HomeMy WebLinkAboutMFP17004152DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17004152
IVR Number: 17004152
Permit InformaƟon
Permit Name:Puget Sound Energy ‐ Electric
Address/LocaƟon:09/05/2017ApplicaƟon Date:2923059038Parcel Number:16826 108TH AVE SE
Permit Type:09/08/2017Issue Date:Franchise
Permit Work Class:09/08/2018ExpiraƟon Date:Minor UƟlity
Job Number:10508678Franchise Type:Electric
DescripƟon:INSTALL NEW UNDERGROUND PRIMARY LINE EXTENSION POLE P01 TO NEW PADMOUNT TRANSFORMER V01. JOINT
TRENCH. RESTORATION PER CITY OF RENTON STANDARDS .
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY ‐ ELECTRIC ‐ BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208‐2183Applicant
VICKI HENSON
POTELCO INC
8001 212th St S
Kent, WA 98032
B: (253) 863‐0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
ConstrucƟon Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057‐3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY ‐ ELECTRIC ‐ BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208‐2183Specialized
Billing
X
General CondiƟons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for AN
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105085678
Anish Kumar
253-208-2183
anish.kumar@pse.com
16826 108th Ave SE 98055
One at a time occupying N & S bound lanes of 108th Ave SE to install new
underground primary line extension from pole P01 to new padmount transformer location V01
for multi-family development. Developer to trench.
150'
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
8/21/2017
MFP17004152
Restoration per City of Renton Standards
Scott Warlick
Justin Johnson
9-8-2017
9-8-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
168 DEVELOPMENT
PSE/Potelco Inc.
Val Buzonov 425-457-9938
6905 S 228th St, Kent, WA 98032
val.buzunov@pse.com
16826 108th Ave SE E of 108th Ave SE
TBD
10/2/2017
Anish Kumar 8/21/2017
MFP17004152
Justin Johnson
9-8-2017
9:00 am to 3:00 pm
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
STOP
FLAGGER
STOP
FLAGGER
ONE LANE
ROAD
AHEAD W20-4100'100'ROAD
WORK
AHEAD W20-1W20-7AROADWORKAHEADW20-1ROADWORKAHEADW20-1 ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
16826108TH AVE SESE 168TH ST
SE 170TH ST
P01
16
11161616
111116 111112111111
11USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Job#105085678
16826 108th Ave SE. Renton, WA
August 18, 2017
Sheet 1 of 2 brent.pogson@pse.com
(425)462-3030
N
PSE PUGET
SOUND
ENERGY
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
STOP
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
MFP17004152
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
STOP
FLAGGER
W20-7AROADWORKAHEADW20-1ROADWORKAHEADW20-1 FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
16826108TH AVE SESE 168TH ST
SE 170TH ST
STOP
FLAGGERONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4100'100'ROAD
WORK
AHEAD W20-116
11161616
111116 111112111111
11USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Job#105085678
16826 108th Ave SE. Renton, WA
August 18, 2017
Sheet 2 of 2 brent.pogson@pse.com
(425)462-3030
N
PSE PUGET
SOUND
ENERGY
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
STOP
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
390'
4X4 WORK PIT
4X4 WORK PIT
1-2" SCH'L 80 CONDUIT, ± 390'
90°
90°
40T AØ
SW#79131
390'
(1) RUN UG 1/0 PRI, ± 430'
NEW CABLE TAG
EHS658-AØ
40T AØ
SW#79131
105085678SCALE: NONE
CONDUIT DIAGRAM
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
VAL BUZUNOV 425-457-9938 03/08/17
VAL BUZUNOV 425-457-9938 03/08/17
N/A N/A N/A
J. REIBMAN N/A 03/08/17
REQUIRED RENTON
168 DEVOLPMENT
PRIMARY LINE EXTENTION & MULTY FAMILY SVCS
16826 108TH AVE SE, RENTON, WA 98055
N/A N/A
N/A 105085678
AS NOTED 2/2
KING N/A N/A CSPSKEIN
T23N, R05E, SE SEC 29 N/A N/A
2305E116 2305E136 2305E116 ROL-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
TOP VIEW
SIDE VIEW
EXCAVATION: 4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
VAULT & EXCAVATION DETAIL
Not to scale 6045.1000
1950 lbs
Excavated Dirt Pile
Final Grade
24" Min
Backfill for Schedule 80 Conduit
(NO Rocks over 10" Diameter
or foreign objects)Separation
12" Min
18" Min
JOINT TRENCH DETAIL
Primary-Schedule 80 (NTS)
48"
Max
36"
Min
Cover
Phone & TV Primary Power Cable
in Customer Provided
Schedule 80 Conduit
ROADSIDE
To Excavated Dirt Pile
SCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
18" MIN
18" MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
6775.0035 Not to scale
MFP17004152
4283
EXISTING
"16826"
1 2 3
ROL
15
108TH AVE SED/W
390'
SITE PLAN
POWER GENERAL NOTES - MULTIFAMILY PROJECT
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
SU, ZHAO ZHANG
16826 108TH AVE SE
RENTON, WA 98055
XING MEI WEI (206)355-8668 105085678THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE SPECIFIC NOTES
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
ROL-15
2017
305 310 329
6.72 --
311.72 310 329
PHONE
CABLE TV
504568827 105085678
N/A 104293566
504770024 N/A
504770027 N/A
N/A 104293567
504770029 N/A
504770050 N/A
N/A 104293568
504770052 N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
"16838"
#A
#B
"16850"
"16826"
CIRCUIT FEET ADDED: 390'
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 200'
9.
10.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:VAL BUZUNOV
425-457-9938
val.buzunov@pse.com
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
VAL BUZUNOV 425-457-9938 03/08/17
VAL BUZUNOV 425-457-9938 03/08/17
N/A N/A N/A
J. REIBMAN N/A 03/08/17
REQUIRED RENTON
168 DEVOLPMENT
PRIMARY LINE EXTENTION & MULTY - FAMILY SVCS
16826 108TH AVE SE, RENTON, WA 98055
N/A N/A
N/A 105085678
AS NOTED 1/2
KING N/A N/A CSPSKEIN
T23N, R05E, SE SEC 29 N/A N/A
2305E116 2305E136 2305E116 ROL-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
FILTER FENCE
SCALE: NONE
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
Standoff Bracket
15" Min Length
Conduit Clamp Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
DEVELOPER CIVIL CONTRACTOR NOTES:
·REQUIRED TO PROVIDE AN 11' X 11' PIT AT THE 3 PHASE TRANSFORMER VAULT.
·REQUIRED TO PROVIDE 11' X 9' WORK PITS THE 3 PHASE J-BOX VAULTS.
·REQUIRED TO PROVIDE A 4' X 4' PIT AT METERS, POLE AND EXISTING PSE FACILITIES.
·REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3PH VAULTS.
·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS & TRENCH AT ALL TIMES.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND
ENERGY STANDARDS# 6750.6500.
** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **
PSE TO PROVIDES CONDUITS:
·PSE TO PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE IN ALL CONDUITS.
DEVELOPER EXCAVATION SPLICE NOTES:
·REQUIRED TO EXCAVATE & EXPOSED EXISTING PSE UG FACILITIES 48 HOURS BEFORE CONSTRUCTION
·ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 48 HOURS BEFORE CONSTRUCTION.
·EXCAVATION MUST BE COMPLETED 48 HOURS PRIOR TO CONSTRUCTION.
·REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING FOR THE
UG. PRIMARY SPLICES & INSTALLATION OF THE 1PH OR 3PH VAULT.
·BACKFILL / COVER REQUIRED ON PRIMARY.
CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES:
PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A
MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS
ALL INSPECTIONS ARE REQUIRED BY POTELCO INC
·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
P01
-EXISTING POLE AND EQUIPMENT TO REMAIN
-INSTALL NEW OH - UG L/B TERMINATION
-INSTALL NEW SW#T79131 & FUSE @40T TAP AØ
-INSTALL 1-2" RISER ON S/O BRAKETS
V01
-INSTALL 42" X 48" X 38" CONCRETE VAULT
-INSTALL 37.5kVA PADMOUNT TRANSFORMER, 120/240v
-INSTALL 1-12kV ELBOW KIT
-INSTALL 1-12kV DUST CAP
-INSTALL GRID
-CONNECT 6 RUNS OF 250 UG CUSTOMER OWNED TPX
SPAN NOTE
P01 TO V01
-INSTALL 1-2" OF SCH'L 80 CONDUIT, ± 390'
-INSTALL 1 RUN UG 1/0 PRI, ± 430'
-INSTALL NEW CABLE TAG EHS658-AØ
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
316754 166323
37.5kVA
6247050
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
P01 V01 2 1 390 2 322.5 400.8 1/0 PRI 430 EHS658
#A
#B
504770053 N/A
#A
#B
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
1650SQ PER UNIT = 6 UNIT
200AMPS
GAS
46KW
115A
2.3%
1.8%
MFP17004152