Loading...
HomeMy WebLinkAboutP_Design_105085678_V1_1708214283 EXISTING "16826" 1 2 3 ROL 15 108TH AVE SED/W 390' SITE PLAN POWER GENERAL NOTES - MULTIFAMILY PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: SU, ZHAO ZHANG 16826 108TH AVE SE RENTON, WA 98055 XING MEI WEI (206)355-8668 105085678THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ROL-15 2017 305 310 329 6.72 -- 311.72 310 329 PHONE CABLE TV 504568827 105085678 N/A 104293566 504770024 N/A 504770027 N/A N/A 104293567 504770029 N/A 504770050 N/A N/A 104293568 504770052 N/A PROJECT PHASE PWR NOTIF#ORDER# Superior "16838" #A #B "16850" "16826" CIRCUIT FEET ADDED: 390' UNDERGROUND CIRCUIT MAP SCALE: 1" = 200' 9. 10. E-Mail: Cell Phone: Project Manager Contact Information: Manager:VAL BUZUNOV 425-457-9938 val.buzunov@pse.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP VAL BUZUNOV 425-457-9938 03/08/17 VAL BUZUNOV 425-457-9938 03/08/17 N/A N/A N/A J. REIBMAN N/A 03/08/17 REQUIRED RENTON 168 DEVOLPMENT PRIMARY LINE EXTENTION & MULTY - FAMILY SVCS 16826 108TH AVE SE, RENTON, WA 98055 N/A N/A N/A 105085678 AS NOTED 1/2 KING N/A N/A CSPSKEIN T23N, R05E, SE SEC 29 N/A N/A 2305E116 2305E136 2305E116 ROL-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A FILTER FENCE SCALE: NONE CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic DEVELOPER CIVIL CONTRACTOR NOTES: ·REQUIRED TO PROVIDE AN 11' X 11' PIT AT THE 3 PHASE TRANSFORMER VAULT. ·REQUIRED TO PROVIDE 11' X 9' WORK PITS THE 3 PHASE J-BOX VAULTS. ·REQUIRED TO PROVIDE A 4' X 4' PIT AT METERS, POLE AND EXISTING PSE FACILITIES. ·REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3PH VAULTS. ·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS & TRENCH AT ALL TIMES. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS# 6750.6500. ** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** PSE TO PROVIDES CONDUITS: ·PSE TO PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE IN ALL CONDUITS. DEVELOPER EXCAVATION SPLICE NOTES: ·REQUIRED TO EXCAVATE & EXPOSED EXISTING PSE UG FACILITIES 48 HOURS BEFORE CONSTRUCTION ·ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 48 HOURS BEFORE CONSTRUCTION. ·EXCAVATION MUST BE COMPLETED 48 HOURS PRIOR TO CONSTRUCTION. ·REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING FOR THE UG. PRIMARY SPLICES & INSTALLATION OF THE 1PH OR 3PH VAULT. ·BACKFILL / COVER REQUIRED ON PRIMARY. CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS ALL INSPECTIONS ARE REQUIRED BY POTELCO INC ·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. P01 -EXISTING POLE AND EQUIPMENT TO REMAIN -INSTALL NEW OH - UG L/B TERMINATION -INSTALL NEW SW#T79131 & FUSE @40T TAP AØ -INSTALL 1-2" RISER ON S/O BRAKETS V01 -INSTALL 42" X 48" X 38" CONCRETE VAULT -INSTALL 37.5kVA PADMOUNT TRANSFORMER, 120/240v -INSTALL 1-12kV ELBOW KIT -INSTALL 1-12kV DUST CAP -INSTALL GRID -CONNECT 6 RUNS OF 250 UG CUSTOMER OWNED TPX SPAN NOTE P01 TO V01 -INSTALL 1-2" OF SCH'L 80 CONDUIT, ± 390' -INSTALL 1 RUN UG 1/0 PRI, ± 430' -INSTALL NEW CABLE TAG EHS658-AØ Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 316754 166323 37.5kVA 6247050 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) P01 V01 2 1 390 2 322.5 400.8 1/0 PRI 430 EHS658 #A #B 504770053 N/A #A #B LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1650SQ PER UNIT = 6 UNIT 200AMPS GAS 46KW 115A 2.3% 1.8%