HomeMy WebLinkAboutP_Design_105085097_V1_170607SE 165th STS 28th ST 108TH AVE SES 28 th ST ROL 16 NEW HOME 10733 CUSTOMER SUPPLIED 4'X4' WORK PIT INSTALL 4/0 TRIPLEX ± 78' IN CUSTOMER SUPPLIED 3" Sch'l 80 CONDUIT ± 43' CUSTOMER SUPPLIED 3/4 YD SAND CUSTOMER SUPPLIED 4'X4' WORK PITSITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map Owner / Developer Contact Info officeATTN: Skywork Investment PO Box 524 Kirkland WA, 98083 Justin Underwood (425) 346-0780 105085097THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ROL-16 5/6/2016 182 193 183 -1.32 - 182 194.32 183 HP Svc/MSA HP Main Distribution Perm. Service OH Misc Trf Removal Superior ORDER#NOTIF# PWR PROJECT PHASE 104291853504646008 593184230 583056835 105085097504524529 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.ONE LINE DIAGRAM 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Russell Page (360) 245-0192 Russell.Page@pse.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Russell Page (360) 245-0192 5/10/2017 Russell Page (360) 245-0192 5/10/2017 C.Pompeani (253) 234-6435 5/10/2017 N/A City of Renton Renton Single Family Residential Upgrade transformer, Remove temporary service, OH to UG service 10733 SE 165th St Renton, WA 98055 Designed By: PSE 105085097 AS NOTED 1 of 1 King CSPSKEIN 23N 05E 29NW 2305E114 2305E136 2305E114 ROL-16 Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 316895-166288 25kVA 6211250 SCALE: 1" = 50' SCALE: NONE METER DETAIL @ M01 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2688 SQ FT 200 AMPS GAS 9 KW 115 A 2.3% 3.3% CIRCUIT FEET ADDED: 0 FT P01 - REPLACE EXISTING OH 15kVA TRANSFORMER WITH NEW OH 25kVA TRANSFORMER - REPLACE OH FUSE LINK 6T WITH NEW 10T FUSE LINK - INSTALL 3" RISER ON NEW S/O BRACKETS - REMOVE TEMPORARY SERVICE TO "10733" - RECONNECT EXISTING UG SVC TO "10739" SPAN NOTES P01 TO M01 - POTELCO TO INSTALL (1) RUN 4/0 OH to UG TRIPLEX +/- 78' - CUSTOMER TO INSTALL 3" GRAY DISCONTINUOUS SCH'L 80 PVC CONDUIT +/- 43' DEVELOPER CIVIL CONTRACTOR NOTES: ·REQUIRED TO PROVIDE A 4' X 4' PIT AT METER BASE, POLE AND EXISTING PSE FACILITIES. ·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS & TRENCH AT ALL TIMES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS# 6750.6500. ** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. ·IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS ALL INSPECTIONS ARE REQUIRED BY POTELCO INC ·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. MAPS AND RECORDS - P01 316895-166288 IS SERVICING "10739" WITH UG SERVICE Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 316895-166288 15kVA Job Sit e Job SiteTV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 6" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 4" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" MinCL LCDirection of Vehicular Traffic