Loading...
HomeMy WebLinkAboutP_Utility_Plan_Design_101106511_V1_170726m 3 > to c� O ED J D_ w r-_ I J 0 CID0 0 0 / CD 3 0 / 0 0 U z O z z w H w 0 M N 0 U) O J D - w r I J O K 0 0 O 0 I I I m 0 0 i to U L 0 3 z Z IY w w z 0 z w w rn J a Z O 0 w E a 0 I 0 N GENERAL SPECIFICATIONS Scope of Work 7-07-17 PER LUKE NEELY CELL 253-569-2523: NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D CORE HOURS, LOCATES, OUTAGE ON 3 RESIDENTIAL CUSTOMERS, DIRECTIONAL DRILL 0#383456,375992 PROBLEM: THE UG SVC TO THE CUSTOMER HAS A B/O NEUTRAL IN SEVERAL PLACES. AT HH: REPLACE THE EXIST SEC HH AND FARGOS WITH A NEW 1324 PE HH (HH14350) AND THREE NEW 4 -POS FARGOS PER STD 6050.2000 FIG 3 AND DETAILS F & G. FROM HH TO METER BASE: DIRECTIONAL DRILL ONE 3" RED POLYPIPE CONDUIT APPROX 70 FEET. PULL IN A NEW 4/0 TPLX SVC APPROX 80 FEET CUT AND ABANDON THE OLD UG SVC RESTORE LANDSCAPING S. ST 1 e c R NK716 ww{�r�ai SL— SE ICI ST aor A OT L I T'w.rf. / .�–T-- — ��---C II 162 X00 34 ST 657 /16 !i WI (} 7 \SE 162 ST A '1 n X2304 I� �I W' rW ( SE 163 ST qarI .'�*"� "_LL _ _ a 657 A �� 1P 01 a 1 a l ry� 00 1 6 lie >� 0 �% G 16f T -ST 1 NI aI N1 ! r C> NDI IN NR 0e ;�`��.9 I _ X153-8'� L_c°f p ct ct�X NDS 1 �Jt PQ N ! 251SE 164S 40T I� SE 166 ST t �T 4 100T : C ...... y S£ 164 PL �- I� Ale �WN�s`€r-.z IID•.•. X08 3; 40TSy•. A,B 30 I ......:.::::T . cue Iw JOB SITE a / 7 Be E Q" B.:'y4, .. S`u22o2 C I X7480 40T 12571 \ e1 + : B'WN0• ry ;' J ... . 1698 I� 40 �� �• pm ;i 1 �40T A C C. X10482 i� �_I XS w"��+•—pxo{:8......•C A: X \8 c e ROL • 34 sr 25r fis X6973 l 407 X275 ; 167wP 17 657 ROL �� F.T. 100T A, 100T I C. X7448 q0 25T I5 x35a 4oTX1249 X9206 tial 13151617 C. \ A I ; ;1 6 ,00T SK00356 el 776945 \ I[3� I IB l n of 13 a SE 69 ST '0 SK596 41 y� rot 257 10071 V1 � k I IH0 1 ")IA All NI B A�SEi 169 PL_ 30 A;; B X1.4 SK553 SKssr 1ooT\\-\o�j4lI ei i��`7^SE 170LST I P�t`Y?{ B hlE :B n :•:� _B c \ ir T i r11 I til ,'B �SE 171 PL �IrW 13 1007 SK387 B: 'iH — — — I ♦— — — A _L A,B ` .257 40T A 301 ::., : B WNd C 172 ST I Y—Y—Y—Y— Y—Y�-I, X205 aoT SK598 t%t:.1• X9791•• I 40- 30T C 25 1 11?5T 1o0T I A-- •''. A' ilA SIB B' Itn :C• CC 8 'r b I OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E136 Building Wall Captive L -Bolt Lock -Bolt to final grade \ _ - f q 8 Elec. Mtr 101106511 IT 4' 3' Top View --t'2 Conductors enter ho Gas Meter Zq" beneath and shall bo Relief Vent Min 32" fJ east Typical •'„ To Trench N/A Property Line Electric & Joint Utility Work Pit Dimensions Service (Permanent Detail) Not to Scale 36" /Min , Elec. Mtr Base Elec Mtr utility provided Regulator Vent 3" Conduit Service Riser Customer Provided Gas Meter Assembly' / Utility Provided /� • •/ Drainage Pipe o Minimum Clearance from Gas Service Lines 4'8" METER BASE DETAIL NOT TO SCALE 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided )12, N SCALE: AS NOTED I (12 16639 4) 11 488) i ST NO 40T 112 316817-166745 25kVA 1201240v 16632 ZQ �L SLAG4114 16640 12121 I 12127 I 12201 12118 12200 12212 A316789-166749 / 25kVA 1201240V Q / 66T UN SITE MAP - UNIVERSAL MAP (2305E11 SCALE: 1" = 50' 16621 12206 12214 SLAG4107 SE 167TH ST 16620 316807-166761 (HH)„ 37.5kVA 120/240v r„ \ 12207 12213 12301 (1) 3" RED POLYPIPE, L = 70' 410 TPLX SVC, L = 80' 12220 316789-166765 25kVA 1201240v 12300 316788-166775 65T UNK 12304 12308 12305 16627 ;- �':' 316826-166806 `•� 37.5kVA 120/240v 12320 / rr 16632 316809-166792 37.6kVA 120124 12316 316788-166788 �et.ve A911YlAfl., 12309 12313 12324 SLAG4 12325 12321 `k*lift 12402 12410 /316787-166800 65T 316788-16681 BOABDO55 Af1iABD052 \� CO Q N H Z �I'7 � G M U) 316B31-166745 m 37.5kVA 1201240v ❑ 316826-166806 37.6kVA 1201240v BOABDO56 98 D057 AOABDO58 316'17-166745 26kVA 120124Dv 67TH STO AOABDO60 SE 167TH ST 316809-166792 37.6kVA 120/240V A0ABD060 316807-166761 \ AOABDO58 37.5kVA 1201240v UNDERGROUND CIRCUIT MAP SCALE: 1" = 50' MAP#: 2305E110 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) Set handhcle flush Captive L -Bolt Lock -Bolt to final grade \ PWR Superior Perm. Service Relocation Removal Temporary Job Order 11317194 101106511 N/A N/A N/A Conductors enter ho N/A "• % beneath and shall bo N/A 24" Min folded back within handhole. fJ east 24"-36.. •'„ 36" Typical N/A N/A CABLE TV Gas Wk Ctr 48„ :. 714-893-2405 7/11117 Sa�kn Cloud 114 SEC NW28-23N-05E • • PLAT MAP 24"-36" 953 60 1FOREMAN#1 U -MAP NO (POWER) 2305E110 OH CKT MAP 1 2305E136 UG CKT MAP 2305EI 10 CIRCUIT NO ROL-17 1FOREMAN#2 Conduit Depth IMAPPING JOINT FACILITIES ARRANGEMENTS 24" to 36" Max UTILITIES -• •- Gas Service Line Conduit „ " " „ " Conduit Stakes Sch 40 White PVC Customer Provided Customer Provided METER BASE DETAIL NOT TO SCALE 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided )12, N SCALE: AS NOTED I (12 16639 4) 11 488) i ST NO 40T 112 316817-166745 25kVA 1201240v 16632 ZQ �L SLAG4114 16640 12121 I 12127 I 12201 12118 12200 12212 A316789-166749 / 25kVA 1201240V Q / 66T UN SITE MAP - UNIVERSAL MAP (2305E11 SCALE: 1" = 50' 16621 12206 12214 SLAG4107 SE 167TH ST 16620 316807-166761 (HH)„ 37.5kVA 120/240v r„ \ 12207 12213 12301 (1) 3" RED POLYPIPE, L = 70' 410 TPLX SVC, L = 80' 12220 316789-166765 25kVA 1201240v 12300 316788-166775 65T UNK 12304 12308 12305 16627 ;- �':' 316826-166806 `•� 37.5kVA 120/240v 12320 / rr 16632 316809-166792 37.6kVA 120124 12316 316788-166788 �et.ve A911YlAfl., 12309 12313 12324 SLAG4 12325 12321 `k*lift 12402 12410 /316787-166800 65T 316788-16681 BOABDO55 Af1iABD052 \� CO Q N H Z �I'7 � G M U) 316B31-166745 m 37.5kVA 1201240v ❑ 316826-166806 37.6kVA 1201240v BOABDO56 98 D057 AOABDO58 316'17-166745 26kVA 120124Dv 67TH STO AOABDO60 SE 167TH ST 316809-166792 37.6kVA 120/240V A0ABD060 316807-166761 \ AOABDO58 37.5kVA 1201240v UNDERGROUND CIRCUIT MAP SCALE: 1" = 50' MAP#: 2305E110 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) Set handhcle flush Captive L -Bolt Lock -Bolt to final grade \ PWR Superior Perm. Service Relocation Removal Temporary Job Order 11317194 101106511 N/A N/A N/A Conductors enter ho N/A "• % beneath and shall bo N/A NIA folded back within handhole. fJ NIA N/A N/A N/A N/A N/A CABLE TV Gas Wk Ctr POWER WK CTR QCSOKE 6" Crushed Re�yy: 714-893-2405 7/11117 Sa�kn ��, t 6) 114 SEC NW28-23N-05E OF MAP Detail G 1324 Handhole (Side View) SINGLE-PHASE SECONDARY HANDHOLE NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate oomect FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Correct QC Checklist(s) reviewed. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Perm. Service Relocation Removal Temporary Job Order 11317194 101106511 N/A N/A N/A N/A N/A 108101902 N/A N/A NIA N/A GAS Distribution HP Main HP Svc/MSA NIA N/A N/A N/A N/A N/A CABLE TV Gas Wk Ctr POWER WK CTR QCSOKE PHONE 714-893-2405 7/11117 CHECKED BY Project Manager Contact Information: Manager: LUKE NEELY Ce/1 Phone: 253-569-2523 E-mail. LUKE.NEELY@PSE.COM STD. 60502000 Customers Service Conductor 7 Vicinity Map THOMAS GUIDE NOT TO SCALE 656-F6 N P N S1 \ s SE 167th St / SE 167th St i' tirar .r Owner/ Developer Contact Info ATTN: office For contacts below dial 1 -888 -CALL PSE (225-5773) CALL 180054243566 _ Developer "Locates Required" "Outages Required" "Flagging Required" Yes Yes x PSE 2 BUSINESS DAYS BEFORE YOU DIG No X NO THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES Yes x No REAL ESTATEIEASEMENT PERMIT Yes x No N/A RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR L. NEELY 253-569-2523 7/11/17 1 ENGR-POWER L. NEELY 253-569-2523 7/11/17 REV# DATE BY DESCRIPTION ENGR - GAS COUNTY KING Emer Sect Gas Wk Ctr POWER WK CTR QCSOKE DRAWN BY L. ORTIZ 714-893-2405 7/11117 CHECKED BY 114 SEC NW28-23N-05E OF MAP PLAT MAP APPROVED BY 953 60 1FOREMAN#1 U -MAP NO (POWER) 2305E110 OH CKT MAP 1 2305E136 UG CKT MAP 2305EI 10 CIRCUIT NO ROL-17 1FOREMAN#2 IMAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# PUGC,1T ROL-17 / 12301 SE 167TH ST, RENTON SOUND REPLACE B/O UG SVC ENERGY 12301 SE 167TH ST. RENTON, WA 98058 DESIGNED BY ASPLUNDH CONSTRUCTION CORP. INCIDENTMAOP 0-383456 Gas Order Elect Order 101106511 SCALE PAGE AS NOTED 1!1