Loading...
HomeMy WebLinkAboutP_Utility_Plan_Design_101106162_V1_170726GENERAL SPECIFICATIONS Scope of Work 06/19/2017 PER TARAS MARTINYUK CELL# 425-516-3525 NOTE: CITY OF RENTON PERMIT AND 2 FLAGGERS REQUIRED, CORE HOURS, USE GATE IN FRONT OF PADMOUNT SWITCH WITH PSE PADLOCK FOR ACCESS. LARGE RESIDENTIAL OUTAGE REQUIRED ON APARTMENT COMPLEX NEARBY, RADIAL FEED. 0#379441: BO SWITCH U0497. SERVICEMAN NOTICED ARCING & TRACKING. CUSTOMER: THE PRESERVE AT CEDAR RIVER ASSISTANT MANAGER CASEY 425-430-4600 V01: AT U0497:317355-167287 -USE VAC TRUCK TO DE -WATER & CLEAN THE VAULT -INSTALL EXPANDING PLUGS TO KEEP WATER OUT OF VAULT -REPLACE B/O PMH11 WITH NEW PMH11 (SEE STD 6056.1000, FIG 1,2,3,6, CU ID PMH1115) -REPLACE TERMINATIONS, AS NEEDED -USE FUSE 150E -SWITCH BACK TO NORMAL. SEE O# FOR MORE DETAILS General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. - Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safe - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. UNDERGROUND CONSTRUCTION Excavation - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors or as required by the permitting Agency. - All conductors/conduits shall have a minimum of 3" of bed and 3" of clean sand cover. - No rocks larger than 6" shall be included in backfill. - Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. - If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be installed around the conduits to a depth of six inches above and to the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140. Vaults & Handholes - Refer to PSE standard 6775.0040 "Vault and Handhole Installation" - Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - All "spare" conduits shall be capped at each end. r336.4 \� MC"'ACSR317369-167269 N x7242 E S \ SCALE: AS NOTED `•..�w„ \� 67247 317355-167287 .; `"' S :: - ......... U0497 ( �RFj1l : 49 317356-167287 ; i,......"..........,.., �e(Y�'C 50kVA 1201240v - •. _... 317345-167272 I 317342-167258 h is y 167kVA 1201240v _. --... ........... ..... i I IJJ 3173 5-1 \ , v �— Q 317331-167272 •' r—�- 15205 l 1� 49 40 \ 1 �OrH °A3173114732 317331-167329 ,.,...� _. •••--..... a 100kVA 1201240v .„ _ ............... , _' .......... I -- �,.."..................... L. 1E t 35317324 167287 X6734) r 31 31^ 1J 1G7339 35 i " k0: . .. gr � r r J F ' 317308.167273 ;' (10100577 3149 67320 },'•". ' 317308-167272 623 106kVA 1201240v X•r � r 317311-167317 (10100 779) (101005779) 317302-167291 ii 317297-167308 \ 100T X6769 q0 SITE MAP - UNIVERSAL MAP (2305E086) SCALE: 1" = 50' Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman -Complete LB DC U0497 317355 EXISTING 60' Replace PMH -11 w/ 9 - 750 terms - STREET LIGHT F DOWN GUY 167287 ENERGY CUSTOMER DEMAND POINT NEW PMH -11 PULL VAULT OR SPLICE VAULT QJ JUNCTION VAULT/JUNCTION BOX fl EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) 750 Al XT AO 58673 CO 58675 CO 16970 UATME[:�'Z:1:3 750 Al XT — — — — — — NEW CONDUCTOR AND OR TRENCH LINE EXISTING CONDUCTOR TO BE REMOVED OR ABANDONED • NEW POLE O EXISTING POLE Av OR DISCONNECT - FUSED -� OR Q DISCONNECT - UNFUSED N/A OVERHEAD JUMPER CONNECTION V OVERHEAD TRANSFORMER D ORD CONDUIT RISER N/A STREET LIGHT F DOWN GUY V ENERGY CUSTOMER DEMAND POINT NIA PULL VAULT OR SPLICE VAULT QJ JUNCTION VAULT/JUNCTION BOX fl PADMOUNT SWITCH PHONE PADMOUNT TRANSFORMER �❑ TOTAL UNDERGROUND TRANSFORMER O SECONDARY HANDHOLE LEGEND U0497 PMH11 2 I I I I 3 150E 150E 150E I I I I PWR Superior Perm. Service Relocation Removal Temporary Job Order I 101106162 I N/A N/A I I 108101553 1 4- 1/0 Al XT AO ACE722 BOJ 16977 CO ACE723 CO 16973 1301 16972 AO 16971 750 Al JKT 317355-167287 PMH -11 SWITCH CONNECTION DIAGRAM SCALE: NONE FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKEDISECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Correct QC Checklist(s) reviewed. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Perm. Service Relocation Removal Temporary Job Order 11313125 101106162 N/A N/A N/A NIA N/A 108101553 N/A N/A N/A N/A GAS Distribution HP Main HP Svc/MSA NIA N/A N/A NIA N/A N/A CABLE TV Gas Wk Ctr POWER WK CTR QCSOKE PHONE 714-893-2405 6/20/17 CHECKED BY Project Manager Contact Information: Manager.TARAS MARTINYUK Cell Phone: 425-457-5476 E -Mail., TARA.MARTINYUK@PSE.COM Vicinity Map NOT TO SCALE THOMAS GUIDE 656-H4 Cedar fdv1 r N If Course 4"q, SF TQ81h F 1916 ay/ej,Ra CeC�at r Qom' i y Wa4hl gtun 169 k L i 1 1401 ay Southeast M v The P`r'esel7e t Ak Cedar R.`ver 140rh Way$ Ci Molls:. CWOM hA Owner / Developer Contact Info PUGET SOUND ENERGY ATTN: TARAS MARTINYUK 425-457-5476 office For contacts below dial 1 -888 -CALL PSE (225-5773) CALL (800) 4243665 Developer "Locates Required" "Outages Required" "Flagging Required" Yes Yes PSE 2 BUSINESS DAYS BEFORE YOU DIG No X No X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES Yes x No REAL ESTATE/EASEMENT PERMIT Yes X No N/A RENTON 3 FUNCTION CONTACT PHONENO DATE 2 PROJECT MGR T. MARTINYUK 425-457-5476 6/20/17 1 ENGR - POWER T. MARTINYUK 425-457-5476 6/20/17 REV# DATE BY DESCRIPTION ENGR-GAS COUNTY KING Emer Sect Gas Wk Ctr POWER WK CTR QCSOKE DRAWN BY L. ORTIZ 714-893-2405 6/20/17 CHECKED BY 114 SEC NW22-23N-05E I OP MAP PLAT MAP APPROVED BY ' FOREMAN #1 U -MAP NO (POWER) 2305EO86 OH CKT MAP 2305EO88 UG CKT MAP 2305E 186 CIRCUIT NO FWD -16 FOREMAN #2 IMAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# PUGET FWD -16 140TH AVE SE, RENTON SOUND REPLACE B/0 PMH -11U0497 ( ) ENERGY 140TH AVE SE & MAPLE -VALLEY RD. RENTON, WA 98058FAS DESIGNED BYASPLUNDH CONSTRUCTION CORP. INCIDENT 0-379441 MAOP Gas Order Elect Order 101106162 ALE NOTED PAGE 1/2 317352-167232 167kVA 1201240V COACE725 317331-167221 100kVA 1201240v UNDERGROUND CIRCUIT MAP SCALE: 1" = 50' MAP#: 2305EO86 COACE723 �� 13 1B B ...A .......... .••2..• I C� C �....• w �k1 A. t;L 15 65T?� ...9....i' {.. r l Nt MAPLENVW CE .130 i Ao •'30t « C., d25T; 62365T G6iCF ..� G g 4.., i ..® 25T\ 00T 65T "••' 5491 B\. - - .* � $i 1 OT 1l -18 ^100 q�p�tMOW VCO25 P� 25K 4�R 30 , JJOB SITE D�� 24 113 J MAP N C. X6 Ay . e `'?[[E`y 6735 25T o X6987 ° y� 6g �.. ` ` 30.......... 5T X617 2sr7 x880 FWD �� A,©BRT X545 X46 1s c3s .• 1X11 40TJVy54 ;100 ��J r C: C.: ;A A �F J1• 02 Y C +'B'C A J : }' • #e..:...7N....... • 4 R0L T -re ...r"".AO: 17 r e'.S;�e......•s' X3539 • ,A OPENt Ct.4£ 159 PL 9Y 100T _1111. r f� °p'118 jLy/6p PL it I N, -:A X7389 dCly C� 9 C. A: A IL, (Qj D -i•, X7409 X7390 Z z ``Ab •. •. •. y 0 C00774 L 25Tp ..... 162 ::; • :... Al ;� .. 1!m POO Ay B ©'/� . OVERHEAD CIRCUIT MAP (2305E088 SCALE: 6" = 1 MILE A016968 B016969 C016970 317342-167258 167kVA 1201240V AOACE722 S�R�Nr10rV V01 317355-167287 U0497 6016977 F_ 317356-167287 50kVA 1201240v A016971 6016972 C016973 A058673 6058674 C058675 S�R�NT �NM'�p[F 317331-1 1�THW'IYSF t 100kVA1 Project Manager Contact Information: Manager. TARAS MARTINYUK Cell Phone: 425-457-5476 E -Mail: TARA.MARTINYUK@PSE.COM O O O N For contacts below dial 1 -888 -CALL PSE (225-5773) r-etl /RON d9d_GCAR Developer Yes Yes PSE 2 BUSINESS DAYS BEFORE YOU DIG "Locates Required" No x NO x THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES "Outages Required" Yes x No REAL ESTATE/EASEMENT PERMIT "Flagging Required" Yes x No N/A RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR T. MARTINYUK 425757-5476 6/20/17 1 ENGR - POWER T. MARTINYUK 425-457-5476 6/20/17 REV# DATE BY IDESCRIPTION ENGR - GAS COUNTY Emer Sect Gas Wk Ctr POWER WK CTR DRAWN BY L. ORTIZ 714-893-2405 6/20/17 KING OCSOKE CHECKED BY 114 SEC OP MAP PLAT MAP APPROVED BY NW22-23N-05E FOREMAN #1 U -MAP NI (POWER) OH CKT MAP UG CKT MAP CIRCUIT NO FOREMAN #2 2305EO86 2305E088 23( -086 FWD -16 IMAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# P! //•� SOUND FWD -16 140TH AVE SE, RENTON REPLACE B/O PMH -11 (U0497) INCIDENT 0-379441 Gas Order EENERGN MMAOPUG 1140TH AVE SE & MAPLE -VALLEY RD. RENTON, WA 98058 SCALE YASPLUNDH CONSTRUCTION CORP. AS NOTED