HomeMy WebLinkAboutMFP17004150DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17004150
IVR Number: 17004150
Permit InformaƟon
Permit Name:Puget Sound Energy ‐ Electric
Address/LocaƟon:09/05/2017ApplicaƟon Date:8011100077Parcel Number:3303 NE 7TH ST
Permit Type:09/08/2017Issue Date:Franchise
Permit Work Class:09/08/2018ExpiraƟon Date:Minor UƟlity
Job Number:104294965Franchise Type:Electric
DescripƟon:INSTALL EQUIPMENT AT POLE P01, TRENCH AND INSTALL CONDUIT TO SERVE PROPERTY. HARD SURFACE CUT
ANTICIPATED. RESTORATION PER CITY OF RENTON STANDARDS .
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY ‐ ELECTRIC ‐ BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208‐2183Applicant
VICKI HENSON
POTELCO INC
8001 212th St S
Kent, WA 98032
B: (253) 863‐0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
ConstrucƟon Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057‐3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY ‐ ELECTRIC ‐ BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208‐2183Specialized
Billing
X
General CondiƟons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for AN
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
104294965
Anish Kumar
253-208-2183
anish.kumar@pse.com
3303 NE 7th St
Occupying E bound shoulder of NE 7th St to install PSE equipment at pole P01,
trench and install conduit for overhead to underground service installation to property 3303.
Hard surface cut anticipated for trench.
23'
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
8/21/2017
MFP17004150
BERNASCONI SFR
Restoration per City of Renton Standards
Scott Warlick
Justin Johnson
9-8-2017
9-8-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
3303 NE NEW SINGLE FAMILY
PSE/Potelco Inc.
Dave Goodale 425-495-7049
6905 S 228th St, Kent, WA 98032
david.goodale@pse.com
3303 NE 7th St
TBD
9/11/2017
Anish Kumar 8/21/2017
BERNASCONI SFR
MFP17004150
Justin Johnson
9-8-2017
8:00 AM to 3:00 PM
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
1212 21211717MONROE AVE NE BUSSTOPBUSSTOPMONROE AVE NENE 7TH STNE 7TH ST 11 11 11 10varNEWPORT CT NE1212
OLYMPIA AVE NE99NE 7TH ST1414BUSSTOPP01#3303M02M01UTILITYWORKAHEADW21-7 100'200'SHOULDERWORKW21-5UTILITY
WORK
AHEAD W21-7100'UTILITYWORKAHEADW21-7200'100'MOVE BUS STOP 50'-100 EAST#3307FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGJob#104294965 3303 NE 7th St, Renton, WAAugust 19, 2017Sheet 1 of 1 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYLEGEND28" TRAFFIC CONEWORK VEHICLESIGN LOCATIONWARNING FLAGTRAFFIC FLOWPOLENotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425MFP17004150
110'
4' X 4'
WORK PIT
4' X 4'
WORK PIT
-CUSTOMER TO INSTALL ±110'
OF 1-3" SCH'L 80 CONDUIT
-INSTALL ±140' OF 350KCMIL W/
4/0 UG TPX TAIL AT A LATER
DATE FOR PERM SVC
3/4 YARD
OF SAND
NE 7TH ST
"3303""3307"
NEW
"3303"
318343-166889
25kVA 120/240v
60'
OH
TRESPASS
EXISTING
"3307"
JOB SITE
JOB SITE
GAS
PHONE
CABLE TV
504870521 593945522
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Overhead Temp
Owner / Developer Contact Info
officeATTN:
JOE BERNASCONI
PO BOX 1343
RENTON, WA 98057
JOE BERNASCONI 253-740-2119
N
Vicinity Map
N/A
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
ONE-LINE DIAGRAM
SCALE: NONE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER-SUPPLIED SERVICE TRENCH
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVID GOODALE
425-495-7049
DAVID.GOODALE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'104294965THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
104294965
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DAVID GOODALE 425-495-7049 08/09/17
DAVID GOODALE 425-495-7049 08/09/17
N/A N/A N/A
TIN NGUYEN 253-244-4303 08/09/17
N/A - FOR OH TEMP POWER CITY OF RENTON REQ.
3303 NE NEW SINGLE FAMILY
INSTALL OH TEMP AND OH/ UG PERMANENT SERVICE
3303 NE 7TH ST, RENTON, WA 98056
N/A N/A
N/A 104294965
N/A 1/1
KING N/A N/A CSPSKEIN
T23N, R05E, SEC 09 SE N/A N/A
2305E036 2305E040 2305E036 PRE-11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
504191829
SITE SPECIFIC NOTES
P01 GRID# 318343-166889:
-EXISTING DISTRIBUTION POLE & EQUIPMENT TO
REMAIN
-INSTALL 1-3" CONDUIT RISER ON EXISTING S/O
BRACKET FOR PERM SVC ONLY
M01:
-INSTALL 1-200AMP TEMP METER
M02:
-PSE TO TRANSFER AND INSTALL 1-200AMP
PERMANENT METER WHEN CUSTOMER IS READY
FOR PERMANENT SERVICE
SITE SPECIFIC NOTES
P01-M01:
-PSE TO INSTALL ±70' OF 1/0 OH TPX
P01-M02:
-INSTALL ±110' OF 350KCMIL W/ 4/0 UG TAIL AT A
LATER DATE FOR PERM SVC
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Schedule 80 Grey PVC
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-11
2017
92 99 154
-1.46 -
92 100.46 154
CUSTOMER DEVELOPMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING,
SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS.#6750.6500
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH
DETAILS ON SELECT BACKFILL**
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK
PIT AT P01.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK
PIT & 3/4 YARD OF SAND AT M02.
-CUSTOMER TO INSTALL
OF 1-3" SCH'L 80 GRAY
PVC CONDUIT FROM P01-M02.
-CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A
3/8" NON-POLY PULL ROPE IN CONDUIT.
-CUSTOMER MUST HAVE A COPY OF PSE PROVIDED
PERMIT ON SITE DURING ANY DIGGING IN RIGHT OF
WAY.
-CUSTOMER IS REQUIRED TO INSTALL METER BASE ON
FRONT 1/3 OF BUILDING.
ALL TRENCHING WILL REQUIRE AN INSPECTION BY
PSE BEFORE FINAL BACKFILL
ALL TRENCH AND L&I INSPECTION MUST BE
COMPLETED 72HRS BEFORE CONSTRUCTION
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3,263 SQ.
200 AMPS
GAS
10 KW
115 A
2.0%
3.5%
CIRCUIT FEET ADDED: 0'593945522Temp Order
593945522
Email: JoeB@Windermere.com
MFP17004150