HomeMy WebLinkAboutP_Utility_Plan_Design_101106213_V1_170726318388-166970
25kVA 120/240v
D/R
"3604"
PRE
11PIERCE AVE NEJOB SITE
JOB SITE
CUSTOMER TO INSTALL ±135'
OF 1-3" SCH'L 80 GRAY PVC
CONDUIT.
PSE TO INSTALL ±180' OF (1)
4/0 UG TPX.
4' X 4'
WORK PIT
4' X 4'
WORK PIT
3/4 CUBIC
YARD OF SAND
504755250 101106213
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101106213Owner / Developer Contact Info
officeATTN:
CIOCANAS MARIA
3604 NE 8TH
RENTON, WA 98056
FARKAS TIBERIU 425-266-1839
N
Vicinity Map
N/A
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER-SUPPLIED SERVICE TRENCH
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
253-245-0192
RUSSEL.PAGE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
RUSSELL PAGE 253-245-0192 06/09/17
RUSSELL PAGE 253-245-0192 06/09/17
N/A N/A N/A
JUSTIN HANG 253-508-7880 06/09/17
N/A CITY OF RENTON
NEW CONSTRUCTION
OH-UG PERMANENT SERVICE CONVERSION
3604 NE 8TH ST, RENTON, WA 98056
N/A N/A
N/A 101106213
AS NOTED 1/1
KING N/A N/A CSPSKEIN
T23N, R05E, SEC 09 NW N/A N/A
2305E033 2305E040 2305E033 PRE-11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SCALE: 1" = 50'
SITE SPECIFIC NOTES
P01 GRID NUMBER 318388-166970:
-EXISTING DISTRIBUTION POLE TO REMAIN
-REMOVE EXISTING OH SVC "3604"
-INSTALL 1 - 3" CONDUIT RISER ON NEW S/O BRACKET
M01:
-TRANSFER EXISTING 1 - 200AMP METER
SPAN SPECIFIC NOTES
P01-M01:
&86720(572,167$//
2)6&+
/*5$<39&
CONDUIT
36(72,167$//
2)8*73;
CUSTOMER DEVELOPMENT NOTES
CUSTOMER IS RESPONSIBLE OR ALL TRENCHING, SELECT
BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS #6750.6500.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS
ON SELECT BACKFILL**
-REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01.
-REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 CUBIC
YARD OF SAND AT M01.
-REQUIRED TO PROVIDE & INSTALL A 3/8" NON-POLY PULL
ROPE IN ALL CONDUITS.
-CUSTOMER IS REQUIRED TO INSTALL METER BASE ON
FRONT 1/3 OF BUILDING.
ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE
BEFORE FINAL BACKFILL.
ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED
72HRS BEFORE CONSTUCTION.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
2000 SQ.
200AMPS
ELECTRIC
14KW
80A
4.3%
3.0%
CIRCUIT FEET ADDED: 0'
TV & TEL Electric Service Cable in Conduit
3" Schedule 80 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
Climbing
Space
Road Face
Quadrant
Climbing
Space
L LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
197.04184234
2.04--
195184234
2016
PRE-11
108101627Removal
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
5" Min
C
Climbing