HomeMy WebLinkAboutA_Application_101106511_V1_170726DEPARTMENT OF COMMUNITY tOCITY017 0
AND ECONOMIC DEVELOPMENT
Planning Division 1 1055 South Grady Way, 6th Floor I Renton, WA 98057 1425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published; 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency: Puget Sound Energy - Electric
Franchise Job Number: 101106511
Contact Name: Anish Kumar
Job Site Address:
Phone: 253-208-2183
Email: anish.kumar@pse.com
12301 SE 167th St 98058 Project Name:
Description of work: Occupying E bound shoulder of SE 167th St to replace bad order underground
service, handhole and fargos. No hard surface cuts.
Tease check all that apply:
❑ New Construction IN Repair/Relocate ® Underground ❑ Overhead ❑ Sidewalk N Street
❑ Open Trench ❑ Bore # of feet:
Contractor Name: Potelco Inc. Phone: 253-208-2183
State Contractors License #: BL005109 City of Renton Business License #: Potell*227PL
"I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements."
Signature Date 7/26/2017
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour.
An Pre -construction meetings sha❑ be scneautea at a maximum or 14 days prior to the job start date.
Approved as submitted
Plan Review/Development Engineering Date [:]
Pre -Construction Meeting required
Site Construction Inspector Date
Approved with comments or redlines
F1
Camera inspection of utilities required
Development Engineering Manager Date
Page 1 I Published: 3/30/2017
Print For Reset Form
CITY OF RENTON 00,0tn
TRAFFIC CONTROL PLAN
Amon
PROJECT NAME:
CONSTRUCTION COMPANY: PSE/Potelco Inc.
CONTACT NAME: Luke Neely
ADDRESS: 6905 S 228th St, Kent, WA 98032
E-MAIL ADDRESS: luke.neely@pse.com
PROJECT LOCATION: 12301 SE 167th St
WORK TIME: TBD
WORK DATE: 8/21/2017
Permit Holder agrees to all the following:
PERMIT#
PHONE#:
PHONE#:
CELL#:
FAX#:
253-569-2523
N/E/S/W OF: S of SE 167th
APPROVED BY:
APPROVAL DATE:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney's fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder's agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City's reasonable attorney's fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: Anish Kumar DATE: 7/26/2017
SIGNATURE:
OFFICE COPY T_
CONTRACTOR
DEV. SERVICE, INSPECTION
P. MILLER
DEV, SERVICE, PLAN REVIEW
B. BANNWARTH
POLICE
CHARLES KARLEWICZ
FIRE
FIRE MARSHALL FS 413
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City's PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-2044455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow -away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City's maintenance shop
(3555 NE 2"d Street).
SKETCH
-- NORTH --