Vicinity Map
101104477THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
OVERHEAD CIRCUIT MAP (D2405E136)
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
NICHOLAS LANIER
CELL 253-266-4957
Project Manager Contact Information:
RENTON NE 31ST STREET
MAY CREEK BRIDGE PI
PI RELOCATION
PSE CAPITAL PROJECT
GENERAL SPECIFICATIONS
Scope of Work
PHASE 1: Relocate poles and overhead conductor to temp. easement so that bridge
replacement equipment stays clear of overhead conductors throughout
construction
PHASE 2: After construction (Fall 2017) return poles to City of Renton ROW. Reframe
and cut existing 95' poles down to ~45' above ground level.
General
-All work is to be completed per PSE Standards & Practices. Copies of all PSE
Standards are available upon request.
-Work sites shall be kept clear of debris and all construction materials; equipment
and packing shall be removed daily.
-Return all unused and removed poles, transformers and hardware to PSE,
storeroom. All copper shall be coiled and returned the day it is removed from the
poles. Remove all unused pins and insulators.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a
minimum of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in
red on Foreman's copy of worksketch.
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading
requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of
each work day, or as otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with
local traffic regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been
re-established or disturbed soil has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
OVERHEAD CONSTRUCTION
Poles & Structures
- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole
location measurements are from the center of the pole.
- All new poles set shall be the class indicated on the sketch, or better. Do not set a
lower class pole than specified.
- Install ground plate assembly on all new poles. Install Switch Ground Assembly per
standard specification 6014.1000 at new gang operated switch locations.
- Install grid numbers on all new and existing poles as shown on sketch.
- Straighten existing poles as indicated or as necessary.
- Treat all field-drilled poles with copper napthenate wood preservative.
- Remove old poles after communication companies have transferred off and return to
PSE storeroom. Fill and crown pole holes and restore area similar to adjacent
landscaping.
Conductors & Equipment
- Transfer all overhead and underground primary, secondary and service conductors
and guys to new poles set, unless otherwise indicated on this sketch.
- Transfer existing transformers to new poles unless otherwise indicated on this sketch.
- Use stirrups to connect all overhead and underground primary taps, and all
transformers. Install at all sites being worked within the scope of the project where
they are currently missing.
- Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600
amp switch jumpers. Install tree wire conductor for jumpers on all poles that are
double deadended with tree wire.
- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.
- Connect primary taps and transformers to same phase as existing unless otherwise
shown on the drawing.
- All neutral connections to be made with solid compression connectors. Connect all
pole grounds to common neutral.
- Use Load-interrupter cutouts (with arc shields) on all primary overhead and
underground taps with fused protection above 40T.
- Install Wildlife Protectors on all transformers.
Conductors & Conduit
- Refer to PSE standard 6800.6000 “PVC Conduit Installation”.
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be
plumbed directly to road crossing conduits.
- Install insulating caps on all unused primary bushings.
- All “spare” conduits shall be capped at each end.
Owner / Developer Contact Info
officeATTN:
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON WA 98057
DEREK AKESSON 425-430-7337PHONE
CABLE TV
11294602 101104477
583056395
584....
108100110
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Expense
Removal
OH Expense 593....
594113612
UG Expense
OH Expense
LEGEND
CONDUIT RISER
OVERHEAD TRANSFORMER
JUNCTION VAULT/JUNCTION BOX
NEW CONDUCTOR AND OR TRENCH LINE
DISCONNECT - FUSED
PULL VAULT OR SPLICE VAULT
EXISTING POLE
DOWN GUY
DISCONNECT - UNFUSED
NEW POLE
PADMOUNT TRANSFORMER
SECONDARY HANDHOLE
EXISTING CONDUCTOR TO BE REMOVED
OR ABANDONED
STREET LIGHT
TOTAL UNDERGROUND TRANSFORMER
ENERGY CUSTOMER DEMAND POINT
OR
OR
OR
OVERHEAD JUMPER CONNECTION
JOB SITE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
NICHOLAS LANIER 253-234-6437 5/22/17
NICHOLAS LANIER 253-234-6437 5/22/17
NICHOLAS LANIER 253-234-6437 5/22/17
N/A CITY OF RENTON
RENTON NE 31ST MAY CREEK BRIDGE - PI
OH POLE RELOCATE
NE 31ST, RENTON 98056
101104477
AS NOTED 1/4
KING CSPSKEIN
S32 T24N R05E
2405E128 2405E136 2405E128 HAZ-15
COMCAST CENTURYLINK N/A
N/A
N/A
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP 101104477NICHOLAS LANIER 253-234-6437 5/22/17
NICHOLAS LANIER 253-234-6437 5/22/17
NICHOLAS LANIER 253-234-6437 5/22/17
N/A CITY OF RENTON
RENTON NE 31ST BRIDGE - PI
OH POLE RELOCATE
NE 31ST, RENTON 98056
101104477
AS NOTED 2/4
KING CSPSKEIN
2405E128 2405E136 2405E128 HAZ-15
COMCAST CENTURYLINK
S32 T24N R05E
UNIVERSAL MAP (A2405E128)
SCALE: 1 = 100
JOB SITE
NEW ROAD
NEW ROAD
NEW ROAD
NEW ROAD
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP 101104477PHASE 1 SITE PLAN
SCALE: 1" = 20'
PHASE 1 CONSTRUCTION NOTES:
P01: GRID 319260-166436 (NEW)
REPLACE POLE WITH NEW 50' POLE CL-1 W/ GND AS STAKED PD501 [6010.1000]
INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043]
REMOVE EXISTING 25 KVA OH TRF 120/240V W/ LB C/O AND FUSE
INSTALL NEUTRAL IN COMMON POSITION
COMMUNICATIONS TO TRANSFER
P2A: GRID 319260-166454 (NEW)
INSTALL NEW 50' POLE CL-3 W/ GND AS STAKED PD503 [6010.1000]
INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043]
INSTALL NEUTRAL IN COMMON POSITION
INSTALL 3/8 PRIMARY DOWN GUY GYD3SA L=15 [6013.0100]
INSTALL 3/8 NEUTRAL DOWN GUY GYD3SAN L=15 [6013.0100]
INSTALL TRIPLE HELIX ANCHOR ANDH3 L= 15 [6012.1000]
COMMUNICATIONS TO TRANSFER
P03: GRID 319259-166468 (EXISTING)
REPLACE POLE WITH NEW 50' POLE CL-3 W/ GND AS STAKED PD503 [6010.1000]
INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043]
INSTALL NEUTRAL IN COMMON POSITION
INSTALL 3/8 PRIMARY DOWN GUY GYD3SA L=15 [6013.0100]
INSTALL 3/8 NEUTRAL DOWN GUY GYD3SAN L=15 [6013.0100]
INSTALL TRIPLE HELIX ANCHOR ANDH3 L= 15 [6012.1000]
COMMUNICATIONS TO TRANSFER
SPAN NOTES:
P01 - P2A- P03
RUN #2 ACSR TREE 1ɸ PRIMARY CONDUCTOR = 445' (MID: 8309730)
RUN #2 ACSR NEUTRAL CONDUCTOR = 445' (MID: 8310800 SPARROW)
P01 - P03
REMOVE EXISTING #4 CU 1ɸ PRIMARY CONDUCTOR = 445 '
REMOVE EXISTING #4 ACSR NEUTRAL CONDUCTOR = 445'
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
SITE
#
POLE DATA POLE
TEL TV FIBER TRAN RMVD ID NUMBER
GRID #HEIGHT CLASS YEAR TOPPED RMVD
P01 319260-166436 45 1950
P02 319259-166453 45 1950
P03 319259-166468 45 1950
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
319260-166436
25
2-23x1
2-24x1
2-23x1
2-23x1
2-17x445
WIRE REMOVAL TABLE
Location
Wire Size & Type Quantity
Length
(per
conductor)RemarksFromTo
P01 P03 #4 Cu 1 445
P01 P03 #4 ACSR 1 445
Total Feet 445 (#4 Cu) ACTUAL________Removed
Total Feet 445 (#4 ACSR) ACTUAL________Removed
WIRE STRINGING
PRIMARY & SECONDARY
Location
Pri Sec Wire Size & Type Quantity
Length
(per
conductor)From To
P1A P3A X #2 ACSR TREE 1 445
P1A P3A #2 ACSR NEUTRAL 1 445
NICHOLAS LANIER 253-234-6437 5/22/17
NICHOLAS LANIER 253-234-6437 5/22/17
NICHOLAS LANIER 253-234-6437 5/22/17
N/A CITY OF RENTON
RENTON NE 31ST BRIDGE PHASE 1- PI
OH POLE RELOCATE
NE 31ST, RENTON 98056
101104477
AS NOTED 3/4
KING CSPSKEIN
2405E128 2405E136 2405E128 HAZ-15
COMCAST CENTURYLINK
S32 T24N R05E
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 319260-166436 50 1 PD501
P2A 319261-166454 50 3 PD503
P3A 319259-166468 50 3 PD503
2-129*3
UNIT ALLOCATIONS
2-23 x3
2-24 x1
2-17x445'
2-129 x3
NEW ROAD
NEW ROAD
NEW ROAD
NEW ROAD
PHASE 2 SITE PLAN
SCALE: 1" = 20'
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
SITE
#
POLE DATA POLE
TEL TV FIBER TRAN RMVD ID NUMBER
GRID #HEIGHT CLASS YEAR TOPPED RMVD
P2A 319261-166454 50 3 2017
P03 319259-166468 50 3 2017 101104477NICHOLAS LANIER 425-495-6489 5/22/17
NICHOLAS LANIER 206-604-3687 5/22/17
NICHOLAS LANIER 253-234-6437 5/22/17
N/A CITY OF RENTON
RENTON NE 31ST BRIDGE PHASE TWO- PI
OH POLE RELOCATE
NE 31ST, RENTON 98056
101104477
AS NOTED 4/4
KING CSPSKEIN
2405E128 2405E136 2405E128 HAZ-15
COMCAST CENTURYLINKUTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
S32 T24N R05E
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P2B 319260-166436 50 2 PD502
P3B 319259-166468 55 1 PD551
PHASE 2 SITE PLAN
SCALE: 1" = 20'MATCHLINESEE BELOWAAMATCHLINESEE BELOWAA PHASE 2 CONSTRUCTION NOTES:
P2B: GRID 319259-166453 (NEW)
INSTALL 50' POLE CL-2 W/ GND AS STAKED PD502 [6010.1000]
INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043]
INSTALL NEUTRAL IN COMMON POSITION
COMMUNICATIONS TO TRANSFER
P3B: GRID 319256-166471 (NEW)
INSTALL 55' POLE CL-1 W/ GND AS STAKED PD551 [6010.1000]
DEEP SET 2'
RAKE 18"
BACKFILL WITH CDF
INSTALL SNGL PHASE DDE POLE DDE2115 [6031.1043]
INSTALL NEUTRAL IN COMMON POSITION
COMMUNICATIONS TO TRANSFER
P04: GRID 319237-166501 (EXISTING)
EXISTING 95' POLE
PHONE COMMUNICATIONS TO TRANSFER TO A MAXIMUM HEIGHT OF 30'
TOP POLE TO 43' ABOVE GROUND LINE
INSTALL SNGL POLE TOP PIN TAN112 [6031.1010]
LOWER 25 KVA OH TRF 120/240V W/ LB C/O AND FUSE @ 10T [6025.1000]
ADJUST EXISTING 4" SECONDARY RISER AND CONDUIT
TRASNFER/ADJUST EXISTING TRIPLEX
P05: GRID 319234-166536 (EXISTING)
EXISTING 95' POLE
PHONE COMMUNICATIONS TO TRANSFER TO A MAXIMUM HEIGHT OF 30'
TOP POLE TO 43' ABOVE GROUND LINE
INSTALL SNGL POLE TOP PIN TAN112 [6031.1010]
LOWER 25 KVA OH TRF 120/240V W/ LB C/O AND FUSE @ 10T [6025.1000]
TRANSFER/ADJUST EXISTING TRIPLEX
SPAN NOTES:
P1A - P05
RESAG/ADJUST EXISTING PRIMARY CONDUCTOR
RESAG/ADJUST EXISTING NEUTRAL CONDUCTOR
New pole at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER TRANSFER
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P04
319237-166501
25
New pole at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER TRANSFER
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P05
319234-166536
25
2-129*2
UNIT ALLOCATIONS
2-23 x2
2-23A x2
2-24 x3
2-129 x1
2-23x1
2-23x1
2-23Ax1
2-24x2
2-23Ax1
2-24x1