Loading...
HomeMy WebLinkAboutMFP17003155DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17003155 IVR Number: 17003155 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:07/05/2017Applica!on Date:3424059113Parcel Number:13701 SE MAY VALLEY RD Permit Type :07/27/2017Issue Date:Franchise Permit Work Class:07/27/2018Expira!on Date :Minor U(lity Job Number:#105085341Franchise Type :Electric Descrip!on:INSTALL NEW UNDERGROUND SERVICE FROM EXISTING POLE P01 TO NEW HANDHOLE V01. CONDUIT WILL BE IN JOINT TRENCH. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183ApplicantX VICKI HENSON POTELCO INC 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010 ) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP17003155 Holly Powers Restoration per City of Renton Standards Justin Johnson 7-24-2017 7/28/2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form MFP17003155 Justin Johnson SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). SE May Valley RdCoal Creek Pkwy SE121211111111 111111111116STOPFLAGG ER STOPFLAG G ER ONE LA N E ROAD AHEAD W20-4350'350'350'ROAD WORK AHEAD W20-1W20-7AFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K PLACE SIGNS ONBOTH SIDES OFWORKING AREAONE LANEROADAHEADW20-4 350'350'350'ROADWORKAHEADW20-1 W20-7A ONE LANEROADAHEADW20-4350'350'350'ROADWORKAHEADW20-1W20-7ACHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJob#10508534113701 SE May Valley Rd Renton, WAJune 16th, 2017Sheet 1 of 2 mitchell.peterson@pse.com425-398-6071Notes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPOLEPSETraffic Control Supervisor:Eduard VolianskyiCard No. 010041Card Exp. 11/30/2019Eduard.Volianskyi@pse.com(425) 4246428 SE May Valley RdCoal Creek Pkwy SE121211111111 111111111116STOPFLAG G ER STOPFLAGG ER ONE LAN E ROAD AHEAD W20-4350'350'350'ROAD WORK AHEAD W20-1W20-7AFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA RK PLACE SIGNS ONBOTH SIDES OFWORKING AREAONE LANEROADAHEADW20-4350'350'350'ROADWORKAHEADW20-1W20-7AONE LANEROADAHEADW20-4 350'350'350'ROADWORKAHEADW20-1 W20-7A CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJob#10508534113701 SE May Valley Rd Renton, WAJune 16th, 2017Sheet 2 of 2 mitchell.peterson@pse.com425-398-6071Notes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPOLEPSETraffic Control Supervisor:Eduard VolianskyiCard No. 010041Card Exp. 11/30/2019Eduard.Volianskyi@pse.com(425) 4246428 319215-167310 SW____ 25T FUSE 13701 PARCEL # 3424059113 13711 13719 DWY 319216-167299 GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# Superior PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)105085341Owner / Developer Contact Info officeATTN: ELIAS YIRGA WOLDE 8933 133RD AVE SE NEW CASTLE, WA 98059 ELIAS YIRGA WOLDE (206) 790-4136 N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP S. RUSSU (253) 208-9712 - S. RUSSU (253) 208-9712 - T. MYER (714) 893-2405 06/05/17 TBD TBD WOLDE - NEW SFR PRIMARY LEWS AND 320 A SERVICE 13701 SE MAY VALLEY RD, RENTON, WA 98059 ASPLUNDH CONSTRUCTION CORP. N/A N/A N/A 105085341 1" = 50'1 OF 1 KING CSPSKEIN SW 34-24N-05E 2405E135 2405E136 MAP-16 2405E135 504471633 105085341 E-Mail: Cell Phone: Project Manager Contact Information: Manager:SERGEY RUSSU (253) 208-9712 SERGEY.RUSSU@PSE.COM 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - RESIDENTIAL PROJECT ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. SITE SPECIFIC NOTES P01: 319223-167302 -EX. 45' CL2 (1998) POLE & EQUIPMENT TO REMAIN -INSTALL 1Ø TERM & L/B C/O; FUSE @ 25T (TAP-AØ) -INSTALL 2" PRI. RISER ON S/O BRACKETS -INSTALL CABLE TAG -INSTALL SWITCH #T______ V01: 319197-167304 -INSTALL 36" X 42" X 48" MP H/H & GRDS -INSTALL 37.5KVA 1Ø 120/240V TRF -INSTALL (1) L/B ELBOW & (1) DUST CAP -INSTALL SEC. CONNECTORS -INSTALL CABLE TAG -INSTALL GRID # M01: NEW METER BASE -NEW 320A METER SITE MAP SCALE: 1" = 50' CIRCUIT FEET ADDED: 60' UNDERGROUND CIRCUIT MAP 2405E135 NOT TO SCALE TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 40 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE OVERHEAD CIRCUIT MAP 2405E136 SCALE: 6" = 1 MILE 64)227$*(64)7 3$1(/6,=($ +($77<3((/(&75,& (67'(0$1'.: /5&$ 9'523 )/,&.(5 JOB SITE CUSTOMER-SUPPLIED SERVICE TRENCH TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts VAULT & EXCAVATION DETAIL Not to scale 6045.1000 1950 lbs Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage V01 319197-167304 37.5kVA CUSTOMER-CONDUIT & RISER LOC. DETAIL SCALE: NONE Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp UNDERGROUND CABLE CONDUITS TO THIS QUADRANT Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 4" Min 18" Min JOINT TRENCH DETAIL Primary-Schedule 40 (NTS) 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 40 Conduit ROADSIDE To Excavated Dirt Pile JOB SITE 25T SW____ $‘(+ SE M A Y V A L L E Y R D SW____ 25T FUSE NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE  581‘$/-.78* 35,&$%/( $‘(+ “   5818*73;“ COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr SCALE: NONE METER DETAIL @ M01 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE MAP-16 5.06.16 160 208 195 3 163 208 195 VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 319197- 167304 36"x42"x38" Unistrut HH Matid: 7663001 37.5KVA MP TRF 120/240 Matid: 6247050 1 1 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED ƒƒƒƒA B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE P01 V01 2 1 170 ----33 88 1/0 AL JKT 110'EH1592 - 2" PVC (FT) & BENDS =170 0 0 0 0 1/0 AL JKT TOTAL (FT) =110 CUSTOMER & DEVELOPER NOTES THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 -REQUIRED TO PROVIDE & INSTALL 1-2" DISCONTINUOUS SCHEDULE 80 PVC CONDUIT FROM P01 TO V01 ± 60' -REQUIRED TO PROVIDE & INSTALL 1-3" DISCONTINUOUS SCHEDULE 40 PVC CONDUIT FROM V01 TO M01 ± 80' -REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS; P01-V01 & V01-M01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 -REQUIRED TO PROVIDE 6' X 6' WORK PIT AT V01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD OF SAND AT M01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -CITY OF RENTON INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION 504701786 104292615Perm Svc SPAN SPECIFIC NOTES P01-V01: -SEE PRI. CABLE & CONDUIT TABLE V01-M01: -INSTALL (1) RUN OF 350 UG TPX ± 150' CUSTOMER SUPPLIED CUSTOMER SUPPLIED (1) 2" SCHD'L 80 PVC CONDUIT ± 120' CUSTOMER SUPPLIED (1) 3" SCHD'L 40 PVC CONDUIT ± 130' CUSTOMER SUPPLIED 4' X 4' WORK PIT 4' X 4' WORK PIT CUSTOMER SUPPLIED 5/8" CUBIC YARD CRUSHED ROCK CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED 6' X 6' WORK PIT See Version 2 319215-167310 13701 13711 13719 DWY 319216-167299 SE MAY V A L L E Y R D PARCEL # 3424059113 SW# T78918 40T FUSE A B CUSTOMER TO BORE ± 60' CROSSING CUSTOMER TO BORE ± 60' CROSSING GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# Superior PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)105085341Owner / Developer Contact Info officeATTN: ELIAS YIRGA WOLDE 8933 133RD AVE SE NEW CASTLE, WA 98059 ELIAS YIRGA WOLDE (206) 790-4136 N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP S. RUSSU (253) 208-9712 5/22/17 S. RUSSU (253) 208-9712 5/22/17 T. MYER (714) 893-2405 06/05/17 REQUIRED RENTON WOLDE - NEW SFR PRIMARY LEWS AND 320 A SERVICE 13701 SE MAY VALLEY RD, RENTON, WA 98059 ASPLUNDH CONSTRUCTION CORP. N/A N/A N/A 105085341 1" = 50'1 OF 1 KING CSPSKEIN SW 34-24N-05E 2405E135 2405E136 MAP-16 2405E135 504471633 105085341 E-Mail: Cell Phone: Project Manager Contact Information: Manager:SERGEY RUSSU (253) 208-9712 SERGEY.RUSSU@PSE.COM 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - RESIDENTIAL PROJECT ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. SITE SPECIFIC NOTES P01: 319218-167321 -EX. 45' CL3 (1999) POLE & EQUIPMENT TO REMAIN -INSTALL 1Ø TERM & L/B C/O; FUSE @ 40T (TAP-AØ) -INSTALL 2" PRI. RISER ON S/O BRACKETS -INSTALL SWITCH # T78918 -INSTALL CABLE TAG # EHI592-A V01: 319197-167304 -INSTALL 36" X 42" X 48" MP H/H & GRDS -INSTALL 37.5KVA 1Ø 120/240V TRF -INSTALL (1) L/B ELBOW & (1) DUST CAP -INSTALL SEC. CONNECTORS 6-POSITION -INSTALL CABLE TAG # A‘EHI592 -INSTALL GRID # M01: NEW METER BASE -NEW 320A METER SITE MAP SCALE: 1" = 50' CIRCUIT FEET ADDED: 250' UNDERGROUND CIRCUIT MAP 2405E135 NOT TO SCALE TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 40 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE OVERHEAD CIRCUIT MAP 2405E136 SCALE: 6" = 1 MILE 64)227$*(64)7 3$1(/6,=($ +($77<3((/(&75,& (67'(0$1'.: /5&$ 9'523 )/,&.(5 JOB SITE CUSTOMER-SUPPLIED SERVICE TRENCH Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage V01 319196-167306 37.5kVA CUSTOMER-CONDUIT & RISER LOC. DETAIL SCALE: NONE Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp UNDERGROUND CABLE CONDUITS TO THIS QUADRANT Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 4" Min 18" Min JOINT TRENCH DETAIL Primary-Schedule 40 (NTS) 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 40 Conduit ROADSIDE To Excavated Dirt Pile JOB SITE $‘(+, SE M A Y V A L L E Y R D NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE  5818*73;“ COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr SCALE: NONE METER DETAIL @ M01 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE MAP-16 6.08.17 183 228 212 3 186 228 212 VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 319196- 167306 36"x42"x38" Unistrut HH Matid: 7663001 37.5KVA MP TRF 120/240 Matid: 6247050 1 1 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED ƒƒƒƒA B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE P01 V01 2 1 250'3 ---353.7 360 1/0 AL JKT 300'EHI592 - 2" PVC (FT) & BENDS =250'3 0 0 0 1/0 AL JKT TOTAL (FT) =300' CUSTOMER & DEVELOPER NOTES THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 -REQUIRED TO PROVIDE & INSTALL 1-2" DISCONTINUOUS SCHEDULE 80 PVC CONDUIT FROM P01 TO POINT B ± 100' -REQUIRED TO INSTALL 1-2" RED POLYETHYLENE CONDUIT FROM POINT A TO POINT B ± 60' -REQUIRED TO PROVIDE & INSTALL 1-2" DISCONTINUOUS SCHEDULE 40 PVC CONDUIT FROM POINT A TO V01 ± 80' -REQUIRED TO PROVIDE & INSTALL 1-3" DISCONTINUOUS SCHEDULE 40 PVC CONDUIT FROM V01 TO M01 ± 105' -REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS; P01-V01 & V01-M01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 -REQUIRED TO PROVIDE 6' X 6' WORK PIT AT V01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD OF SAND AT M01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO BACKFILL WITH 5/8"CRUSHED ROCK IN RIGHT OF WAY -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -CITY OF RENTON INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION 504701786 104292615Perm Svc SPAN SPECIFIC NOTES P01-V01: -SEE PRI. CABLE & CONDUIT TABLE V01-M01: -INSTALL (1) RUN OF 350 UG TPX ± 125' CUSTOMER SUPPLIED (1) 3" SCHD'L 40 PVC CONDUIT ± 105' CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" VAULT & EXCAVATION DETAIL Not to scale 6045.1000 1950 lbs (CONTINUOUS) PSE SUPPLIED (1) 2" RED POLYETHYLENE CONDUIT ± 60'CUSTOMER SUPPLIED 5/8" CUBIC YARD CRUSHED ROCK CUSTOMER SUPPLIED 4' X 4' WORK PIT ƒ CUSTOMER SUPPLIED 6' X 6' WORK PIT ƒ SW# T78918 40T FUSE SW# T78918 40T A B  581‘$/-.78* 35,&$%/( $‘(+, “ (CONTINUOUS) CUSTOMER SUPPLIED (1) 2" SCHD'L 80 PVC CONDUIT ± 100' (DISCONTINUOUS) CUSTOMER SUPPLIED (1) 2" SCHD'L 40 PVC CONDUIT ± 80' ƒ