HomeMy WebLinkAboutP_Design_105079276_V1_170905HIG
13
6X6 WORK PIT
4X4 WORK PIT
5818*73/;
6&+
/&21'8,7
SITE PLAN
Owner / Developer Contact Info
officeATTN:
CITY OF RENTON
3555 NE 2ND ST
RENTON, WA 98056
GEORGE STAHL (425)430-7400 105079276THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE SPECIFIC NOTES
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SCALE: NONE
CONDUIT CIRCUIT ONE-LINE DIAGRAM
CIRCUIT FEET ADDED: 0'
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
502089838 105079276
N/A N/A
N/A N/A
N/A N/A
502382465 587025070
N/A 586022668
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
VAL BUZUNOV 425-457-9938 10/20/15
VAL BUZUNOV 425-457-9938 10/20/15
N/A N/A N/A
J. REIBMAN 2534376798 10/20/15
ROW REVIEW RENTON
CITY OF RENTON
N/A
3410 NE 12TH ST, RENTON, WA 98056
PSE
N/A N/A
N/A 105079276
AS NOTED 1/1
KING N/A N/A CSPSKEIN
T23N, R05E, SE SEC 16 N/A N/A
2305E016 2305E040 2305E016 HIG-13
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:VAL BUZUNOV
425-457-9938
val.buzunov@pse.com
N
Vicinity Map
N/A
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
N/A
N/A
N/A
50
100
3.6
1.9
SCALE: 1"=50'
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Schedule 80 Grey PVC
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8 " in diameter.
SIDE VIEW
15"
23-1/4"32-3/4"
2"
Captive L-Bolt
Lock Cover, 10 lbs
24"
Approx
Approx
13"
Customer's
service
conductors
4-3/4" X 4-3/4"
KNOCKOUT IN 2 PLACES
Conductors enter from
beneath and shall be
folded back with handhole
Set handhole flush
to final grade
Captive L-Bolt
Lock Cover
SINGLE PHASE SECONDARY HANDHOLE
Not to scale 6050.2000
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
P01 318643-166904
-INSTALL 1-3 CONDUIT RISER
H01
-INSTALL NEW 13"x24" F/G HH.
-INSTALL NEW 3 of 4-POS FARGOS.
-CONNECT 2 RUNS OF CUSTOMER OWNED 3/0 SVC.
SPAN NOTES
P01 TO H01
-INSTALL 10' OF 1-3" SCH'L 80 CONDUIT.
,167$//8*73;
SECONDARY UNDERGROUND &