HomeMy WebLinkAboutMFP17002676DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17002676
IVR Number: 17002676
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:06/07/2017Applica!on Date:0886700330Parcel Number:2700 NACHES AVE SW
Permit Type :06/20/2017Issue Date:Franchise
Permit Work Class:06/20/2018Expira!on Date :Minor U&lity
Job Number:#105085007Franchise Type :Electric
Descrip!on:INSTALL NEW L/E TO NEW VAULT V01 TO SERVICE NEW SIGNAL.
Contacts
Name Address PhoneTypeBilling
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Applicant
VICKI HENSON
POTELCO INC
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for
ANY work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy
105085007
Carli Bunkelman
253-437-6708
Carli.Bunkelman@pse.com
SW 27TH & NACHES AVE SW
Crew to park in ROW of SW 27th St to install l/e to new vault, VO1 and serve
new signal.
Potelco Inc.253-437-6708
BL005109 Poteli*227PL
5/31/2017Carli Bunkelman
MFP17002676
2700 Naches
Ave SW
Holly Powers
Justin Johnson
6-20-2017
6-20-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
Potelco Inc.
BRAD ELKIN 425-495-6489
6905 S. 228th St, Kent, WA 98032
BRADLEY.ELKIN@PSE.COM
SW 27TH & NACHES AVE SW
8:00 AM to 3:00 PM
Monday through Friday 6-20-2017
Carli Bunkelman 5/31/2017
Carli Bunkelman
MFP170026762700 Naches Ave SW
Justin Johnson
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
11 12 1112.512.5STOPFLAGGER
M6-2STOPFLAGG
E
RSTOPFLAGG
E
R
O
N
E
L
A
N
E
R
O
A
D
A
H
E
A
D
W20-4
R
O
A
DWO
R
K
A
H
E
A
D
W20-1
W20-7A100'100'100'1
5
1
1
1
1 ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1
W20-7A100'100'100'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A100'100'100'STOPFLAGG
E
RSW 27TH STSW 27TH STNACHES A
V
E
S
W AREA UNDER CONSTRUCTIONGROUP HEALTHFLAGGER WILL CONTROLANY TRAFFIC EXITINGCONSTRUCTION ZONEJ01V01R9-9SIDEWALKCLOSEDR9-9SIDEWALK
CLOSED W20-7ACONETOPPERJob#105085007SW 27th ST & Naches Ave SW, Renton WAMay 24, 2017Sheet 1 of 1 ryan.honeysett@pse.com(425) 457-5381CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPVAULTVaultPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425SHEET IS FORMATTEDFOR 11 X 17
316986-165284
NEW
25kVA 120/240v
316988-165283
SW 27TH
S
T
NACHES AVE SWRJN
27
RJN
27
JOB SITE
JOB SITE
15'
90°
4' X 4'
WORK PIT
PSE TO INSTALL
±15' OF 1-2" SCH'L 80
DISCONTINUOUS
GRAY PVC CONDUIT
BØEHE133
PSE TO INSTALL
±30' OF (1) 1/0 AL JKT
PRIMARY CABLE
504518232 105085007
594114373
504605496 104291511
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Misc UG
Perm Service
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)105085007Owner / Developer Contact Info
officeATTN:
CITY OF RENTON
1055 S GRADY WAY
RENTON, WA 98057
ERIC CUTSHALL 425-430-7423
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SITE PLAN
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CONDUIT DIAGRAM
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES - COMMERCIAL PROJECT
9.
10.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:BRAD ELKIN
425-495-6489
BRADLEY.ELKIN@PSE.COM
N
Vicinity Map
N/A
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
316986-165284
25kVA
6247000
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
BRAD ELKIN 425-495-6489 05/15/17
BRAD ELKIN 425-495-6489 05/15/17
N/A N/A N/A
JUSTIN HANG 253-508-7880 05/15/17
EASEMENT REQUIRED CITY OF RENTON
GROUP HEALTH LONGACRES SIGNAL
INSTALLING 1Ø PRIMARY L/E & CONNECTING UG PERM SVC
SW 27TH ST & NACHES AVE SW, RENTON, WA 98058
N/A N/A
N/A 105085007
AS NOTED 1/1
KING N/A N/A CSPSKEIN
T23N, R04E, SEC 25 NW N/A N/A
2304E097 2305E124 2304E097 RJN-27
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SITE SPECIFIC NOTES
J01 GRID 316988-165283:
-INSTALL 1 - 12kV ELBOW KIT
V01:
-INSTALL 36" X 42" X 38" MP W/ UNITSTRUTS & GNDS
-INSTALL 25kVA 120-240v PADMOUNT TRANSFORMER
-INSTALL 1 - 12kV ELBOW KIT
-INSTALL 1 - 12kV DUST CAP
-INSTALL CABLE TAG: %(+(
-INSTALL GRID NUMBER: 316986 - 165284
-TAG & CONNECT CUSTOMER OWNED SVC
M01:
-INSTALL 1 - 200AMP METER
SPAN SPECIFIC NOTES
*** SEE PRIMARY CABLE & CONDUIT TABLE ***
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
0 SQ.
200AMPS
ELECTRIC
10KW
65A
0.8%
1.5%
CIRCUIT FEET ADDED: 15'
CABLE DIAGRAM
NOT TO SCALE
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
J01 V01 2 1 15 1 146.2 145.9 1/0 AL JKT 30 EHE133
NOT TO SCALE
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTVAULT DETAIL AT V01
SCALE: NONE