Loading...
HomeMy WebLinkAboutP_Design_104294965_V1_170821110' 4' X 4' WORK PIT 4' X 4' WORK PIT -CUSTOMER TO INSTALL ±110' OF 1-3" SCH'L 80 CONDUIT -INSTALL ±140' OF 350KCMIL W/ 4/0 UG TPX TAIL AT A LATER DATE FOR PERM SVC 3/4 YARD OF SAND NE 7TH ST "3303""3307" NEW "3303" 318343-166889 25kVA 120/240v 60' OH TRESPASS EXISTING "3307" JOB SITE JOB SITE GAS PHONE CABLE TV 504870521 593945522 PROJECT PHASE PWR NOTIF#ORDER# Superior Overhead Temp Owner / Developer Contact Info officeATTN: JOE BERNASCONI PO BOX 1343 RENTON, WA 98057 JOE BERNASCONI 253-740-2119 N Vicinity Map N/A FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. ONE-LINE DIAGRAM SCALE: NONE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CUSTOMER-SUPPLIED SERVICE TRENCH ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVID GOODALE 425-495-7049 DAVID.GOODALE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50'104294965THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 104294965 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAVID GOODALE 425-495-7049 08/09/17 DAVID GOODALE 425-495-7049 08/09/17 N/A N/A N/A TIN NGUYEN 253-244-4303 08/09/17 N/A - FOR OH TEMP POWER CITY OF RENTON REQ. 3303 NE NEW SINGLE FAMILY INSTALL OH TEMP AND OH/ UG PERMANENT SERVICE 3303 NE 7TH ST, RENTON, WA 98056 N/A N/A N/A 104294965 N/A 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SEC 09 SE N/A N/A 2305E036 2305E040 2305E036 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 504191829 SITE SPECIFIC NOTES P01 GRID# 318343-166889: -EXISTING DISTRIBUTION POLE & EQUIPMENT TO REMAIN -INSTALL 1-3" CONDUIT RISER ON EXISTING S/O BRACKET FOR PERM SVC ONLY M01: -INSTALL 1-200AMP TEMP METER M02: -PSE TO TRANSFER AND INSTALL 1-200AMP PERMANENT METER WHEN CUSTOMER IS READY FOR PERMANENT SERVICE SITE SPECIFIC NOTES P01-M01: -PSE TO INSTALL ±70' OF 1/0 OH TPX P01-M02: -INSTALL ±110' OF 350KCMIL W/ 4/0 UG TAIL AT A LATER DATE FOR PERM SVC TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 80 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-11 2017 92 99 154 -1.46 - 92 100.46 154 CUSTOMER DEVELOPMENT NOTES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS.#6750.6500 **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M02. -CUSTOMER TO INSTALL “ OF 1-3" SCH'L 80 GRAY PVC CONDUIT FROM P01-M02. -CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN CONDUIT. -CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE DURING ANY DIGGING IN RIGHT OF WAY. -CUSTOMER IS REQUIRED TO INSTALL METER BASE ON FRONT 1/3 OF BUILDING. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTRUCTION Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3,263 SQ. 200 AMPS GAS 10 KW 115 A 2.0% 3.5% CIRCUIT FEET ADDED: 0'593945522Temp Order 593945522 Email: JoeB@Windermere.com