HomeMy WebLinkAboutP_Utility_Plan_Design_105085310_V2_170712100T
SK00601
316678-166296
25kVA 120/240v
(105074339)108TH AVE SEROL
15
316801-166297
75kVA 120/240v
"10930"
"17033"
70'
ROW
JOB SITE
JOB SITE
7' X 7' WORK PIT
PSE TO INSTALL
±10' OF (2)
#350kCMIL UG TPX
RE-ROUTE (2)
RUNS CUST
OWNED TPX
504676281 105085310
504699285 104292543
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)105085310Owner / Developer Contact Info
officeATTN:
RENTON SPECIAL CARE COMMUNITY LLC
2731 77TH AVE SE
MERCER ISLAND, WA 98040
KEVIN CARL 206-778-4726
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SITE PLAN
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT ONE-LINE DIAGRAM
SCALE: NONE
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES - COMMERCIAL PROJECT
9.
10.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:BRAD ELKIN
425-495-6489
BRADLEY.ELKIN@PSE.COM
N
Vicinity Map
N/A
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
BRAD ELKIN 425-495-6489 06/19/17
BRAD ELKIN 425-495-6489 06/19/17
N/A N/A N/A
JUSTIN HANG 253-508-7880 06/19/17
RIGHTS REVIEW CITY OF RENTON
RENTON SPECIAL CARE COMMUNITY
INSTALL 1Ø SEC HANDHOLE & CONNECT CUST OWNED SVC
17033 108TH AVE SE, RENTON, WA 98055
N/A N/A
N/A 105085310
AS NOTED 1/1
KING N/A N/A CSPSKEIN
T23N, R05E, SEC 29 NW N/A N/A
2305E116 2305E136 2305E116 ROL-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SITE SPECIFIC NOTES
V01 GRID NUMBER 316801-166297:
-EXISTING 75kVA MP TRF TO REMAIN
-RE-ROUTE (2) RUNS CUST SVC TO NEW SEC HH
-INSTALL, LABEL, & CONNECT (2) NEW RUNS #350kCMIL
TPX TO HH
IP1:
-RE-ROUTE 2 CUSTOMER SECONDARY SERVICES TO
NEW HANDHOLE (HH1)
HH1:
-INSTALL 30" X 30" CONCRETE HANDHOLE MID: 9995597
-INSTALL 3 - 6 POS FARGO BARS
-TAG AND CONNECT NEW CUST OWNED TPX RUN
M01:
-INSTALL 1 - 200AMP METER
SPAN SPECIFIC NOTES
V01 - HH1:
,167$//
2)N&0,/8*73;
594114857Misc UG
DEVELOPER CIVIL NOTES:
-REQUIRED TO PROVIDE A 5' X 5' WORK PIT AT NEW VAULT
VAULT HH1.
CUSTOMER SI RESPONSIBLE FOR ALL TRENCHING,
SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND STANDARDS #6750.6500.
DEVELOPER EXCAVATION NOTES:
-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG
FACILITIES 72 HOURS BEFORE CONSTRUCTION.
-REQUIRED TO PROVIDE WORK PITS 72 HOURS BEFORE
CONSTRUCTION.
-ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS
WITH STEEL PLATE 72 HOURS BEFORE CONSTRUCTION.
-EXCAVATION AND CITY OF RENTON INSPECTION MUST BE
COMPLETED 72 HOURS BEFORE CONSTRUCTION.
CONTRACTOR TRENCHING IN CITY OR
COUNTY RIGHT OF WAY NOTES:
PLEASE REVIEW THE CITY OF RENTON TRENCHING
REQUIREMENTS UNDER THE PERMIT.
IF A PRE-CON IS REQUIRED BY THE CITY OR COUNTY, A
PSE PROJECT MANAGER WILL SE A SCHEDULE MEETING
WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR
INSTALLATION BEGINS.
ALL INSPECTIONS ARE REQUIRED BY PSE
IF A SECOND INSPECTION IS REQUIRED ADDITIONAL FEE'S
WILL BE APPLIED
ELECTRICIAN RESPONSIBILITY
-ELECTRICIAN WILL CALL THE DAY THE ELECTRICAL PANEL
HAS BEEN INSPECTED BY CITY OF RENTON.
-ELECTICIAN WILL CALL THE PSE PROJECT MANAGER
BRAD ELKIN, PHONE# 425-495-6489
SINGLE PHASE SECONDARY CONCRETE HANDHOLE
Not to scale 6050.2020-1
EXCAVATION: 5-1/3 CUBIC YARDS
2'-6"2'-6"
Handhole
820 lbs
SIDE VIEW
2'-4"6" Crashed rock
2"
TOP VIEW
5'-0"
5'-0"
Customer-installed grounding wires ( the "4th" wire on the
single-phase systems and the "5th" wire on the three-phase
systems) shall not be connected to PSE's ground or neutral
bus. They shall be removed by customer or cut off at the
vault wall.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
329310.49305
-.49-
329310305
2017
ROL-15
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
N/A.
100AMPS
ELECTRIC
4.3kW
65A
0.1%
0.5%
CIRCUIT FEET ADDED: 0'