Loading...
HomeMy WebLinkAboutMFP17004440DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17004440 IVR Number: 17004440 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:09/05/2017Applica!on Date:0423059186Parcel Number:3410 NE 12TH ST Permit Type :10/06/2017Issue Date:Franchise Permit Work Class:10/06/2018Expira!on Date :Minor U&lity Job Number:105079276Franchise Type :Electric Descrip!on:install 3" conduit with secondary cable to new handhold on private property to serve 3410 This is a Reapplica&on . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant J.D. Wilson City of Renton 1055 S Grady Way , 5th Floor Renton, WA 98057 B: (425) 430-7295Contact Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP17004440 Scott Warlick 9/21/2017 Justin Johnson 10-4-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form MFP17004440 Justin Johnson 10-4-2017 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). PROJECT PROJECT LOCATION TRAFFIC FLOW PERM LANE MARKINGS TAPERS / TANGENTS PROTECTIVE VEHICLE W/BEACON TRUCK-MOUNTED ATTENTUATOR PORTABLE TRAFFIC SIGNAL SLOW VMS12 LEGEND FLAGGER OFFICER SURVEYORS WORK SPACE UTILITY WORK CONSTRUCTION DEVICES SIGNS BARRICADES ARROW BOARD ARROW MODE ARROW BOARD CAUTION MODE PCMS / VMS TEMPORARY TRAFFIC CONTROL PLAN Not Drawn to Scale This sketch not to be relied upon for exact location of utilities. CALL (800) 424-5555 TWO BUSINESS DAYS BEFORE YOU DIG PERMIT Yes No Traffic Control Supervisor(TCS) X Flaggers/Spotters X Uniformed Officer X DRAWING NOT TO SCALE Drawn by: D Sandall - WA TCS Certificate # 8957, OR TCS Certificate # 5107 425-923-0010 10/22/2015 1 of 1 City of Renton WORK HOURS LANE WIDTH POSTED SPEED MERGE TAPER (L) BUFFER SIGN SPACING DEVICES TAPERS DEVICES TANGENT 10-20 ft 11ft X 40FT 7am to 5pm +/-200ft 155ft 100ft* Robert Baker-Potelco 101075104 robert.baker@pse.com Robert Webster-PSE Robert.Webster@pse.com 101094248 James Vigenjames.vigen@pse.com101095266 Betty Frank-PSE betty.frank@pse.com 11182019 Work from P01 to M01 Notes: 1. All signs and spacing must conform to the City of Renton, WSDOT and the MUTCD. 2.All signs are 48”x48” B/O unless otherwise specified. 3.Channeling devices are 28” cones with retro reflective banding. 4. Notify City , County or WSDOT authorities 48 to 72 hours in advance of work if required. “K&D Services, Inc., as the preparer of this traffic control plan makes no representation as to its general adequacy or being approved for implementation. Approval must come from the Traffic Engineer or other public official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be as a result of that approval. Ref: MUTCD 2009 6A-01(10).” Samantha Chipps-Freeman-Quanta Samantha.Chipps-Freeman@pse.com 101092470 Hong Nguyen-Quanta hong.nguyen@pse.com 105078446 Michael Judy-PSE mike.judy@pse.com 105077588 Boris Sidorov-PSE Boris.Sidorov@pse.com 101094821 Vincent Rabon -PSE vincent.rabon@pse.com 105076373 Val Buzunovval.buzunov@pse.com105078786 Lee Brown101094384lee.brown@pse.com Luke Neely like.neely@pse.com 101094655 Tom Kerfonta tom.kerfonta@pse.com 101087984 Brigitte Burleson 101091924 brigitte.burleson@pse.com 3410 NE 12th St Carl Buher carl.Buher@pse.com 101074754 Nick CoulsonNick.Coulson@pse.com111022724 Hong Nguyen hong.nguyen@pse.com 105077495 Chun Ho Chun.Ho@pse.com 101092096 Victor A Ibarra victor.ibarra@pse.com 105076667 R1 Kelly O’Brien Kelly.O’Brien@pse.com 186045114 David Goodaledavid.goodale@pse.com101095670 Guy RiderGuy.Rider@pse.com101093487 Trina Gallaher Trina.Gallaher@pse.com 594103826 Leslie Regier Leslie.Regier@pse.com 101095356 Devandra Kumar-Quanta devandra.kumar@pse.com 105077846 Jake Helgestadjake.helgestad@pse.com101093835 Asta Bitinas 105078492 Asta.Bitinas@pse.com Kelley O’BrienKelley.O’Brien@pse.com571012205 Bradley Elkin bradley.elkin@pse.com 105078725 Jessica Reibman Jessica.Reibman@pse.com 101095143 Jeremy TuntlandJeremy.Tuntland@pse.com111022798Robert Gallaherrobert.gallaher@pse.com101095293Carolyn Soetengacarolyn.soetenga@pse.com101094976 Jeremy Boland Jeremy.Boland@pse.com 101091141 Fabian Gomez-Aerotek Fabian.Gomez@pse.com 105075581 Jessica Reibman Jessica.Reibman@pse.com 105079276 Vasiliy Trofimenko Vasiliy.Trofimenko@pse.com 105051741 Carl McDonald carl.mcdonald@pse.com 105077968 25mph Ernie Garza Ernie.Garza@pse.com 111020530 Adam Armstrong Adam.Armstrong@pse.com 101095786 Roberta Marta roberta.marta@pse.com 101095575 Libby RogerLibby.Roger@pse.com5007447/186570863 Randy Blackie-Aerotek randy.blackie@pse.com 105078603-107050775 Dianne AlexanderDianne.Alexander@pse.com104273556 Barbara Haddox Barbara.Haddox@pse.com 186569559 *Flagger Taper MFP17004440 HIG 13 6X6 WORK PIT 4X4 WORK PIT  5818*73/;“ 6&+ /&21'8,7“ SITE PLAN Owner / Developer Contact Info officeATTN: CITY OF RENTON 3555 NE 2ND ST RENTON, WA 98056 GEORGE STAHL (425)430-7400 105079276THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE CONDUIT CIRCUIT ONE-LINE DIAGRAM CIRCUIT FEET ADDED: 0' ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 502089838 105079276 N/A N/A N/A N/A N/A N/A 502382465 587025070 N/A 586022668 N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP VAL BUZUNOV 425-457-9938 10/20/15 VAL BUZUNOV 425-457-9938 10/20/15 N/A N/A N/A J. REIBMAN 2534376798 10/20/15 ROW REVIEW RENTON CITY OF RENTON N/A 3410 NE 12TH ST, RENTON, WA 98056 PSE N/A N/A N/A 105079276 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SE SEC 16 N/A N/A 2305E016 2305E040 2305E016 HIG-13 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:VAL BUZUNOV 425-457-9938 val.buzunov@pse.com N Vicinity Map N/A LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A N/A N/A 50 100 3.6 1.9 SCALE: 1"=50' TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 80 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8 " in diameter. SIDE VIEW 15" 23-1/4"32-3/4" 2" Captive L-Bolt Lock Cover, 10 lbs 24" Approx Approx 13" Customer's service conductors 4-3/4" X 4-3/4" KNOCKOUT IN 2 PLACES Conductors enter from beneath and shall be folded back with handhole Set handhole flush to final grade Captive L-Bolt Lock Cover SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic RISER PLACEMENT DETAIL TOP VIEW Not to Scale P01 318643-166904 -INSTALL 1-3 CONDUIT RISER H01 -INSTALL NEW 13"x24" F/G HH. -INSTALL NEW 3 of 4-POS FARGOS. -CONNECT 2 RUNS OF CUSTOMER OWNED 3/0 SVC. SPAN NOTES P01 TO H01 -INSTALL 10' OF 1-3" SCH'L 80 CONDUIT. ,167$//8*73;“ SECONDARY UNDERGROUND & MFP17004440