Loading...
HomeMy WebLinkAboutP_Design_105085007_V1316986-165284 NEW 25kVA 120/240v 316988-165283 SW 27TH S T NACHES AVE SWRJN 27 RJN 27 JOB SITE JOB SITE 15' 90° 4' X 4' WORK PIT PSE TO INSTALL ±15' OF 1-2" SCH'L 80 DISCONTINUOUS GRAY PVC CONDUIT BØEHE133 PSE TO INSTALL ±30' OF (1) 1/0 AL JKT PRIMARY CABLE 504518232 105085007 594114373 504605496 104291511 PROJECT PHASE PWR NOTIF#ORDER# Superior Misc UG Perm Service THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)105085007Owner / Developer Contact Info officeATTN: CITY OF RENTON 1055 S GRADY WAY RENTON, WA 98057 ERIC CUTSHALL 425-430-7423 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SITE PLAN FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CONDUIT DIAGRAM 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - COMMERCIAL PROJECT 9. 10. E-Mail: Cell Phone: Project Manager Contact Information: Manager:BRAD ELKIN 425-495-6489 BRADLEY.ELKIN@PSE.COM N Vicinity Map N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 316986-165284 25kVA 6247000 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP BRAD ELKIN 425-495-6489 05/15/17 BRAD ELKIN 425-495-6489 05/15/17 N/A N/A N/A JUSTIN HANG 253-508-7880 05/15/17 EASEMENT REQUIRED CITY OF RENTON GROUP HEALTH LONGACRES SIGNAL INSTALLING 1Ø PRIMARY L/E & CONNECTING UG PERM SVC SW 27TH ST & NACHES AVE SW, RENTON, WA 98058 N/A N/A N/A 105085007 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R04E, SEC 25 NW N/A N/A 2304E097 2305E124 2304E097 RJN-27 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SITE SPECIFIC NOTES J01 GRID 316988-165283: -INSTALL 1 - 12kV ELBOW KIT V01: -INSTALL 36" X 42" X 38" MP W/ UNITSTRUTS & GNDS -INSTALL 25kVA 120-240v PADMOUNT TRANSFORMER -INSTALL 1 - 12kV ELBOW KIT -INSTALL 1 - 12kV DUST CAP -INSTALL CABLE TAG: %‘(+( -INSTALL GRID NUMBER: 316986 - 165284 -TAG & CONNECT CUSTOMER OWNED SVC M01: -INSTALL 1 - 200AMP METER SPAN SPECIFIC NOTES *** SEE PRIMARY CABLE & CONDUIT TABLE *** LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 0 SQ. 200AMPS ELECTRIC 10KW 65A 0.8% 1.5% CIRCUIT FEET ADDED: 15' CABLE DIAGRAM NOT TO SCALE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) J01 V01 2 1 15 1 146.2 145.9 1/0 AL JKT 30 EHE133 NOT TO SCALE TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRONTVAULT DETAIL AT V01 SCALE: NONE