HomeMy WebLinkAboutP_Utility_Plan_Renton_Project_105085341_V2_170717319215-167310
13701
13711 13719
DWY
319216-167299
SE MAY
V
A
L
L
E
Y
R
D
PARCEL #
3424059113
SW# T78918
40T FUSE
A
B
CUSTOMER TO
BORE ± 60'
CROSSING
CUSTOMER TO
BORE ± 60'
CROSSING
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)105085341Owner / Developer Contact Info
officeATTN:
ELIAS YIRGA WOLDE
8933 133RD AVE SE
NEW CASTLE, WA 98059
ELIAS YIRGA WOLDE (206) 790-4136
N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
S. RUSSU (253) 208-9712 5/22/17
S. RUSSU (253) 208-9712 5/22/17
T. MYER (714) 893-2405 06/05/17
REQUIRED RENTON
WOLDE - NEW SFR
PRIMARY LEWS AND 320 A SERVICE
13701 SE MAY VALLEY RD, RENTON, WA 98059
ASPLUNDH CONSTRUCTION CORP.
N/A N/A
N/A 105085341
1" = 50'1 OF 1
KING CSPSKEIN
SW 34-24N-05E
2405E135 2405E136 MAP-16
2405E135
504471633 105085341
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:SERGEY RUSSU
(253) 208-9712
SERGEY.RUSSU@PSE.COM
9.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at
least three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to
commencing work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb
(or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet
away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot
when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as
applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables,
conduits and crossings from the individual unit's meter base to the designated connection point.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES - RESIDENTIAL PROJECT
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
SITE SPECIFIC NOTES
P01: 319218-167321
-EX. 45' CL3 (1999) POLE & EQUIPMENT TO REMAIN
-INSTALL 1Ø TERM & L/B C/O; FUSE @ 40T (TAP-AØ)
-INSTALL 2" PRI. RISER ON S/O BRACKETS
-INSTALL SWITCH # T78918
-INSTALL CABLE TAG # EHI592-A
V01: 319197-167304
-INSTALL 36" X 42" X 48" MP H/H & GRDS
-INSTALL 37.5KVA 1Ø 120/240V TRF
-INSTALL (1) L/B ELBOW & (1) DUST CAP
-INSTALL SEC. CONNECTORS 6-POSITION
-INSTALL CABLE TAG # AEHI592
-INSTALL GRID #
M01: NEW METER BASE
-NEW 320A METER
SITE MAP
SCALE: 1" = 50'
CIRCUIT FEET ADDED: 250'
UNDERGROUND CIRCUIT MAP 2405E135
NOT TO SCALE
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Schedule 40 Grey PVC
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE
OVERHEAD CIRCUIT MAP 2405E136
SCALE: 6" = 1 MILE
64)227$*(64)7
3$1(/6,=($
+($77<3((/(&75,&
(67'(0$1'.:
/5&$
9'523
)/,&.(5
JOB SITE
CUSTOMER-SUPPLIED SERVICE TRENCH
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
V01
319196-167306
37.5kVA
CUSTOMER-CONDUIT & RISER LOC. DETAIL
SCALE: NONE
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
TOP VIEW
Standoff Bracket
15" Min Length
Conduit Clamp
UNDERGROUND
CABLE CONDUITS
TO THIS QUADRANT
Excavated Dirt Pile
Final Grade
24" Min
Backfill for Schedule 40 Conduit
(NO Rocks over 10" Diameter
or foreign objects)Separation
4" Min
18" Min
JOINT TRENCH DETAIL
Primary-Schedule 40 (NTS)
48"
Max
36"
Min
Cover
Phone & TV Primary Power Cable
in Customer Provided
Schedule 40 Conduit
ROADSIDE
To Excavated Dirt Pile
JOB SITE
$(+,
SE M
A
Y
V
A
L
L
E
Y
R
D
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
5818*73;
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
SCALE: NONE
METER DETAIL @ M01
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-16
6.08.17
183 228 212
3
186 228 212
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 319196-
167306
36"x42"x38"
Unistrut HH
Matid: 7663001
37.5KVA MP TRF
120/240
Matid: 6247050
1 1
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE
INSTALLED
A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE
P01 V01 2 1 250'3 ---353.7 360 1/0 AL JKT 300'EHI592 -
2" PVC (FT) & BENDS =250'3 0 0 0 1/0 AL JKT TOTAL (FT) =300'
CUSTOMER & DEVELOPER NOTES
THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
-REQUIRED TO PROVIDE & INSTALL 1-2" DISCONTINUOUS SCHEDULE 80 PVC CONDUIT FROM P01 TO POINT B ± 100'
-REQUIRED TO INSTALL 1-2" RED POLYETHYLENE CONDUIT FROM POINT A TO POINT B ± 60'
-REQUIRED TO PROVIDE & INSTALL 1-2" DISCONTINUOUS SCHEDULE 40 PVC CONDUIT FROM POINT A TO V01 ± 80'
-REQUIRED TO PROVIDE & INSTALL 1-3" DISCONTINUOUS SCHEDULE 40 PVC CONDUIT FROM V01 TO M01 ± 105'
-REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS; P01-V01 & V01-M01
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
-REQUIRED TO PROVIDE 6' X 6' WORK PIT AT V01
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD OF SAND AT M01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO BACKFILL WITH 5/8"CRUSHED ROCK IN RIGHT OF WAY
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-CITY OF RENTON INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION
504701786 104292615Perm Svc
SPAN SPECIFIC NOTES
P01-V01:
-SEE PRI. CABLE & CONDUIT TABLE
V01-M01:
-INSTALL (1) RUN OF 350 UG TPX ± 125'
CUSTOMER SUPPLIED
(1) 3" SCHD'L 40 PVC CONDUIT ± 105'
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
TOP VIEW
SIDE VIEW
EXCAVATION: 4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
VAULT & EXCAVATION DETAIL
Not to scale 6045.1000
1950 lbs
(CONTINUOUS) PSE SUPPLIED
(1) 2" RED POLYETHYLENE CONDUIT ± 60'CUSTOMER SUPPLIED
5/8" CUBIC YARD CRUSHED ROCK
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
6' X 6' WORK PIT
SW# T78918
40T FUSE
SW# T78918
40T
A
B
581$/-.78*
35,&$%/($(+,
(CONTINUOUS) CUSTOMER SUPPLIED
(1) 2" SCHD'L 80 PVC CONDUIT ± 100'
(DISCONTINUOUS) CUSTOMER SUPPLIED
(1) 2" SCHD'L 40 PVC CONDUIT ± 80'