HomeMy WebLinkAboutP_Utility_Plan_Design_101106213_V1_170726318388-166970 25kVA 120/240v D/R "3604" PRE 11PIERCE AVE NEJOB SITE JOB SITE CUSTOMER TO INSTALL ±135' OF 1-3" SCH'L 80 GRAY PVC CONDUIT. PSE TO INSTALL ±180' OF (1) 4/0 UG TPX. 4' X 4' WORK PIT 4' X 4' WORK PIT 3/4 CUBIC YARD OF SAND 504755250 101106213 PROJECT PHASE PWR NOTIF#ORDER# Superior THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101106213Owner / Developer Contact Info officeATTN: CIOCANAS MARIA 3604 NE 8TH RENTON, WA 98056 FARKAS TIBERIU 425-266-1839 N Vicinity Map N/A FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CUSTOMER-SUPPLIED SERVICE TRENCH ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:RUSSELL PAGE 253-245-0192 RUSSEL.PAGE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP RUSSELL PAGE 253-245-0192 06/09/17 RUSSELL PAGE 253-245-0192 06/09/17 N/A N/A N/A JUSTIN HANG 253-508-7880 06/09/17 N/A CITY OF RENTON NEW CONSTRUCTION OH-UG PERMANENT SERVICE CONVERSION 3604 NE 8TH ST, RENTON, WA 98056 N/A N/A N/A 101106213 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SEC 09 NW N/A N/A 2305E033 2305E040 2305E033 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SCALE: 1" = 50' SITE SPECIFIC NOTES P01 GRID NUMBER 318388-166970: -EXISTING DISTRIBUTION POLE TO REMAIN -REMOVE EXISTING OH SVC "3604" -INSTALL 1 - 3" CONDUIT RISER ON NEW S/O BRACKET M01: -TRANSFER EXISTING 1 - 200AMP METER SPAN SPECIFIC NOTES P01-M01: &86720(572,167$//“ 2)6&+ /*5$<39& CONDUIT 36(72,167$//“ 2)  8*73; CUSTOMER DEVELOPMENT NOTES CUSTOMER IS RESPONSIBLE OR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS #6750.6500. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** -REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01. -REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 CUBIC YARD OF SAND AT M01. -REQUIRED TO PROVIDE & INSTALL A 3/8" NON-POLY PULL ROPE IN ALL CONDUITS. -CUSTOMER IS REQUIRED TO INSTALL METER BASE ON FRONT 1/3 OF BUILDING. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL. ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTUCTION. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2000 SQ. 200AMPS ELECTRIC 14KW 80A 4.3% 3.0% CIRCUIT FEET ADDED: 0' TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. Climbing Space Road Face Quadrant Climbing Space L LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE 197.04184234 2.04-- 195184234 2016 PRE-11 108101627Removal Standoff Bracket 15" Min Length Conduit Clamp Conduit 5" Min C Climbing Space