Loading...
HomeMy WebLinkAboutMFP17003306DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17003306 IVR Number: 17003306  Permit InformaƟon Permit Name:Puget Sound Energy ‐ Electric Address/LocaƟon:07/13/2017ApplicaƟon Date:0087000293Parcel Number:17033 108TH AVE SE Permit Type:08/10/2017Issue Date:Franchise Permit Work  Class:08/10/2018ExpiraƟon Date:Minor UƟlity Job Number:105085310Franchise Type:Electric DescripƟon:ACCESS VAULT  V01 AND INSTALL 2 NEW RUNS OF #350CMIL TRIPLEX TO  NEW 30"X30" CONCRETE HANDHOLE AT  HH 1 JOINT TRENCH TO  INSTALL CONDUIT FROM HH1 TO M01. One asphalt cut anƟcipated. RestoraƟon per City of Renton Standards.  Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY ‐ ELECTRIC ‐ BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208‐2183ApplicantX VICKI HENSON POTELCO INC 8001 212th St S Kent, WA 98032 B: (253) 863‐0484Contractor Business License Number: BL.005109Electrical Contractor: POTELI*344O4 ConstrucƟon Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA  98057‐3232 Owner  General CondiƟons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.  This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements.  Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way.  Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010 ) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.  (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT  THE JOB SITE AT  ALL TIMES MFP17003306 Holly Powers Restoration per City of Renton Standards Justin Johnson 8-10-2017 8-10-2017 MFP17003306 Justin Johnson 8-10-2017 8:00 AM to 3:00 PM Monday through Friday 100T SK00601 316678-166296 25kVA 120/240v (105074339)108TH AVE SEROL 15 316801-166297 75kVA 120/240v "10930" "17033" 70' ROW JOB SITE JOB SITE 7' X 7' WORK PIT PSE TO INSTALL ±10' OF (2) #350kCMIL UG TPX RE-ROUTE (2) RUNS CUST OWNED TPX 504676281 105085310 504699285 104292543 PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)105085310Owner / Developer Contact Info officeATTN: RENTON SPECIAL CARE COMMUNITY LLC 2731 77TH AVE SE MERCER ISLAND, WA 98040 KEVIN CARL 206-778-4726 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SITE PLAN FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT ONE-LINE DIAGRAM SCALE: NONE 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - COMMERCIAL PROJECT 9. 10. E-Mail: Cell Phone: Project Manager Contact Information: Manager:BRAD ELKIN 425-495-6489 BRADLEY.ELKIN@PSE.COM N Vicinity Map N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP BRAD ELKIN 425-495-6489 06/19/17 BRAD ELKIN 425-495-6489 06/19/17 N/A N/A N/A JUSTIN HANG 253-508-7880 06/19/17 RIGHTS REVIEW CITY OF RENTON RENTON SPECIAL CARE COMMUNITY INSTALL 1Ø SEC HANDHOLE & CONNECT CUST OWNED SVC 17033 108TH AVE SE, RENTON, WA 98055 N/A N/A N/A 105085310 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SEC 29 NW N/A N/A 2305E116 2305E136 2305E116 ROL-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SITE SPECIFIC NOTES V01 GRID NUMBER 316801-166297: -EXISTING 75kVA MP TRF TO REMAIN -RE-ROUTE (2) RUNS CUST SVC TO NEW SEC HH -INSTALL, LABEL, & CONNECT (2) NEW RUNS #350kCMIL TPX TO HH IP1: -RE-ROUTE 2 CUSTOMER SECONDARY SERVICES TO NEW HANDHOLE (HH1) HH1: -INSTALL 30" X 30" CONCRETE HANDHOLE MID: 9995597 -INSTALL 3 - 6 POS FARGO BARS -TAG AND CONNECT NEW CUST OWNED TPX RUN M01: -INSTALL 1 - 200AMP METER SPAN SPECIFIC NOTES V01 - HH1: ,167$//“ 2)  N&0,/8*73; 594114857Misc UG DEVELOPER CIVIL NOTES: -REQUIRED TO PROVIDE A 5' X 5' WORK PIT AT NEW VAULT VAULT HH1. CUSTOMER SI RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND STANDARDS #6750.6500. DEVELOPER EXCAVATION NOTES: -REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 72 HOURS BEFORE CONSTRUCTION. -REQUIRED TO PROVIDE WORK PITS 72 HOURS BEFORE CONSTRUCTION. -ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 72 HOURS BEFORE CONSTRUCTION. -EXCAVATION AND CITY OF RENTON INSPECTION MUST BE COMPLETED 72 HOURS BEFORE CONSTRUCTION. CONTRACTOR TRENCHING IN CITY OR COUNTY RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OF RENTON TRENCHING REQUIREMENTS UNDER THE PERMIT. IF A PRE-CON IS REQUIRED BY THE CITY OR COUNTY, A PSE PROJECT MANAGER WILL SE A SCHEDULE MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. ALL INSPECTIONS ARE REQUIRED BY PSE IF A SECOND INSPECTION IS REQUIRED ADDITIONAL FEE'S WILL BE APPLIED ELECTRICIAN RESPONSIBILITY -ELECTRICIAN WILL CALL THE DAY THE ELECTRICAL PANEL HAS BEEN INSPECTED BY CITY OF RENTON. -ELECTICIAN WILL CALL THE PSE PROJECT MANAGER BRAD ELKIN, PHONE# 425-495-6489 SINGLE PHASE SECONDARY CONCRETE HANDHOLE Not to scale 6050.2020-1 EXCAVATION: 5-1/3 CUBIC YARDS 2'-6"2'-6" Handhole 820 lbs SIDE VIEW 2'-4"6" Crashed rock 2" TOP VIEW 5'-0" 5'-0" Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be removed by customer or cut off at the vault wall. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE 329310.49305 -.49- 329310305 2017 ROL-15 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A. 100AMPS ELECTRIC 4.3kW 65A 0.1% 0.5% CIRCUIT FEET ADDED: 0' 121214 14 1414SE 172ND ST 108TH AVE SE11 15 V01 HH1 5 STOP FLAGGER STOP FLAGGER BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1100'100'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1 W20-7A100'X'100' ONE L A N E ROAD AHEA D W20-4ROAD WOR K AHEA D W20-1100'100'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A100'100'100'R9-11SIDEWALK CLOSED AHEAD R9-9SIDEWALK CLOSED R9-9SIDEWALKCLOSEDR9-11SIDEWALKCLOSEDAHEADFLAGGERS WILL ASSIST PEDESTRIANS WITH SIDEWALK CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK PLACE NO-PARK SIGNAGE ON BOTH SIDES OF 108TH AVE SE SURROUNDING WORK ZONE #17033 108TH AVE SEJob#105085310(RE) 17033 108th Ave SE, Renton WA July 25, 2017 Sheet 1 of 2 ryan.honeysett@pse.com (425)457-5381 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG FLAGGER STOP VAULTVault Puget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)478-5381 Ryan H. Honeysett 121214 14 1414SE 172ND ST 108TH AVE SE11 15 V01 HH1 5 STOP FLAGGER STOP FLAGGER ROADWORKAHEADW20-1100'ROADWORKAHEADW20-1 W20-7A100'100' ONE LANE ROAD AHEAD W20-4ROAD WOR K AHEA D W20-1100'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A100'100'100'FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK PLACE NO-PARK SIGNAGE ON BOTH SIDES OF 108TH AVE SE SURROUNDING WORK ZONE #17033 108TH AVE SE100'Job#105085310(RE) 17033 108th Ave SE, Renton WA July 25, 2017 Sheet 2 of 2 ryan.honeysett@pse.com (425)457-5381 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG FLAGGER STOP VAULTVault Puget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)478-5381 Ryan H. Honeysett