Loading...
HomeMy WebLinkAboutA_Application_104293473_V1_170712_1DEPARTMENT OF COMMUNITYCITY of AND ECONOMIC DEVELOPMENT lemon 10 Planning Division 1 1055 South Grady Way, 6'h Floor I Renton, WA 98057 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Puget Sound Energy - Electric MFP17003548 Franchise Job Number: 104293473 Contact Name: Anish Kumar Job Site Address: Description of Work Phone: 253-208-2183 Email: anish.kumar@pse.com 1622 Lake Avenue S 98055 Project Name: Occupying N bound shoulder of Lake Ave S to install new overhead to underground residential electric service from P01 to M01. No hard surface cuts. Please check all that apply: 0 New Construction ❑ Repair/Relocate 0 Underground 0 Overhead 0 Sidewalk 0 Street ❑ Open Trench ❑ Bore # of feet: Contractor Name: Potelco Inc. Phone: 253-208-2183 State Contractors License #: BL005109 City of Renton Business License #: Poteli*227PL "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements. " Digitally signed by Anish Kumar Anish Kumar En gy, ou sh Kumar, o=Puget Sound Energy, ou=Permit @p se -co G 7/12/2017 Signature email=anish.kumar@pse.com, c=U@ Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINEAT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Ho((� Powers 8-10-2017 Plan Review/Development Engineering Date 0 Approved as submitted 8-10-2017 ❑ Pre -Construction Meeting required Site Construction Inspector Date ❑ Approved with comments or redlines ❑ Camera inspection of utilities required Development Engineering Manager Date Page 1 Published: 3/30/2017