Loading...
HomeMy WebLinkAboutP_Utility Plan_105081231_V1NVicinity Map47.4364,-122.2065Owner / Developer Contact InfoofficeATTN:Harbour Homes, LLC400 N. 34th Street, Suite 300Seattle WA, 98103 Jaime Waltier206-315-8130THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.10.9.8.7.6.5.4.3.2.1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCHPROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITESSUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVESTABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FORVAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IFREQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FORDISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALLTRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTHINDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLEDTO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARYCABLES PER THE CIRCUIT ONE-LINE DIAGRAM.UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROADCROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ONWORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PERPUGET SOUND ENERGY STANDARDS.AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES INCONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES INCONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.(EXCAVATION: 3' SQ.)AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT ASINDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OFSTANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TOEXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THESTREET LIGHT STANDARDS. )INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMESAND DATES.POWER GENERAL NOTES - PLAT PROJECT105081231107052114DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPB.HARMON425.495.55286.30.16F.GOMEZ253.395.68386.30.16F.GOMEZ253.395.68386.30.16N. HOSSEINI.2.23.17REDT # ( RW-096939 )CITY OF RENTONVuecrest Estates1Ø PRIMARY U/G LINE EXTENSION - 28 S/F LOTS4903 Main Ave S Renton WA 98056PUGET SOUND ENERGYN/AIP 132.60107052114105081231N/A1 OF 5KING32CIKNCQCSOKE32SW-T23N-R05E212.080215.0822205E1272305E1362305E127NOP-26COMCASTBILL WALKER253-288-7538CENTURYLINKCALE HARTMAN206-345-4055RIGHT-OF-WAYALEX MALESIS425-462-3436TESP PLANNERKAREN PAVLETICH425-462-387111.E-Mail:Cell Phone:Project Manager Contact Information:Manager:Brian Harmon425.495.5528brian.harmon@pse.comxxxStandoff Bracket15" Min LengthConduit ClampConduitField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLCDirection of Vehicular TrafficCONDUIT RISER PLACEMENT DETAILTOP VIEWNot to Scale.........xjwaltier@harbourhomes.comVAULT DETAIL @ V01, V02 & V03SCALE: NONETOP VIEWSIDEVIEWEXCAVATION:4-2/3 CUBIC YARDSRockCrushed6"3'-6"2"6'6'48"42"36"38"42"StrutsFRONTFRONTTYPICAL NOTCH-OUT FOR TRANSFORMER,SCALE: NONE& SECONDARY PEDESTAL/HANDHOLEBACK OF EASEMENTSTANDARDEASEMENTLINEROW10'PL1'4' - 5'Min.1'7'7'TRANSFORMER(WHEN PRESENT)42"45°42"1'45°Property LineRoad SideTop View of Mainline Trench forSingle Stubout Location3'Property LineRoad SideTop View of Mainline Trench for Pedestalor Double Stubout Location42"45°3'45°STUBOUT EXCAVATION DIMENSIONSNot to scaleJOINT TRENCH DETAILNot to scale JOINT TRENCH DETAILNOTES:1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *2. Rocks greater than 10 inches diameter are not permitted in the final backfill.3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.4. Utilities shall not be stacked over the gas line in the trench.5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.* Alternatives to full-width trench shading require PSE approval.Primary & Secondary-Mainline Gas & Communications (NTS)ROAD SIDENATIVESECONDARY POWERPEDESTALMATERIALP/LPowerSecondaryPowerPrimaryConduitTel. & TV12" Min12" SandCover whengas line is intrenchSand6" or 12"4" Sand Bedding1'36"Cover42"Gas12"18"Lower2"10"PedestalPSE 10' FRONTAGEEASEMENT1'CoverROAD SIDEMINIPADMINIPADFIELD SIDEVAULT6" of crushed rock(base for vault)P/LPowerSecondaryPowerPrimaryGas12" Min Horizontal SeparationCommunications42" Min21"1'Feeder38"2"4" Sand Bedding12" SandCover36"Cover4" Sand Bedding42"6" Additional depth whenFeeder is requiredPSE 10' FRONTAGE EASEMENT1'TRANSFORMERFinalBackfillInitialBackfillTrench Depth42" - 48"PrimaryDirt PileFinal Grade24" Min36"Min CoverOver Power48"MaxDepthFinal BackfillGas4" Sand BeddingProperty Lineintercept (depth varies).SidewalkCurbLocation of roof drain48" TypicalWidth may vary perNumber of Utilitiesand Conduits6" or 12" Min Sand ShadingOver Gas after Compaction12" MinR/W orExcavated12" TypicalPowerSecondaryPowerTV & TEL12" Min12" MinSeparation4,51,21366" or 12" Min Sand Shading Over Power after Compaction1MINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALEOIL-FILLED EQUIPMENTTRANSFORMERAPPROVEDAREACOMBUSTIBLE BUILDING WALLS & ROOF10'10'10'SHALL BE STAGGEREDCONNECTOR BARSIN THE FRONTNEUTRALS SHALL BE18"16"13"12"10"2"10"Pedestal will accept up to six 3" conduitsSEALED WITH FOAMCONDUIT SHALL BE120 PVC CONDUIT ELBOWSTYPICAL 24" RADIUS DBSIDE VIEW WITH CONDUIT10"18"16"13"10"2"36"FRONT VIEW WITH CONDUITSECONDARY PEDESTAL DETAIL @ H1A, H1B, H2A, H3A & H3BNOT TO SCALESITETOP VIEWExcavation - 10-1/3 cubic yardsSIDE VIEWRockCrushed6"4'-4"2"8'8'4'-8"3'-6"4'-8"6"VAULT DETAIL @ PV1Not to scaleMINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALEOIL-FILLED TRANSFORMERTRANSFORMERAPPROVEDAREACOMBUSTIBLE BUILDING WALLS & ROOF3'3'REDUCED FLAMMABILITY3'@ V02-V03@ V01FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.GASPHONECABLE TV503212610105081231101105960504705493101105900105085099593184554594114699503212612107052114106325774PROJECT PHASEPWRNOTIF#ORDER#Superior (Plat)Comm HHSuperior (TESP)Misc O/HMisc U/GDistributionService StubsHP Svc/MSAO/H WireRemoval108101423593185071ReplacementO/H Xfrmr583057134 1234567201918171115161314TRACT "D"81210TRACT "E"SMITHERS AVE STRACT "A"(PROPOSED)TRACT "C"9TRACT "B"1 A2 A3 A4 A5 A6 A7 A8 ATRACT "A"102ND AVE. SE (MAIN AVE. S)TRACT "G"TRACT "H"471718615PROVIDE CROSSING SLEEVES ONPROPOSED GAS AND ELECTRICDISTRIBUTION FACILITIES DUE TOMINIMAL COVERFUSE @ 100TSW#X7833042'32'53'20'20'53'FUSE @ 40TSW#T78339DEVELOPER TO INSTALLCONDUIT & WIRE FROM S/LMETER TO HANDHOLESE 186TH ST.SE 186TH ST.(EXISTING)AVE S 50'(PLAT)NOP 26NOP 26N.O.CLOSED UNDERW.O. #101105900 (SEEPG. 5 FOR DETAILS) :1‘72%(,167$//('81'(5W.O. #101105900, SEE PG. 5)FOR DETAILS)1" = 50'DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPB.HARMON425.495.55286.30.16F.GOMEZ253.395.68386.30.16F.GOMEZ253.395.68386.30.16N. HOSSEINI.2.23.17REDT # ( RW-096939 )CITY OF RENTONVuecrest Estates1Ø PRIMARY U/G LINE EXTENSION - 28 S/F LOTS4903 Main Ave S Renton WA 98056PUGET SOUND ENERGYN/AIP 132.601070521141050812311" = 50'2 OF 5KING32CIKNCQCSOKE32SW-T23N-R05E212.080215.0822205E1272305E1362305E127NOP-26COMCASTBILL WALKER253-288-7538CENTURYLINKCALE HARTMAN206-345-4055RIGHT-OF-WAYALEX MALESIS425-462-3436TESP PLANNERKAREN PAVLETICH425-462-3871SITE PLANSCHED.SQ. FT.MAX LRC = CIRCUIT FEET ADDED: 148527250080 AMPSTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)CLEAR WORKING SPACE FOR VAULTSNOT TO SCALEFIELD SIDE (PREFERRED)ROAD SIDE (PREFERRED)6' MIN3'MIN3'MIN3' MINDEDICATED FACILITIES (105081231) for Dedicated Stub LocationSITESPANADDITIONALREMARKSLABOR UNITS#FROMTOFOOTAGEV01Lot 4 A50Dedicated Conduit & Cable(Stub Location)2-36, 2-54AV02Upgrade to Reduced FlammabilityH2ALot 1150Dedicated Conduit & Cable(Stub Location)2-36, 2-54AV03Upgrade to Reduced FlammabilityV03Lot 250Dedicated Conduit & Cable(Stub Location)2-36, 2-54AV03Lot 350Dedicated Conduit & Cable(Stub Location)2-36, 2-54AH3BLot 550Dedicated Conduit & Cable(Stub Location)2-36, 2-54ATOTAL FT=250VAULT & EQUIPMENT TABLESITE #GRID #VAULT SIZE &COVERTYPE & SIZEEQUIPMENT INVAULTPRIMARYBUSHINGSTRANSFORMER ID NUMBERS(COMPANY ID)AS-BUILT INFORMATIONLBDCFOREMAN: INCLUDE PHASE TAPPEDJ01EXISTING3162061660994'8"x4'8"x4'w/20"x44" HoleMatid: EXISTING1PH J-Box PMw/4 Pos J-BusMatid: EXISTING--EXISTING 1ØCLOSE NORMAL OPEN @ J01SEE PG. 5 FOR DETAILSJ02EXISTING3161371661714'8"x7'x5'w/2-3' Sq DoorsMatid: EXISTINGJ-Box Below Gradew/4 Pos J-BusMatid: EXISTING--EXISTING 3ØSWAP CABLE TAG #58223FROM CØ TO AØSEE PG. 5 FOR DETAILSV0131619716605042"x48"x38"Unistrut HHMatid: 766300137.5kVA MP TRF120/240Matid: 62470502-MINU1SL 6045.1010V0231621316599642"x48"x38"Unistrut HHMatid: 766300137.5kVA RF MP120/240Matid: 99955282-MINU1SL 6045.1010V0331624216599042"x48"x38"Unistrut HHMatid: 766300137.5kVA RF MP120/240Matid: 999552811MINU1SR 6045.1010PV13162011659944'8"x4'8"x4'w/4'8" Sq w/3' DoorMatid: 7663900Matid (Lid): 7656400Splice 15KV200A. 1/0Matid: SPL10J--SVSB20 6051.1500SITE SPECIFIC NOTESCOOLING5' MIN5' MIN10' MIN5'MINFINSACCESSCONCRETE PADMINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALECURB OR EDGE OF PAVEMENTCURB OR EDGE OF PAVEMENT5' MINROAD ORPARKING AREATYP. PAD& TRANS-FORMER3'MIN3' MINDOORACCESSDOORREQUIREDWORK SPACEAREA3' MINCROSSING CONDUIT TABLEX-ING#LOCATIONGASPOWERXINGLENGTHTYPE OF CROSSING(Feeder, Primary, Secondary, etc.)FROMTOSIZE(IN)TYPEQTYLOCATIONSIZE(IN)TYPEQTYX01Tract "A"Lot 94401W280160Gas Main and PrimaryX02Lot 13Lot 82401S380260Gas Service and SecondariesX03Lot 6Lot 134401N280160Gas Main and PrimaryX04Lot 5Lot 142401N380260Gas Service and SecondariesX05Lot 4Lot 162401N380160Gas Service and SecondaryX06Lot 2Lot 174401S380160Gas Main and SecondaryX07Tract "C"Tract "B"4401S280185Gas Main and Primary2" PVC PLUG /CAPS = 62" YELLOW SCH 40 PVC = 180 FT2" SCHED 80 GREY PVC = 205 FT2" PVC PLUG /CAPS = 64" PVC PLUG /CAPS = 84" YELLOW SCH 40 PVC = 265 FT3" SCHED 80 GREY PVC = 360 FT3" PVC PLUG /CAPS = 12AT P01 (316181-166089) 1961 - 40'-INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LINKBREAK CUTOUT-STIRRUP (2254000) & SURGE ARRESTOR (TSU1C1) 6043.1000-INSTALL (1) 2" PRIMARY RISER ON STANDOFF BRACKETS (RIS2CSS) 6042.1000-FUSE @ 40T (3412500), TAP 'A' PHASE-INSTALL SWITCH# T78339CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADTOTALCIRCUIT:A PHASE B PHASE C PHASENOP-265.06.16183214265254214207PHASE SWAP @ J02+58--58EST. NEW LOAD+13--58-B.O. POLE REPLACEMENT AND OFFSITE WORK TO TAKE PLACE PAGE 5 FOR DETAILS (CHARGED TO W.O. #101105900)SYSTEM COORDINATION NOTES:SEE PAGE 5 BEFORE ENERGIZING NEW PLAT DEVELOPMENT. SEE 12345672019181711151613148121091 A2 A3 A4 A5 A6 A7 A8 ATRACT "G"TRACT "H"PROVIDE CROSSING SLEEVES ONPROPOSED GAS AND ELECTRICDISTRIBUTION FACILITIES DUE TOMIMIMUM COVERFUSE @ 40TSW#T78339DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPB.HARMON425.495.55286.30.16F.GOMEZ253.395.68386.30.16F.GOMEZ253.395.68386.30.16N. HOSSEINI.2.23.17REDT # ( RW-096939 )CITY OF RENTONVuecrest Estates1Ø PRIMARY U/G LINE EXTENSION - 28 S/F LOTS4903 Main Ave S Renton WA 98056PUGET SOUND ENERGYN/AIP 132.60107052114105081231AS SHOWN3 OF 5KING32CIKNCQCSOKE32SW-T23N-R05E212.080215.0822205E1272305E1362305E127NOP-26COMCASTBILL WALKER253-288-7538CENTURYLINKCALE HARTMAN206-345-4055RIGHT-OF-WAYALEX MALESIS425-462-3436TESP PLANNERKAREN PAVLETICH425-462-3871.........THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)SECONDARY CABLE & CONDUIT TABLELOCATIONCABLECONDUITVOLTAGEASBUILT INFORMATIONSIZELENGTHASSUMEDSIZELENGTHBENDSDROPFLICKERForeman - CompleteFROMTO(1/O,4/O,350)Design (ft)Lot Corner toMeter (ft)(in)Design (ft)ƒƒƒƒ(Percent)(Percent)Actual Amount InstalledCableConduitV01H1A350250325022.92.5V01LOT 3A4/O13060313012.93.3V01LOT 4A4/O12560312512.93.3V01LOT 5A1/O156021512.52.3V01LOT 6A1/O156021512.52.3V01LOT 7A1/O706027012.93.4V01LOT 8A4/O13080313013.13.7H1ALOT 1A1/O6023.43.7H1ALOT 2A1/O6023.43.7H1AH1B4/O135313533.23.8COMM HH - CHARGE TO W.O. #105085099V02H2A350190313032.82.1V02LOT 74/O1056034522.63.1V02LOT 84/O10560310522.63.1V02LOT 91/O156021512.32.3H2ALOT 104/O606026013.33.4Label Yellow Tag "MUST BE 4/0 TO METER"H2ALOT 114/O556025513.33.3Label Yellow Tag "MUST BE 4/0 TO METER"H2ALOT 121/O60203.33.3H2ALOT 134/O606026013.33.4Label Yellow Tag "MUST BE 4/0 TO METER"V03H3A3501753115213.52.1V03H3B3501153115213.11.8V03LOT 11/O656026513.53.3V03LOT 21/O606026013.53.2V03LOT 31/O606026013.53.2V03LOT 41/O6560265113.53.3V03LOT 164/O14060380213.53.5H3ALOT 174/O656026514.03.3Label Yellow Tag "MUST BE 4/0 TO METER"H3ALOT 181/O6024.03.2H3ALOT 191/O6024.03.2H3ALOT 204/O7060270114.03.4Label Yellow Tag "MUST BE 4/0 TO METER"H3BLOT 54/O556025513.93.4H3BLOT 64/O606026013.93.4H3BLOT 144/O906033024.03.7H3BLOT 154/O906033024.03.71/O UG Triplex (ft) =3652" PVC & BENDS (ft)=79015111.44/O UG Triplex (ft) =14753" PVC & BENDS (ft)=142025213.3350 UG Triplex (ft) =730TOTAL QTS OF GLUE4.7NEW CONDUIT DIAGRAMSCALE: NONESECONDARY 2"SECONDARY 3"PRIMARY 2"CONDUIT LEGENDSECONDARY HH/PEDESTAL TABLESitePedestalorHandholeNumber ofPositionsRequiredRemarksH1APEDESTAL4- SEPS4 6050.1000H1BPEDESTAL2- SEPS3 6050.1000 / COMM HH - CHARGE TO W.O. #105085099H2APEDESTAL5- SEPL6 6050.1000H3APEDESTAL5- SEPL6 6050.1000H3BPEDESTAL5- SEPL6 6050.1000 CØFUSE @ 40TSW#T78339CØFEED EXISTING #2ACSR #2ACSR#2ACSRW.O. #101105900 - See Pg. 5) (FEED TO PLAT)(To Be Swapped To AØ UnderAØW.O. #101105900 - See Pg. 5) (To Be Swapped To AØ UnderW.O. #101105900 - See Pg. 5) (To Be Swapped To AØ UnderFUSE @ 100TSW#X78330 :1‘72%(,167$//('81'(5W.O. #101105900, SEE PG. 5)FOR DETAILS)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPB.HARMON425.495.55286.30.16F.GOMEZ253.395.68386.30.16F.GOMEZ253.395.68386.30.16N. HOSSEINI.2.23.17REDT # ( RW-096939 )CITY OF RENTONVuecrest Estates1Ø PRIMARY U/G LINE EXTENSION - 28 S/F LOTS4903 Main Ave S Renton WA 98056PUGET SOUND ENERGYN/AIP 132.60107052114105081231AS SHOWN4 OF 5KING32CIKNCQCSOKE32SW-T23N-R05E212.080215.0822205E1272305E1362305E127NOP-26COMCASTBILL WALKER253-288-7538CENTURYLINKCALE HARTMAN206-345-4055RIGHT-OF-WAYALEX MALESIS425-462-3436TESP PLANNERKAREN PAVLETICH425-462-3871.........EX OVERHEAD CIRCUIT MAP 2305E136SCALE: NOT TO SCALEEX UNDERGROUND CIRCUIT MAP 2305E127SCALE: 1" = 100'THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)PRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITCABLEASBUILT INFORMATION - FOREMAN COMPLETEFROMTOSIZE(IN)QTY.DESIGNLENGTH(FT)BENDSPULL(LBS)PULLREV(LBS)CABLESIZEDESIGNLENGTH(FT)PHASE - ID TAGRECORDRECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED90°45°22°11°ABCMANUFACTURERCOMPOUNDYEARNOTESCONDUITCABLEP01V01214151-1-2082231/0 AL JKT445EHN388--CØ SWAPPED TO AØ @ 316137-166171SEE W.O. #101105900 (PG. 5) FOR DETAILSV01PV121600-1412032711/0 AL JKT620EHN389---PV1V0221802-111571411/0 AL JKT160EHN389---V02V03212702-1-2783011/0 AL JKT350EHN390---V03E0121951---CONDUIT ONLYFUTURE2" PVC (FT) & BENDS =146051721/0 AL JKT TOTAL (FT) =1575NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAMSCALE: NONEAØ-EHN3881/0 AL JKTAØ-EHN3891/0 AL JKTAØ-EHN3891/0 AL JKTAØ-EHN3901/0 AL JKTSITESITECØ-AAK443(To Be Swapped To AØUnder W.O. #101105900See Pg. 5)FEEDNEWN.O. @ J01 TO BE CLOSED UNDERW.O. #101105900 (SEE PG. 5)CØ-58231(To Be Swapped To AØUnder W.O. #101105900See Pg. 5)CØ-58228(To Be Swapped To AØUnder W.O. #101105900See Pg. 5) N.O.AT J01 TO BE CLOSED NOP 26 FUSE @ 100T SW#X78330 1(:12:1‘ #2ACSRB.O. POLE 1" = 100' OFFSITE PLAN CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN PLAT (SEE W.O. #105081231 FOR DETIALS) Utility Pole Erosion Control UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS GRID #HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT P01 316181 166089 40'UNK 1961 CENTURYLINK/COMCAST POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 316181-166089 40 3 1961 PSE Equip #