HomeMy WebLinkAboutP_Design_593187231_V1_170828316970-166962
316985-166962
25kVA 120/240v
SE 163RD ST
SE 162ND ST
JOB SITE
General
-All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon
request.
-Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be
removed daily.
-Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be
coiled and returned the day it is removed from the poles. Remove all unused pins and insulators.
-Return all streetlights, area lights and floodlights to Sumner yard.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in
advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in
advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy
of worksketch.
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as
otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been re-established or
disturbed soil has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
8-10-17 PER LUKE NEELY CELL 253-569-2523:
NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D
CORE HOURS, SHORT 1 HOUR OUTAGE REQ'D ON 11 RESIDENTIAL CUSTOMERS AT P01 AND
THE SAME ON THE 3 RESIDENTIAL CUSTOMERS AT P02.
AT P01 AT GRID 316970-166962:
-INST 1PH PTP PER STD 6031.1010 FIG 1
-TRANSF 1PH PRI CONDUCTOR TO PTP
-REPLACE BARE JUMPER WITH COVERED JUMPER
-INST R/C FOR COM NEUT & ROLL NEUT TO COM POS NORTH-SOUTH
-REMOVE OLD CROSSARM, JIFFY PIN INS, AND PRI NEUT INS
AT P02 AT GRID 316985-166962:
-INST 1PH PTP PER STD 6031.1010 FIG 1
-TRANSF 1PH PRI CONDUCTOR TO PTP
-REPLACE BARE JUMPER TO XFMR WITH COVERED JUMPER
-INST R/C FOR COM NEUT & ROLL NEUT TO COM POS NORTH-SOUTH
-REMOVE OLD CROSSARM, JIFFY PIN INS, AND PRI NEUT INS
GENERAL SPECIFICATIONS
Scope of Work
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)593187231N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. NEELY 253-569-2523 8/11/17
L. NEELY 253-569-2523 8/11/17
L. ORTIZ 714-893-2405 8/11/17
N/A RENTON
ROL-17 16128 128TH AVE SE. RENTON
REPLACE JIFFY PINS INSULATORS
16128 128TH AVE SE. RENTON, WA 98058
ASPLUNDH CONSTRUCTION CORP.
593187231
AS NOTED 1/1
KING QCSOKE
NE 28-23N-05E
2305E109 2305E136 ROL-172305E109
11325894 593187231
Owner / Developer Contact Info
officeATTN:
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LUKE NEELY
253-569-2523
LUKE.NEELY@PSE.COM
THOMAS GUIDE
656-F6
SITE MAP - UNIVERSAL MAP (2305E109)
SCALE: 1" = 50'
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E136
PSE
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
OVERHEAD CONSTRUCTION
Poles & Structures
-Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements
are from the center of the pole.
-All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than
specified.
-Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification
6014.1000 at new gang operated switch locations.
-Install grid numbers on all new and existing poles as shown on sketch.
-Straighten existing poles as indicated or as necessary.
-Treat all field-drilled poles with copper napthenate wood preservative.
-Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill
and crown pole holes and restore the area similar to adjacent landscaping.
Conductors & Equipment
-Transfer all overhead and underground primary, secondary and service conductors and guys to new poles
set, unless otherwise indicated on this sketch.
-Transfer existing transformers to new poles unless otherwise indicated on this sketch.
-Use stirrups to connect all overhead and underground primary taps, and transformers above 25 kVA.
Install at all sites being worked within the scope of the project where they are currently missing.
- For 12vK construction, install avian protection with #4 CU-covered jumpers (MID#9998076) and #4 SD
Aluminum covered tie-wire (MID#8309760). For 34vK construction use bare wire primary jumpers with
pre-formed helical-grip ties and avian protection devices when required per Std. 6015.2000. Jumpers for
poles that are double dead ended with tree wire can be either the same size tree wire conductor or covered
CU.
-Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.
-Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.
-All neutral connections to be made with solid compression connectors. Connect all pole grounds to
common neutral.
-Use Load-interrupter cutouts (with arc shields) on all primary overheads and underground taps with fused
protection above 40T.
-Install Wildlife Protectors on all transformers.
SINGLE-PHASE SINGLE POLE TOP PIN
NOT TO SCALE STD. 6031.1010
Luke Neely
Luke Neely
253-569-2523
253-569-2523
8/23/17
8/23/17