HomeMy WebLinkAboutP_Drawing_105085669_V1_170810A B
10"FUSE @ 40T
SW#T79023
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)105085669Owner / Developer Contact Info
officeATTN:
KUSHAL VARMA
10906 144TH AVE SE
RENTON, WA 98059
KUSHAL VARMA (206) 353-3168
N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. PAGE (253) 234-6444 -
R. PAGE (253) 234-6444 -
T. MYER (714) 893-2405 07/11/17
R/W REQ KING COUNTY
VARMA RESIDENCE
NEW 320A REMOTE TEMP SERVICE
13010 156TH AVE SE, RENTON, WA 98059
ASPLUNDH CONSTRUCTION CORP.
N/A N/A
N/A 105085669
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
NE 14-23N-05E N/A N/A
2305E053 2306E076 MAP-13
2305E053
504686152 105085669
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
SITE MAP
SCALE: 1" = 50'
CIRCUIT FEET ADDED: 345'
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Schedule 40 Grey PVC
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
SQ. FOOTAGE: 4,224 SQ FT
PANEL SIZE: 320A
HEAT TYPE: GAS
EST. DEMAND: 16KW
LRC: 140A
% V. DROP: 1.6%
% FLICKER: 3.9%
JOB SITE
PARCEL #
3664500184
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
V01
317996-167938
37.5kVA
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
SCALE: NONE
METER DETAIL @ M01
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-13
06.08.17
49 8 32
2
49 10 32
SITE SPECIFIC NOTES
P01: 317998-167911
,167$//35,7(50 /%&2)86(#77$3%
-INSTALL 2" CONDUIT RISER ON S/O BRACKETS (RIS2CSS) PER STD 6042.1000
-INSTALL CABLE TAG
-INSTALL SWITCH #T79023
V01: 317996-167938
,167$//´;´;´03++ *5'6
-INSTALL 37.5KVA 1PH 120/240V TRF
-INSTALL 1-12KV L/B ELBOW
-INSTALL SEC. CONNECTORS
,167$//&$%/(%(+0
-INSTALL GRID #317996-167938
M01: NEW REMOTE TEMP METER
-INSTALL 320A METER
CUSTOMER & DEVELOPER NOTES
THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
5(48,5('72&86720(5723$<)25'(',&$7(')$&,/,7,(6
6((7$%/(
5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
5(48,5('723529,'(¶;¶:25.3,79
5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$70
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-KING COUNTY INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION
-CUSTOMER TO CONTACT CUSTOMER CARE SERVICE (1-888-321-7779) WHEN READY FOR PERMANENT SERVICE
OVERHEAD CIRCUIT MAP 2306E076
SCALE: 6" = 1 MILE
JOB SITE
SPAN SPECIFIC NOTES
P01 TO V01:
,167$//581$/-.7¶
,167$//'%&21'8,7
&86720(5723$<)25'(',&$7(')$&,/,7,(6
V01 TO M01:
&86720(572,167$//5810&08*73;
¶
&86720(572,167$//',6&217,18286*5(<6&+
/&21'8,7
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
(253) 234-6444
RUSSELL.PAGE@PSE.COM
90°
9.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES - RESIDENTIAL PROJECT
TOP VIEW
Standoff Bracket
15" Min Length
Conduit Clamp
ConduitField FaceQuadrantClimbing
Space
Road FaceQuadrantClimbing
Space
5
"
M
i
n CLLCDirection of Vehicular TrafficUNDERGROUND
CABLE CONDUITS
TO THIS QUADRANT
CUSTOMER-CONDUIT & RISER LOC. DETAIL
SCALE: NONE
DEDICATED FACILITIES (105085669)
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
-A B 275 DED. CONDUIT 2-36
TOTAL FT=275
Remote Temp Svc 504760102 104293474
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 317996-
167938
36"x42"x38"
MP HH
Matid: 7662110
37.5KVA PM TRF
120/240
Matid: 6247050
1 1
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE AS BUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE
P01 V01 2 1 350'1 1 --145 290 1/0 AL JKT 380'EHM632 -
2" PVC (FT) & BENDS =350'1 1 0 0 1/0 AL JKT TOTAL (FT) =380'
Phone & TV Primary Power Cable
Direct Buried or in PSE provided
Excavated Dirt Pile
Final Grade
24" Min
48"
Max
18"
Backfill for DB 120 Conduit/Direct Buried Cable
4" Min
Separation
6" or 12" of sand, 5/8" minus
3" of sand, 5/8" minus, or clean backfill bedding
JOINT TRENCH DETAIL
36"
Min
Cover
ROADSIDE
Typical To Excavated Dirt Pile
(No Rocks over 10" Diameter)
or clean backfill shading
DB120 Grade Conduit
Primary-Direct Buried or DB 120 (NTS)
- A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material
contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material
contains rocks up to 10" in diameter.
4' X 4' WORK PIT &
3/4" CUBIC YARD SAND
CUSTOMER SUPPLIED
CUSTOMER SUPPLIED
6&+('
/',6&217,1828639&&21'8,7
INST. 1-RUN 350 UG TPX & 10' OF 4/0 ± 220'
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
1 CUBIC YARD 5/8" CRUSHED ROCK
90°CUSTOMER TO PAY FOR DEDICATED FACILITIES ± 256'
35,0$5<'%&21'8,7
INST. 1-RUN 1/0 AL JKT ± 380'
CUSTOMER SUPPLIED
6' X 6' WORK PIT
TOP VIEW
SIDE VIEW
EXCAVATION: 4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
VAULT & EXCAVATION DETAIL
Not to scale 6045.1000
1950 lbs
40T