HomeMy WebLinkAboutMFP17004401DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17004401
IVR Number: 17004401
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:08/30/2017Applica!on Date:7931000060Parcel Number:19808 TALBOT RD S
Permit Type :10/06/2017Issue Date:Franchise
Permit Work Class:10/08/2018Expira!on Date :Minor U)lity
Job Number:104293405Franchise Type :Electric
Descrip!on:Install new underground electric service to garage M 01 from overhead distribu)on P 01. No hard surface cuts
an)cipated
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP17004401
Scott Warlick
Homeowner not allowed to work within the City ROW without a bond in place
Restoration Per City of Renton Standards
Justin Johnson 10-4-2017
10-6-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
MFP17004401
10-4-2017
Justin Johnson8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
P01
S 199T
H
S
T TALBOT RD SS 199TH ST
STOP
FLAGGER
STOP
FLAGGER
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKONE L
A
N
E
ROAD
AHEA
D W20-4100'100'100'ROAD
WORK
AHEAD W20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4
X'
X'
X'ROADWORKAHEADW20-1
W20-7
A
USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
19808
garage
Job#104293405
19808 TALBOT RD S, RENTON, WA
JULY 19, 2017
Sheet 1 of 2 yuriy.bashtovoy@pse.com
(425)398-6193
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
NPSEPUGET
SOUND
ENERGY
Notes:
1. All signs and spacing to conform to the MUTCD
and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
STOP
POLE
MFP17004401
P01
S 199T
H
S
T TALBOT RD SSTOP
FLAGGER
STOP
FLAGGER
ONE L
A
N
E
ROAD
AHEAD W20-4100'100'100'ROAD
WORK
AHEA
D W20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4
X'
X'
X'ROADWORKAHEADW20-1
W20-7
A
USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
19808
garage
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGRESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
S 199TH ST
Job#104293405
19808 TALBOT RD S, RENTON, WA
JULY 19, 2017
Sheet 2 of 2 yuriy.bashtovoy@pse.com
(425)398-6193
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
NPSEPUGET
SOUND
ENERGY
Notes:
1. All signs and spacing to conform to the MUTCD
and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
STOP
POLE
MFP17004401
M01
P01
90° (>36")
1-3" SCH'L 40 CONDUIT, ± 124'
ON PRIVATE PROPERTY
3/4 CU. YD. OF SAND
3/4 CU. YD. OF SAND
1-3" SCH'L 80 CONDUIT, ± 124'
WITHIN RIGHT-OF-WAY
(1) RUN #4/O UG TPX, ± 278'
M01
EVA
23
TALBOT RD SCUR
R
E
N
T
L
Y
G
R
A
S
S
/
T
R
E
E
PROP
O
S
E
D
S
1
9
8
T
H
P
L
EXTE
N
S
I
O
N
"196
4
0
"
NEW
GAR
A
G
E
P01
S 19
9
T
H
S
T
315773
165841
25kVA
120/240v
124'
60'94'"952
2
"
"950
0
"
"198
1
6
"
EXIS
T
I
N
G
HOM
E
"198
0
8
"
"196
5
3
"
"198
0
1
"
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
PETER GUNTER
19808 TALBOT RD S
RENTON, WA 98055
PETER GUNTER (206) 795-5917 104293405THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
HP Svc/MSA
HP Main
Distribution
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
104293405504520868
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
EVA-23
2017
119 119 116
-1.17 -
119 120.17 116
SCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. HONEYSETT 253-245-0883 07/06/17
D. HONEYSETT 253-245-0883 07/06/17
N/A N/A N/A
D. BRINKMANN N/A 07/06/17
N/A CITY OF RENTON
SHOP
NEW PERMENANT UG SERVICE
19808 TALBOT RD S, RENTON, WA 98055
N/A N/A
N/A 104293405
AS NOTED 1/1
KING COUNTY N/A N/A CSPCKEIN
T22N,R05E,NE SEC 06 N/A N/A
2205E021 2205E036 2205E021 EVA-23
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:D. HONEYSETT
253-245-0883
DAVID.HONEYSETT@PSE.COM
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
6" Min
in Conduit
Schedule 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
4" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SITE PLAN
SCALE: 1" = 50'
SITE SPECIFIC NOTES:
P01
-EXISTING POLE AND EQUIPMENT TO REMAIN
-INSTALL NEW 1-3" RISER ON EXISTING S/O BRACKETS
SPAN NOTE:
P01 TO M01
-CUSTOMER TO INSTALL NEW 1-3" SCH'L 80 CONDUIT, ±124', WITHIN ROW
-CUSTOMER TO INSTALL NEW 1-3" SCH'L 40 CONDUIT, ±124', ON PRIVATE
PROPERTY
-PSE TO INSTALL 1 RUN #4/0 TPX, ± 278"
DEVELOPER & CUSTOMER NOTES:
-CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING , SELECT BACKFILL,
RESTORATION AND COMPACTION PER PSE STANDARDS #6750.6500.
-CUSTOMER NEEDS TO PROVIDE PROOF OF L&I INSPECTION 72 HOURS PRIOR TO
CONSTRUCTION
-CUSTOMER TO PROVIDE 4'x4'WORK PIT & 3/4 CU. YD. OF SAND @ M01 & P01
-CUSTOMER TO PROVIDE AND INSTALL DISCONTINUOUS 54971-3" SCH'L 80 GRAY
&21'8,7
3(5&,7<2)5(172125',1$1&(6(&7,219
-CUSTOMER TO PROVIDE AND INSTALL DISCONTINUOUS 1-3" SCH'L 40 GRAY
&21'8,7
-CUSTOMER TO PROVIDE & INSTALL 3/8" NON POLY PULL ROPE
ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL.
ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE
CONSTRUCTION.
POWER GENERAL NOTES - RESIDENTIAL PROJECT
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this
work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to
get the underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.).
See sketch and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible
walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be
required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer
lines when paralleling them in the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
2000 SQ.
200 AMPS
GAS
8 KW
65A
2.8%
3.0%
CIRCUIT FEED ADDED: 0'
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit StakesGas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
PERMANENT METER DETAIL AT M02
NOT TO SCALE
JOB SITE
JOB SITE
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
5" Min
℄
Climbing
Space℄
OUTAGE LIST
"19816" 2nd AVE S, Kent, WA 98030
"9522" 2nd AVE S, Kent, WA 98030
"9500" 2nd AVE S, Kent, WA 98030
"9507" 2nd AVE S, Kent, WA 98030
"19821" 2nd AVE S, Kent, WA 98030
"19833" 2nd AVE S, Kent, WA 98030
Direction of Vehicular Traffic (Southtound)Utility StuboutsTrench to
Building
4'
4'GasTV, TELPowerWork Pit Dimensions
Electric and Joint Utility
12"
Sand Backfill
3/4 Yard
Gas Service Line Conduit
Pipes and Wires
Utility Installed
Conduit Depth
Schedule 40 Yellow or White PVC
Customer Provided
Gas Stub Marker
Utility Provided
Dig to 12" from the Gas Marker
Cover any accidentally exposed gas
stubs with 12" of sand.
24" Min to 36" Max
Electric Service Cable Conduit
3" Schedule 40 Grey PVC
Customer Provided
Electric Stub Marker
Utility Provided
Sand Backfill Requirements:
Sand shall be provided on-site by the customer and
placed within hand-shoveling distance to the work
pit for shading over direct buried facilities.
POWE
R
TV
TEL
GAS
CUSTOMER PROVIDED PROPERTY LINE WORK PIT
NOT TO SCALE
depth as mainline trench conduit.
3" of Sand Bedding
3" of Sand Shading
36" Min Cover
(38" Max)6"
Road crossing must be at same
Pavement Curb
Sidewalk R/W
ROAD CROSSING ELEVATION
Not to scale 6790.0075
MFP17004401