Loading...
HomeMy WebLinkAboutP_Design_101106016_V1_1707063 J a w D_ J 0 0- 0 DO u, i U 0 0 0 0 0 0 U z 0 Z Z UJ afJ CL x t- 0 N N 0 UD U-1 J O 0- (n J 0- w a w } Z 0 w rr i E r1 0 r7 I r 0 CV r6 c GENERAL SPECIFICATIONS Scope of Work 6-09-17 PER LUKE NEELY CELL 253-569-2523: NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D CORE HOURS, LOCATES, SHORT OUTAGE ON 2 RESIDENTIAL CUSTOMERS PROBLEM: JOE BELCHER WITH PSE INTOLIGHT FOUND THE EXISTING 30'1972 POLE TO BE B/O DUE TO WOODPECKER HOLES AND ROT AT THE GROUND LEVEL ON HIS JOB# 15530 SAP# 105083561. AT P01 AT GRID 317141-165982: REPLACE THE B/O 30'1972 POLE WITH A NEW 35' CL 3 POLE ON THE SOUTH SIDE OF EXISTING POLE. INST RIGID CLEVIS & TRANSFER TWO OH SVCS CENTURYLINK & COMCAST TO TRANSFER. General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. - Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safe - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. OVERHEAD CONSTRUCTION Poles & Structures - Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. - All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. - Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. - Install grid numbers on all new and existing poles as shown on sketch. - Straighten existing poles as indicated or as necessary. - Treat all field -drilled poles with copper napthenate wood preservative. - Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore the area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and transformers above 25 kVA. Install at all sites being worked within the scope of the project where they are currently missing. For 12vK construction, install avian protection with #4 CU -covered jumpers (MID#9998076) and #4 SD Aluminum covered tie -wire (MID#8309760). For 34vK construction use bare wire primary jumpers with pre -formed helical -grip ties and avian protection devices when required per Std. 6015.2000. Jumpers for poles that are double dead ended with tree wire can be either the same size tree wire conductor or covered cu. Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. Use Load -interrupter cutouts (with arc shields) on all primary overheads and underground taps with fused protection above 40T. Install Wildlife Protectors on all transformers. 31x1159-165960 317158-165967 E 519 513 S 20 rH S i 4 �._ SCALE: AS N TED — 317155-165962 c ' 75kVA 1201240v 507 L317147-165973 (105048863) i 2009 317137-165964 T1/7 37.5kVA 1201240v M QO v 317120-165956 i ' T118 / /' ;i 25kVA 1201240v ;' � ! 317119-165959 pi 317114-165966 i r SITE MAP -UNIVERSAL MAP (2305E076 SCALE: 1" = 50' 317158-165973_ T1/6 50kVA 120/240v isi�, 65T X10233 i www 602 S 20TH PL 1994 P01 3171141-165982 U) Lu �I col 317129-165982 (105076184) 15kVA 1201240Y�/i � SLATOO93 I 317120-165982 317114-165982 -- -- 25T k — ----- LINK 1 2' C0 C $T = 25T 1 X ' ..0 -Y F 100T X2297 •1DOT S 75 A - s U275 10 FU915 �... 0 1j... 40T I c� EAR S X5666 N X626 GRA A;oW I IcN I A..Pk ���7 +� oo� 1007 - e otil E 3• 17 �30. GRA 0 1DOT .•� 15 B' ZI X Itor A• 5 FALCON M•' y 30 = e4.30 UG _ 3m PFIILLIP RIDGE 30 c C-4 130 - . U0385 S X10477 25TT� I Oil ARNOLD R F o? •IY 00098 s 14 j I PARK £ $1N 0 9 5 r GRA is X4835 Ic S i¢ EAR T'avi"••........ •• GRA ,.> SUB ;e 405 30 GR • $ 5 15 '.. GRA 16 3 100 756 0 30 'ti.l { s 514 a" 3 30 0 3�.......• .•30 Bi GRA ...... s U050 SUO . o: 30, 3 ,8 :.. A N�t. '1•r'30. 5T 26 :10 U2213 .B ��C .30 W6*i .. 'g :4 1 D3 • 3fb S 02217 s U723 30,,, T77 ggt T ,q�pyJ [TU4900KVAR1�B �' N 407 7 iC B; 1hQ�IC�: 30�X 30: '';BB SK58 0 .30 0261 S ; 257 'x� 1j`�: f 30. 'all C, ,•' C:W 30...? 5T qua OF- o ST GRA 100T o �s - ' .... S ... 1 T 25T I Cpm C 257 I n N�X251 X11262 +.;.•.: D A 25 B&C 30 U2233 s S T78197 i1Y: U2146 �> 5 Int --<AG X B X1055 K % '•. 3p' A :SE•.'s'7fi.: C: 17 s 5t Int I 16 641 •, I,r...., .•C: B: .A•- 1 1 I� ( 6 " rn s� .......... ..... Q^ :. .......... .....: 3 "• ; L3 1C 1 el N� . S'f' �•...X4657 730T77738 : CONO ..eONO LTi 1: :3m 6 :'B:w�m.:A •A,f� .fi5T ...t} :A .0 _ :Q I 11 VINOL 'o C 25 1•ff•`..{... AIBmNb" :rlL� •'4E' .r'.3,w:...........18 O ....1,9• ST S A 19V - =ST 257 OOj30 30•,% I �.....: B.0 .B .{�. T 3946 WORKSITE 5T H6 30 _ X599 3�.....�? 1e30..G. .B' m: :30 MD G ob99B PUCET s1 'B, :A ^: ;B ... we : C 5T l 4 .1• X1055 30 14 ..y' 16 y1 C �. 21 SJ X247 '•B •'c .A •: L.30 A&B . : W Q WNO c, .% :"_qF Z 3 r� . �... g 30 r �I tlp-j� � .�...I L...... �A'. -%-AO OPE 0902 X11067 :25T I..o 25T ':;A v :pe ,G iso . 3TZ...eP4:...A 301 g - dCo I..•: i 8. C :C A S 734 8R94'••Q'� :A 30j 5T 407 • 0869 S: X11068 X11164 TALBOT �1�........•.'`�.,` ..30 AT 30 h OLYMPIC 1 65T : C.' C' 425T Q HILL RENTON i ORE S V: A REM. A B C GRA 62 U460 :30 I6 �e X474......30 y :51: 25 � X752 Ooo 1 X �? 1042 ;....P. B A S 96 30. M.X 1 le X T w t 5 0, w4 '30 VIC Qe C. :A S 30 tour 72 40T 65 /i• .- • n SK746 3UI .515 ST 16f U3250 16 6ST i� A ST N 1 T .i. ; :..; d 25T 1 1 S X11165 t,• '. : x I CO02358 N s I 6 I U354 S X1781 OOT �I.....U6 5 21 �' ..0 U3 y=CTn � e�,s100TT C _ QI ( wsl ipI 3 aC. ;;.•: $ 812655' r� I ml �1 'K Z1 [� Q..: r I IQ QI 1007 � 1 1 e15 C1 U512 S SW 29 Sr ...30 Oy 3fb'•i.�co35393�•.: .6.. g 'Y.�T-S5T r25T 129 STi15T V 3 T I I C U785 S VICTORIA is �..• 30 407 .r . "�' �j BI R X11049 \1 X9698 ,��, 0 WNO�, : 1 1 FLYING ' 1X10 ••30 PARK SUB 15 S 17 :0928 900K3VAR A "•..:'r'`""....I '•...B.. 1007 5T OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP* 2305EO76 — — NEW CONDUCTOR AND OR TRENCH LINE # EXISTING CONDUCTOR TO BE REMOVED Height OR ABANDONED Year NEW POLE O EXISTING POLE % OR 1 DISCONNECT - FUSED OR Q DISCONNECT - UNFUSED NIA OVERHEAD JUMPER CONNECTION GAS Distribution HP Main HP Svc/MSA OVERHEAD TRANSFORMER D ORD CONDUIT RISER N/A STREET LIGHT N/A DOWN GUY ENERGY CUSTOMER DEMAND POINT ❑ PULL VAULT OR SPLICE VAULT ❑J JUNCTION VAULT/JUNCTION BOX QS PADMOUNT SWITCH ® RECLOSER �p PADMOUNT TRANSFORMER ❑❑ TOTAL UNDERGROUND TRANSFORMER Q SECONDARY HANDHOLE LEGEND POLE TABLE (REMOVAL) Site Pole Data # Grid # Height I Class Year I Remarks I Location Ref. P01 317141-1659821 30 1 UNK 1972 1 PSE Equip# POLE TABLE (NEW) Site Pole Data # Grid # Height Class Year Remarks / Location Ref. P01 317141-165982 35 13 2017 PSE Equip# EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKEDISECURED & Work Area left in CLEANISAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED, ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Correct QC Checklists) reviewed. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Perm. Service Relocation Removal TUT Retirement Job Order 11312049 101106016 N/A N/A NIA 583057152 NIA 108101420 N/A N/A NIA NIA GAS Distribution HP Main HP Svc/MSA NIA N/A NIA N/A N/A N/A CABLE TV PHONE Project Manager Contact Information: Manager.: LUKE NEELY Cell Phone: 253.569.2523 E -Mail: luke.neely@pse.com Developer Yes Yes x PSE Vicinity Map NOT TO SCALE THOMAS GUIDE 656-05 T602 Sr*Oth Place G7 1 ✓ y a ei Owner/ Developer Contact Info ATTN: office For contacts below dial 1 -888 -CALL PSE (225-5773) CALL(800)424-5565 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES