HomeMy WebLinkAboutP_Design_104294965_V1_170821110'
4' X 4'
WORK PIT
4' X 4'
WORK PIT
-CUSTOMER TO INSTALL ±110'
OF 1-3" SCH'L 80 CONDUIT
-INSTALL ±140' OF 350KCMIL W/
4/0 UG TPX TAIL AT A LATER
DATE FOR PERM SVC
3/4 YARD
OF SAND
NE 7TH ST
"3303""3307"
NEW
"3303"
318343-166889
25kVA 120/240v
60'
OH
TRESPASS
EXISTING
"3307"
JOB SITE
JOB SITE
GAS
PHONE
CABLE TV
504870521 593945522
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Overhead Temp
Owner / Developer Contact Info
officeATTN:
JOE BERNASCONI
PO BOX 1343
RENTON, WA 98057
JOE BERNASCONI 253-740-2119
N
Vicinity Map
N/A
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
ONE-LINE DIAGRAM
SCALE: NONE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER-SUPPLIED SERVICE TRENCH
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVID GOODALE
425-495-7049
DAVID.GOODALE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'104294965THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
104294965
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DAVID GOODALE 425-495-7049 08/09/17
DAVID GOODALE 425-495-7049 08/09/17
N/A N/A N/A
TIN NGUYEN 253-244-4303 08/09/17
N/A - FOR OH TEMP POWER CITY OF RENTON REQ.
3303 NE NEW SINGLE FAMILY
INSTALL OH TEMP AND OH/ UG PERMANENT SERVICE
3303 NE 7TH ST, RENTON, WA 98056
N/A N/A
N/A 104294965
N/A 1/1
KING N/A N/A CSPSKEIN
T23N, R05E, SEC 09 SE N/A N/A
2305E036 2305E040 2305E036 PRE-11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
504191829
SITE SPECIFIC NOTES
P01 GRID# 318343-166889:
-EXISTING DISTRIBUTION POLE & EQUIPMENT TO
REMAIN
-INSTALL 1-3" CONDUIT RISER ON EXISTING S/O
BRACKET FOR PERM SVC ONLY
M01:
-INSTALL 1-200AMP TEMP METER
M02:
-PSE TO TRANSFER AND INSTALL 1-200AMP
PERMANENT METER WHEN CUSTOMER IS READY
FOR PERMANENT SERVICE
SITE SPECIFIC NOTES
P01-M01:
-PSE TO INSTALL ±70' OF 1/0 OH TPX
P01-M02:
-INSTALL ±110' OF 350KCMIL W/ 4/0 UG TAIL AT A
LATER DATE FOR PERM SVC
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Schedule 80 Grey PVC
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-11
2017
92 99 154
-1.46 -
92 100.46 154
CUSTOMER DEVELOPMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING,
SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS.#6750.6500
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH
DETAILS ON SELECT BACKFILL**
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK
PIT AT P01.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK
PIT & 3/4 YARD OF SAND AT M02.
-CUSTOMER TO INSTALL
OF 1-3" SCH'L 80 GRAY
PVC CONDUIT FROM P01-M02.
-CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A
3/8" NON-POLY PULL ROPE IN CONDUIT.
-CUSTOMER MUST HAVE A COPY OF PSE PROVIDED
PERMIT ON SITE DURING ANY DIGGING IN RIGHT OF
WAY.
-CUSTOMER IS REQUIRED TO INSTALL METER BASE ON
FRONT 1/3 OF BUILDING.
ALL TRENCHING WILL REQUIRE AN INSPECTION BY
PSE BEFORE FINAL BACKFILL
ALL TRENCH AND L&I INSPECTION MUST BE
COMPLETED 72HRS BEFORE CONSTRUCTION
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3,263 SQ.
200 AMPS
GAS
10 KW
115 A
2.0%
3.5%
CIRCUIT FEET ADDED: 0'593945522Temp Order
593945522
Email: JoeB@Windermere.com