Loading...
HomeMy WebLinkAboutP_Design_101105560_V1_170605GENERAL SPECIFICATIONS Scope of Work 5-18-17 PER LUKE NEELY CELL 253-569-2523: NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D CORE HOURS, LOCATES, OUTAGE ON 3 RESIDENTIAL CUSTOMERS, BORE, VAC TRUCK, BACKHOE CUSTOMER CONTACTS: ASHLEY & DYKKI SETTLE 919.758-7760 OR 206-886-8274 justashq@gmail.com ELECTRICIAN: GARRETT DAVIS - B&G ELECTRIC 425-7864649 garrett@bgpmaintenance.com RENTON ELECTRICAL INSPECTOR: JACK OXFORD CELL 206-999-1822 joxford@mntonwa.gov PROBLEM: THE UG SVC TO THE CUSTOMER IS AN OLD #4 CU TRIPLEX RATED FOR APPROX 110AMPS, PASSES THROUGH THE BASEMENT OF THE HOME IN A 1.5" STEEL CONDUIT, AND IS UNDERRATED FOR THE CUSTOMER'S PROPOSED 320 CLASS PANEL. General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept dear of debris and all Construction materials; equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Rightof-way involving a Permit. - All system switching shall be approved by System Operations (425-8824652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground Cable information in red on Foreman's copy of worksketch - Return one Foreman's copy of worksketch to Project Manager at completion of job. -When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. OVERHEAD CONSTRUCTION Poles & Structures - Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. - All new poles set shall be the class indicated on the sketch, or better. Do not set a lower Gass pole than specified. - Install ground plate assembly on all new poles. - Install grid numberson all new and existing poles as shown on sketch. - Straighten existing poles as indicated or as necessary. - Treat all field -drilled poles with copper napthenate wood preservative. - Remove old poles after Communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Use stirrups to Connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SO aluminum -covered tie -wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers with preformed helical grip ties. - Apply avian protection devices when required per Standard 6015.2000. -Appy grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral - Use Load -interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. 323 319 SCALE. 17=50' 327 507 � 335 508 343 g ��--� 317790-165658 25kVA 120/240v 560 U 317782-165642 25kVA 1201240v r 317776-1655 e fto m Sw3R0 Pt 4S4 SITE PLAN SCALE: V= 50' 50WA 317777-165659 -- t (101081114) 360 II 354 304 SITE SPECIFIC NOTES 2Q)/ AT P01 AT GRID 317790-165658: REPLACE 40'1943 POLE WITH A NEW 40' CL 3 POLE & GND PL ON NORTH SIDE OF EXIST POLE. INST 1PH PTP & R/C FOR COM NEUT PER STD 6031.1010 FIG 1 TAN112 TRANSF 1 P PRIMARY AND COM NEUT 318 INST NEW 37.5KVA 120/240V XFMR & NEW LBC/O FUSE 15T INST NEW 3" RISER ON SO BKTS FOR NEW 350MCM UG SVC TO ADDRESS 338 TRANSF 2 OH SVCS & ST LT \ TEL & TV TO TRANSF FROM P01 TO I131: 324 /BORE ONE 3" RED POLYPIPE 40 FEET (TO AT LEAST 5 FEET EAST OF EAST EDP) 330 / FROM IPI TO HH1: BORE ONE 3" RED POLYPIPE 83 FEET (TO AT LEAST 5 FEET NORTH OF NORTH EDGE OF 18 FOOT WIDE DRIVEWAY) 335 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING'. NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) U2T4 • I Al Cl zs q 1 1 I j 7 I 132r�5r1 l e .Y v -'A W—€ ---S 3s FROM HH1 TO THE NEW METER BASE: BORE ONE 3" RED POLYPIPE 55 FEET (TO GO UNDER THE TREE ROOTS) TO NEW 320 CLASS METER BASE AT HH1: INST NEW 17" X 30" PE HH (MID 7664500) WITH THREE 3 -POS FARGOS PER STD 6050.2000 FIG 4 HH16350 FROM P01 TO HH1: PULL IN NEW 350MCM TPLX 154 FEET FROM HH1 TO NEW 320 CLASS METER BASE: PULL IN NEW 350MCM TPLX 55 FEET + 8 FEET TRANSFORMER REMOVAL Removed at site: PO l Grid Number: 317790-165658 kVA Rating: 25 - - Foremen to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage TRANSFORMER INSTALLATION Installed at site: Poll Grid Number. 317790_-_1.65658 kVA Rating: 37.5 Foreman to redline the following Information Company ID#: _ Primary phase connected to: Tested Secondary Voltage / Excavation - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors or as required by the permitting Agency. - All conductors/conduits shall have a minimum of 3" of bed and 3" of clean sand cover. - No rocks larger than 6" shall be included in backfill- - ackfdL- Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. Vaults & Handholes - Refer to PSE standard 6775.0040 "Vault and Handhole Installation" - Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All Conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road Crossing conduits. - Install insulating caps on all unused primary bushings. - All "spare conduits shall be capped at each end. — — — — — — NEW CONDUCTOR AND OR TRENCH LINE • NEW POLE O EXISTING POLE ORI DISCONNECT -FUSED ^+-•OR0 DISCONNECT -UNFUSED Enter Sect Gas Wk CI1 WA WA OVERHEAD JUMPER CONNECTION V OVERHEAD TRANSFORMER D OR D CONDUIT RISER M SEC SW18T23NR05E STREET LIGHT E- DOWN GUY ® OR® ENERGY CUSTOMER DEMAND POINT O SECONDARY HANDHOLE LEGEND FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED& Nock Area lot in CLEAN/SAFE Condbon. ❑ Griq Cable, and Setb:lr numbers INSTALLED & VERIFIED. ❑ Field Changes RED-LWED on AadA& D Material VERIFIED and CHANGES noted! on Paper gnat. D Trial PRIMARY Caae mfed on A It. D Cwnpany IDK. RECORDED in correct krabon an As k D Indirate crxrect FUSE SIZE on AElxa8& VERIFY proper PHASE ❑ DeNalions nptetl on Be Asbu6 antl Mer raexn. D Ioawy Mat Me work pertwmed nreeh PSE'. atanow,19 and vocedu and Mataliquant, requirements are mot Foreman's Not Na. once Vicinity Map Thomas Guide page 656 SITE Xl /Umeter ase I •'� ST OH Expense WA 583 • \ PCR UG ExPanse N/A 564 13 N AW OH Expense N/A 593 9 �E UO tIr/�$ Expense N/A 694 25Td 40TH.I, A. 30 '• C 3! gm • Removal N/A 108101019 .r �TyNa..:�.....-1..."", Owner/Developer Contact Info i S 2 Sr• •..••.., .. �5T5. / y� IB IB fi5T '3� :• 30 •••�h•••?I Ashley &Dykki Sale "•r; •py\ /C rS ... —.l 30• 30 C TV 338 Stevens Ave SW r ` 40 3 Renton, Ash" & 57 Dy ,. ,� JOB SITE :�, PU7 ATTN:Ashey&DykkiSe�e WAOMa ��r,� Bal ••: " „•{ F••S••$J.• t Project Manager Contact la ormation: 91&758-7760 or 206-886-6274 / © �' T B • • ; •cam •• • 5 Luka rteeN For contacts below dial 1 -888 -CALL PSE (2253773) ` y CALL (800) 424ZSSS 002733/ ,g 1. 4 16 0 S N385 •s•�r•_r / X52 (253)569-2523 Cog Phone r 4QTk r / ,.t ••• 3 : X1034 Intal R eed" 2 BUSINESS DAYS BEFORE YOU DIG �y ti X15573 EAR„ 155T: ....".�AV :... BSSS.Y`.'e... 5/ if• = ESTATE/ NT R }..{l••:• •. tg aQV NO IRS SKETCHNm TO BE REIIFD UPON FOR EUCT LOCN110N OF E%ISIWG FACIIIIIE$ g %t 2s1 TC Q •Outages Requite• No REAL EASEAME PE MR B "Plaggirg Requi No City of Renton �.....:. : `••1""i&•. a••-. - - � r :_ "..c [ ' Inn OVERHEAD CIRCUIT MAP (2305E076) SCALE: 6"= 1 MILE SCALE: NONE 1 I I I IENGR-POWER I Luke Neely 1 253389-2523 05/18/17 REV# I DATE By DESCRIPTION Gas Orae ENGR-GAS WA WA N/A COUNTY KING Enter Sect Gas Wk CI1 WA WA POWERWKCTR QCSOKE DRAWN BY Todd Zumwalt 253-2663231 0526/17 CHECKED BY PAGE M SEC SW18T23NR05E OP MAP WA PLAT MAP WA APPROVED BY - FOREMAN#1 U -MAP NO (POWER) OH CWT MAP UG CKT MAP CIRCUIT NO FOREMAN #2 PUGET EAR -17 338 STEVENS AVE SW RENTON muvcm N/A nwvr N/A SOUND Gas Orae Order ENERGY REPLACE BAD ORDER UNDERGROUND SERVICE N/A 101Ele 101105560 338 STEVENS AVE SW, RENTON, WA 98067 SCALE PAGE PSE 1^=50' ih