Loading...
HomeMy WebLinkAboutP_Utility Plan Renton Project_105085341_V1319215-167310 SW____ 25T FUSE 13701 PARCEL # 3424059113 13711 13719 DWY 319216-167299 GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# Superior PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)105085341Owner / Developer Contact Info officeATTN: ELIAS YIRGA WOLDE 8933 133RD AVE SE NEW CASTLE, WA 98059 ELIAS YIRGA WOLDE (206) 790-4136 N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP S. RUSSU (253) 208-9712 - S. RUSSU (253) 208-9712 - T. MYER (714) 893-2405 06/05/17 TBD TBD WOLDE - NEW SFR PRIMARY LEWS AND 320 A SERVICE 13701 SE MAY VALLEY RD, RENTON, WA 98059 ASPLUNDH CONSTRUCTION CORP. N/A N/A N/A 105085341 1" = 50'1 OF 1 KING CSPSKEIN SW 34-24N-05E 2405E135 2405E136 MAP-16 2405E135 504471633 105085341 E-Mail: Cell Phone: Project Manager Contact Information: Manager:SERGEY RUSSU (253) 208-9712 SERGEY.RUSSU@PSE.COM 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - RESIDENTIAL PROJECT ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. SITE SPECIFIC NOTES P01: 319223-167302 -EX. 45' CL2 (1998) POLE & EQUIPMENT TO REMAIN -INSTALL 1Ø TERM & L/B C/O; FUSE @ 25T (TAP-AØ) -INSTALL 2" PRI. RISER ON S/O BRACKETS -INSTALL CABLE TAG -INSTALL SWITCH #T______ V01: 319197-167304 -INSTALL 36" X 42" X 48" MP H/H & GRDS -INSTALL 37.5KVA 1Ø 120/240V TRF -INSTALL (1) L/B ELBOW & (1) DUST CAP -INSTALL SEC. CONNECTORS -INSTALL CABLE TAG -INSTALL GRID # M01: NEW METER BASE -NEW 320A METER SITE MAP SCALE: 1" = 50' CIRCUIT FEET ADDED: 60' UNDERGROUND CIRCUIT MAP 2405E135 NOT TO SCALE TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 40 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE OVERHEAD CIRCUIT MAP 2405E136 SCALE: 6" = 1 MILE 64)227$*(64)7 3$1(/6,=($ +($77<3((/(&75,& (67'(0$1'.: /5&$ 9'523 )/,&.(5 JOB SITE CUSTOMER-SUPPLIED SERVICE TRENCH TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts VAULT & EXCAVATION DETAIL Not to scale 6045.1000 1950 lbs Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage V01 319197-167304 37.5kVA CUSTOMER-CONDUIT & RISER LOC. DETAIL SCALE: NONE Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp UNDERGROUND CABLE CONDUITS TO THIS QUADRANT Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 4" Min 18" Min JOINT TRENCH DETAIL Primary-Schedule 40 (NTS) 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 40 Conduit ROADSIDE To Excavated Dirt Pile JOB SITE 25T SW____ $‘(+ SE M A Y V A L L E Y R D SW____ 25T FUSE NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE  581‘$/-.78* 35,&$%/( $‘(+ “   5818*73;“ COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr SCALE: NONE METER DETAIL @ M01 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE MAP-16 5.06.16 160 208 195 3 163 208 195 VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 319197- 167304 36"x42"x38" Unistrut HH Matid: 7663001 37.5KVA MP TRF 120/240 Matid: 6247050 1 1 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED ƒƒƒƒA B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE P01 V01 2 1 170 ----33 88 1/0 AL JKT 110'EH1592 - 2" PVC (FT) & BENDS =170 0 0 0 0 1/0 AL JKT TOTAL (FT) =110 CUSTOMER & DEVELOPER NOTES THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 -REQUIRED TO PROVIDE & INSTALL 1-2" DISCONTINUOUS SCHEDULE 80 PVC CONDUIT FROM P01 TO V01 ± 60' -REQUIRED TO PROVIDE & INSTALL 1-3" DISCONTINUOUS SCHEDULE 40 PVC CONDUIT FROM V01 TO M01 ± 80' -REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS; P01-V01 & V01-M01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 -REQUIRED TO PROVIDE 6' X 6' WORK PIT AT V01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD OF SAND AT M01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -CITY OF RENTON INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION 504701786 104292615Perm Svc SPAN SPECIFIC NOTES P01-V01: -SEE PRI. CABLE & CONDUIT TABLE V01-M01: -INSTALL (1) RUN OF 350 UG TPX ± 150' CUSTOMER SUPPLIED CUSTOMER SUPPLIED (1) 2" SCHD'L 80 PVC CONDUIT ± 120' CUSTOMER SUPPLIED (1) 3" SCHD'L 40 PVC CONDUIT ± 130' CUSTOMER SUPPLIED 4' X 4' WORK PIT 4' X 4' WORK PIT CUSTOMER SUPPLIED 5/8" CUBIC YARD CRUSHED ROCK CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND CUSTOMER SUPPLIED 6' X 6' WORK PIT