Loading...
HomeMy WebLinkAboutP_Design_105079276_V1_170905HIG 13 6X6 WORK PIT 4X4 WORK PIT  5818*73/;“ 6&+ /&21'8,7“ SITE PLAN Owner / Developer Contact Info officeATTN: CITY OF RENTON 3555 NE 2ND ST RENTON, WA 98056 GEORGE STAHL (425)430-7400 105079276THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE CONDUIT CIRCUIT ONE-LINE DIAGRAM CIRCUIT FEET ADDED: 0' ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 502089838 105079276 N/A N/A N/A N/A N/A N/A 502382465 587025070 N/A 586022668 N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP VAL BUZUNOV 425-457-9938 10/20/15 VAL BUZUNOV 425-457-9938 10/20/15 N/A N/A N/A J. REIBMAN 2534376798 10/20/15 ROW REVIEW RENTON CITY OF RENTON N/A 3410 NE 12TH ST, RENTON, WA 98056 PSE N/A N/A N/A 105079276 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SE SEC 16 N/A N/A 2305E016 2305E040 2305E016 HIG-13 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:VAL BUZUNOV 425-457-9938 val.buzunov@pse.com N Vicinity Map N/A LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A N/A N/A 50 100 3.6 1.9 SCALE: 1"=50' TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 80 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8 " in diameter. SIDE VIEW 15" 23-1/4"32-3/4" 2" Captive L-Bolt Lock Cover, 10 lbs 24" Approx Approx 13" Customer's service conductors 4-3/4" X 4-3/4" KNOCKOUT IN 2 PLACES Conductors enter from beneath and shall be folded back with handhole Set handhole flush to final grade Captive L-Bolt Lock Cover SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic RISER PLACEMENT DETAIL TOP VIEW Not to Scale P01 318643-166904 -INSTALL 1-3 CONDUIT RISER H01 -INSTALL NEW 13"x24" F/G HH. -INSTALL NEW 3 of 4-POS FARGOS. -CONNECT 2 RUNS OF CUSTOMER OWNED 3/0 SVC. SPAN NOTES P01 TO H01 -INSTALL 10' OF 1-3" SCH'L 80 CONDUIT. ,167$//8*73;“ SECONDARY UNDERGROUND &