE 31ST STREET MAY CREEK BRIDGE PI PI RELOCATION PSE CAPITAL PROJECT GENERAL SPECIFICATIONS Scope of Work PHASE 1: Relocate poles and overhead conductor to temp. easement so that bridge replacement equipment stays clear of overhead conductors throughout construction PHASE 2: After construction (Fall 2017) return poles to City of Renton ROW. Reframe and cut existing 95' poles down to ~45' above ground level. General -All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. -Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. -Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. OVERHEAD CONSTRUCTION Poles & Structures - Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. - All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. - Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. - Install grid numbers on all new and existing poles as shown on sketch. - Straighten existing poles as indicated or as necessary. - Treat all field-drilled poles with copper napthenate wood preservative. - Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600 amp switch jumpers. Install tree wire conductor for jumpers on all poles that are double deadended with tree wire. - Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. - Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. Conductors & Conduit - Refer to PSE standard 6800.6000 “PVC Conduit Installation”. - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - All “spare” conduits shall be capped at each end. Owner / Developer Contact Info officeATTN: CITY OF RENTON 1055 SOUTH GRADY WAY RENTON WA 98057 DEREK AKESSON 425-430-7337PHONE CABLE TV 11294602 101104477 583056395 584.... 108100110 PROJECT PHASE PWR NOTIF#ORDER# Superior UG Expense Removal OH Expense 593.... 594113612 UG Expense OH Expense LEGEND CONDUIT RISER OVERHEAD TRANSFORMER JUNCTION VAULT/JUNCTION BOX NEW CONDUCTOR AND OR TRENCH LINE DISCONNECT - FUSED PULL VAULT OR SPLICE VAULT EXISTING POLE DOWN GUY DISCONNECT - UNFUSED NEW POLE PADMOUNT TRANSFORMER SECONDARY HANDHOLE EXISTING CONDUCTOR TO BE REMOVED OR ABANDONED STREET LIGHT TOTAL UNDERGROUND TRANSFORMER ENERGY CUSTOMER DEMAND POINT OR OR OR OVERHEAD JUMPER CONNECTION JOB SITE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP NICHOLAS LANIER 253-234-6437 5/22/17 NICHOLAS LANIER 253-234-6437 5/22/17 NICHOLAS LANIER 253-234-6437 5/22/17 N/A CITY OF RENTON RENTON NE 31ST MAY CREEK BRIDGE - PI OH POLE RELOCATE NE 31ST, RENTON 98056 101104477 AS NOTED 1/4 KING CSPSKEIN S32 T24N R05E 2405E128 2405E136 2405E128 HAZ-15 COMCAST CENTURYLINK N/A N/A N/A UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP 101104477NICHOLAS LANIER 253-234-6437 5/22/17 NICHOLAS LANIER 253-234-6437 5/22/17 NICHOLAS LANIER 253-234-6437 5/22/17 N/A CITY OF RENTON RENTON NE 31ST BRIDGE - PI OH POLE RELOCATE NE 31ST, RENTON 98056 101104477 AS NOTED 2/4 KING CSPSKEIN 2405E128 2405E136 2405E128 HAZ-15 COMCAST CENTURYLINK S32 T24N R05E UNIVERSAL MAP (A2405E128) SCALE: 1 = 100 JOB SITE NEW ROAD NEW ROAD NEW ROAD NEW ROAD UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP 101104477PHASE 1 SITE PLAN SCALE: 1" = 20' PHASE 1 CONSTRUCTION NOTES: P01: GRID 319260-166436 (NEW) REPLACE POLE WITH NEW 50' POLE CL-1 W/ GND AS STAKED PD501 [6010.1000] INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043] REMOVE EXISTING 25 KVA OH TRF 120/240V W/ LB C/O AND FUSE INSTALL NEUTRAL IN COMMON POSITION COMMUNICATIONS TO TRANSFER P2A: GRID 319260-166454 (NEW) INSTALL NEW 50' POLE CL-3 W/ GND AS STAKED PD503 [6010.1000] INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043] INSTALL NEUTRAL IN COMMON POSITION INSTALL 3/8 PRIMARY DOWN GUY GYD3SA L=15 [6013.0100] INSTALL 3/8 NEUTRAL DOWN GUY GYD3SAN L=15 [6013.0100] INSTALL TRIPLE HELIX ANCHOR ANDH3 L= 15 [6012.1000] COMMUNICATIONS TO TRANSFER P03: GRID 319259-166468 (EXISTING) REPLACE POLE WITH NEW 50' POLE CL-3 W/ GND AS STAKED PD503 [6010.1000] INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043] INSTALL NEUTRAL IN COMMON POSITION INSTALL 3/8 PRIMARY DOWN GUY GYD3SA L=15 [6013.0100] INSTALL 3/8 NEUTRAL DOWN GUY GYD3SAN L=15 [6013.0100] INSTALL TRIPLE HELIX ANCHOR ANDH3 L= 15 [6012.1000] COMMUNICATIONS TO TRANSFER SPAN NOTES: P01 - P2A- P03 RUN #2 ACSR TREE 1ɸ PRIMARY CONDUCTOR = 445' (MID: 8309730) RUN #2 ACSR NEUTRAL CONDUCTOR = 445' (MID: 8310800 SPARROW) P01 - P03 REMOVE EXISTING #4 CU 1ɸ PRIMARY CONDUCTOR = 445 ' REMOVE EXISTING #4 ACSR NEUTRAL CONDUCTOR = 445' POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P01 319260-166436 45 1950 P02 319259-166453 45 1950 P03 319259-166468 45 1950 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319260-166436 25 2-23x1 2-24x1 2-23x1 2-23x1 2-17x445 WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFromTo P01 P03 #4 Cu 1 445 P01 P03 #4 ACSR 1 445 Total Feet 445 (#4 Cu) ACTUAL________Removed Total Feet 445 (#4 ACSR) ACTUAL________Removed WIRE STRINGING PRIMARY & SECONDARY Location Pri Sec Wire Size & Type Quantity Length (per conductor)From To P1A P3A X #2 ACSR TREE 1 445 P1A P3A #2 ACSR NEUTRAL 1 445 NICHOLAS LANIER 253-234-6437 5/22/17 NICHOLAS LANIER 253-234-6437 5/22/17 NICHOLAS LANIER 253-234-6437 5/22/17 N/A CITY OF RENTON RENTON NE 31ST BRIDGE PHASE 1- PI OH POLE RELOCATE NE 31ST, RENTON 98056 101104477 AS NOTED 3/4 KING CSPSKEIN 2405E128 2405E136 2405E128 HAZ-15 COMCAST CENTURYLINK S32 T24N R05E POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 319260-166436 50 1 PD501 P2A 319261-166454 50 3 PD503 P3A 319259-166468 50 3 PD503 2-129*3 UNIT ALLOCATIONS 2-23 x3 2-24 x1 2-17x445' 2-129 x3 NEW ROAD NEW ROAD NEW ROAD NEW ROAD PHASE 2 SITE PLAN SCALE: 1" = 20' POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P2A 319261-166454 50 3 2017 P03 319259-166468 50 3 2017 101104477NICHOLAS LANIER 425-495-6489 5/22/17 NICHOLAS LANIER 206-604-3687 5/22/17 NICHOLAS LANIER 253-234-6437 5/22/17 N/A CITY OF RENTON RENTON NE 31ST BRIDGE PHASE TWO- PI OH POLE RELOCATE NE 31ST, RENTON 98056 101104477 AS NOTED 4/4 KING CSPSKEIN 2405E128 2405E136 2405E128 HAZ-15 COMCAST CENTURYLINKUTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP S32 T24N R05E POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P2B 319260-166436 50 2 PD502 P3B 319259-166468 55 1 PD551 PHASE 2 SITE PLAN SCALE: 1" = 20'MATCHLINESEE BELOWAAMATCHLINESEE BELOWAA PHASE 2 CONSTRUCTION NOTES: P2B: GRID 319259-166453 (NEW) INSTALL 50' POLE CL-2 W/ GND AS STAKED PD502 [6010.1000] INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043] INSTALL NEUTRAL IN COMMON POSITION COMMUNICATIONS TO TRANSFER P3B: GRID 319256-166471 (NEW) INSTALL 55' POLE CL-1 W/ GND AS STAKED PD551 [6010.1000] DEEP SET 2' RAKE 18" BACKFILL WITH CDF INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043] INSTALL NEUTRAL IN COMMON POSITION COMMUNICATIONS TO TRANSFER P04: GRID 319237-166501 (EXISTING) EXISTING 95' POLE PHONE COMMUNICATIONS TO TRANSFER TO A MAXIMUM HEIGHT OF 30' TOP POLE TO 43' ABOVE GROUND LINE INSTALL SNGL POLE TOP PIN TAN112 [6031.1010] LOWER 25 KVA OH TRF 120/240V W/ LB C/O AND FUSE @ 10T [6025.1000] ADJUST EXISTING 4" SECONDARY RISER AND CONDUIT TRASNFER/ADJUST EXISTING TRIPLEX P05: GRID 319234-166536 (EXISTING) EXISTING 95' POLE PHONE COMMUNICATIONS TO TRANSFER TO A MAXIMUM HEIGHT OF 30' TOP POLE TO 43' ABOVE GROUND LINE INSTALL SNGL POLE TOP PIN TAN112 [6031.1010] LOWER 25 KVA OH TRF 120/240V W/ LB C/O AND FUSE @ 10T [6025.1000] TRANSFER/ADJUST EXISTING TRIPLEX SPAN NOTES: P1A - P05 RESAG/ADJUST EXISTING PRIMARY CONDUCTOR RESAG/ADJUST EXISTING NEUTRAL CONDUCTOR New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P04 319237-166501 25 New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P05 319234-166536 25 2-129*2 UNIT ALLOCATIONS 2-23 x2 2-23A x2 2-24 x3 2-129 x1 2-23x1 2-23x1 2-23Ax1 2-24x2 2-23Ax1 2-24x1