Loading...
HomeMy WebLinkAboutMFP17003761DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17003761 IVR Number: 17003761  Permit InformaƟon Permit Name:Puget Sound Energy ‐ Electric Address/LocaƟon:08/10/2017ApplicaƟon Date:9476200140Parcel Number:510 GRANDEY WAY  NE Permit Type:08/25/2017Issue Date:Franchise Permit Work  Class:08/25/2018ExpiraƟon Date:Minor UƟlity Job Number:#594115720Franchise Type:Electric DescripƟon:Follow up permit for emergency work complete on 7/29/2017. Crew repaired short at B/O cable 30012 at grid 318197 166492. Crew replaced with h/coil 1/0 cable. No hard surface cuts.  Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY ‐ ELECTRIC ‐ BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208‐2183ApplicantX VICKI HENSON POTELCO INC 8001 212th St S Kent, WA 98032 B: (253) 863‐0484Contractor Business License Number: BL.005109Electrical Contractor: POTELI*344O4 ConstrucƟon Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA  98057‐3232 Owner  General CondiƟons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.  This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements.  Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way.  Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010 ) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.  (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT  THE JOB SITE AT  ALL TIMES MFP17003761 Holly Powers Justin Johnson 8-25-2017 8-25-2017 MFP17003761