Loading...
HomeMy WebLinkAboutMFP17004487DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17004487 IVR Number: 17004487 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:09/06/2017Applica!on Date:0923059116Parcel Number:850 MONROE AVE NE Permit Type :11/07/2017Issue Date:Franchise Permit Work Class:11/07/2018Expira!on Date :Minor U(lity Job Number:101106285Franchise Type :Electric Descrip!on:Removing old wire, installing new poles with UG riser and termina(on , and trenching from poles to private property . Service across Monroe must be underground . Restora(on per City of Renton Standards . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP17004487 Restoration per City of Renton Standards Service across Monroe must be underground. Holly Powers 11/3/2017 Justin Johnson 11-7-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form MFP17004487 Justin Johnson 11-7-2017 8:00 am to 3:00 pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 2121 1212P04P05 AREA UNDER CONSTRUCTION THE PINES AT HIGHLANDS MONROE AVE NEMONROE AVE NENE 9TH ST PROPOSED RD/UNDER CONSTRUCTION NE 8TH ST REMOVE NEW FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK NO PARK SIGNAGE WILL BE PLACED ON BOTH SIDES OF MONROE AVE NE SURROUNDING WORK ZONE STOP FLAGGER STOP FLAGGERONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A200'200'200'ROADWORKAHEADW20-1100' ONE LANE ROAD AHEAD W20-4ROAD WORK AHEAD W20-1W20-7A200'200'200'R9-11SIDEWALK CLOSED AHEADR9-9SIDEWALK CLOSEDR9-9SIDEWALKCLOSEDR9-11SIDEWALKCLOSEDAHEADPATH OF INSTALLATION CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#101106285 850 Monroe Ave NE, Renton WA August 23, 2017 Sheet 1 of 3 ryan.honeysett@pse.com (425)457-5381 N PSE PUGET SOUND ENERGY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG FLAGGER STOPPuget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)478-5381 Ryan H. Honeysett SHEET IS FORMATTED FOR 11 X 17 MFP17004487 2121 P01 1212P02 P05 AREA UNDER CONSTRUCTION THE PINES AT HIGHLANDS MONROE AVE NEMONROE AVE NENE 9TH ST PROPOSED RD/UNDER CONSTRUCTION NE 8TH ST NEW OH WIRE CONSTRUCTION;REMOVE WIRE BETWEEN P01 & P03, P03 & P05 FLAGGERS WILL TEMPORARILY HOLD TRAFFIC FOR APPROX 5 MINUTES FOR WIRE WORK FROM P03 & P05 DRIVEWAYS TO STAY CLOSED DURING WIRE REMOVAL FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK NO PARK SIGNAGE WILL BE PLACED ON BOTH SIDES OF MONROE AVE NE SURROUNDING WORK ZONE RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE STOP FLAGGER STOP FLAGGERONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A200'200'200'ROADWORKAHEADW20-1100' P04 P03 PATH OF INSTALLATION ONE LANE ROAD AHEAD W20-4ROAD WORK AHEAD W20-1W20-7A200'200'200'CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#101106285 850 Monroe Ave NE, Renton WA August 23, 2017 Sheet 2 of 3 ryan.honeysett@pse.com (425)457-5381 N PSE PUGET SOUND ENERGY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG FLAGGER STOPPuget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)478-5381 Ryan H. Honeysett SHEET IS FORMATTED FOR 11 X 17 MFP17004487 2121 1212AREA UNDER CONSTRUCTION THE PINES AT HIGHLANDS P06 J01 V01 MONROE AVE NEMONROE AVE NENE 9TH ST PROPOSED RD/UNDER CONSTRUCTION NE 8TH ST FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK NO PARK SIGNAGE WILL BE PLACED ON BOTH SIDES OF MONROE AVE NE SURROUNDING WORK ZONE STOP FLAGGER STOP FLAGGERONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A200'200'200'REMOVE P03 RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE OH WIRE CONSTRUCTION;REMOVE WIRE BETWEEN P03 & P06 DRIVEWAYS TO STAY CLOSED DURING WIRE REMOVAL ONE LANE ROAD AHEAD W20-4ROAD WORK AHEAD W20-1W20-7A200'200'200'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7A100'100'100' PATH OF INSTALLATION CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#101106285 850 Monroe Ave NE, Renton WA August 23, 2017 Sheet 3 of 3 ryan.honeysett@pse.com (425)457-5381 N PSE PUGET SOUND ENERGY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG FLAGGER STOPPuget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)478-5381 Ryan H. Honeysett SHEET IS FORMATTED FOR 11 X 17 MFP17004487 MONROE AVE NE1 TRACT D#2 ACSR867 863 859 855 851 820 822 ABCMonroe AVE NETHE PINES AT HIGHLANDS PRE 11 100T T9123 100T T9124 SITE PLAN 101106285SCALE: 1" = 20' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Hong Nguyen 425-449-6609 8/5/2017 Hong Nguyen 425-449-6609 8/5/2017 C.Pompeani 253-208-2665 8/5/2017 Required City of Renton The Pines at Highlands SCH'L 73 Conversion 850 Monroe Ave NE Renton, WA 98056 Designed By: PSE 101106285 AS NOTED 1 of 3 King CSPSKEIN 23N 05E 9NE 2305E033 2305E040 2305E033 PRE-11 Century Link/QWEST Comcast Renton School District SITE SPECIFIC NOTES P01 318410-166868 - EXISTING POLE TO REMAIN P02 318419-166868 - INSTALL NEW 45' CL-2 WITH GROUNDS - INSTALL (1) 3Ø FG DEADEND ARM - INSTALL (1) DEADEND POLE MOUNT - INSTALL (1) DEADEND NEUTRAL - INSTALL (1) TRI UNIT FIBERGLASS OH/UG TERMINATION - INSTALL (3) L/I C/O FUSE @ 100T & (3) STIRRUP BOLT - INSTALL SWITCH NUMBER T79123 - INSTALL 4" RISER CONDUIT ON NEW S/O BRACKET - INSTALL (1) CNRC - INSTALL (1) 7/16 PRIMARY AND 3/8 NEUTRAL DOWN GUY (NW) - INSTALL (1) SINGLE HELIX 15' - INSTALL GRID NUMBER 318419-166868 P03 318427-166868 - REMOVE 15kVA 120/240v 1Ø OH TRF - REMOVE EXISTING RISER - REMOVE STREETLIGHT - WRECK OUT EXISTING 45' CL-3 POLE - COMMUNICATIONS TO TRANSFER P04 318412-166860 - INSTALL NEW 35' CL-3 SERVICE POLE - INSTALL (1) RIGID CLEVIS - INSTALL (1) 3" RISER ON NEW S/O BRACKET - INSTALL GRID NUMBER 318412-166860 P05 318439-166852 - EXISTING POLE TO REMAIN P06 318439-166868 - EXISTING POLE TO REMAIN - INSTALL (1) TRI UNIT FIBERGLASS OH/UG TERMINATION - INSTALL (3) L/I C/O FUSE @ 100T & (3) STIRRUP BOLT - INSTALL SWITCH NUMBER T9124 - INSTALL 4" RISER CONDUIT ON NEW S/O BRACKET - INSTALL (1) 7/16 PRIMARY AND 3/8 NEUTRAL DOWN GUY (SE) - INSTALL (1) SINGLE HELIX 15' J01 318438-166868 - INSTALL 4'-8' X 7' X 5' HH WITH 2-3' SQ DPC - INSTALL (3) 200A 15kV 4 BUSHING - INSTALL (7) 12kV ELBOW KIT - INSTALL (5) 12kV DUST CAPS - INSTALL GRID NUMBER 318438-166868 V01 318436-166869 - INSTALL 36" X 42" X 38" MINI PAD WITH GROUNDS - INSTALL 25kVA PADMOUNT TRANSFORMER - INSTALL (1) 12kV ELBOW KIT - INSTALL (1) 12kV DUST CAP - INSTALL GRID NUMBER 318436-166869 SPAN NOTES P01 TO P02 - INSTALL 3Ø #2 ACSR OH WIRE ± 75' P01 TO P03 - REMOVE EXISTING 3Ø #2 ACSR WIRE ± 172' P02 TO J01 - INSTALL 3Ø 1/0 OH TO UG PRIMARY CABLE ± 238' - INSTALL CABLE TAG AØ EHR270, BØ EHR271, CØ EHR272 - INSTALL 4" SCH'L 80 CONDUIT ± 188' - INSTALL SPARE 4" SCH'L 80 CONDUIT ± 188' P03 TO P05 - REMOVE EXISTING OH 1/0 SECONDARY TRIPLEX WIRE ± 115' V01 TO P04 - INSTALL 350 KCMIL UG TO OH SECONDARY TRIPLEX CABLE ± 188' - INSTALL 3" SCH'L 80 DISCONTINUOUS CONDUIT ± 148' P04 TO P05 - INSTALL 350 KCMIL OH SECONDARY TRIPLEX WIRE ± 50' - RECONNECT SERVICES "855", "859", "863" P03 TO P06 - REMOVE EXISTING 3Ø #2 ACSR OH WIRE ± 104' - REMOVE EXISTING 1/0 OH SECONDARY TRIPLEX ± 104' P06 TO J01 - INSTALL 3Ø 1/0 OH TO UG PRIMARY CABLE ± 66' - INSTALL 4" SCH'L 80 CONTINUOUS CONDUIT ± 16' - INSTALL CABLE TAG AØ EHR274, BØ EHR275, CØ EHR276 - INSTALL SPARE 4" SCH'L 80 CONDUIT ± 14' - INSTALL 90° SWEEP AT POLE AND 10' OF 4" SCH'L 80 STUB OUT ON S/O BRACKET WITH CAP J01 TO V01 - INSTALL 1Ø 1/0 PRIMARY CABLE ± 32', TAP A - INSTALL CABLE TAG AØ EHR243 - INSTALL 2" SCH'L 80 DISCONTINUOUS CONDUIT ± 12' V01 TO P06 - INSTALL 350 KCMIL UG TO OH SECONDARY TRIPLEX CABLE ± 85' - INSTALL 3" SCH'L 80 DISCONTINUOUS CONDUIT ± 35' - RECONNECT SERVICES "867", "871", "880" OVERHEAD CIRCUIT MAP (2305E040) SCALE: 6" = 1 MILE JOB SITE THE PINES AT HIGHLANDS N Vicinity Map THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" Hong Nguyen 425-449-6609 Cell Phone Project Manager Contact Information: Owner / Developer Contact Info officeATTN: Habour Homes 400 N. 34th St, STE 300 Seattle, WA 98103 J Waltier 206-315-8130PHONE CABLE TV 504758367 101106285 N/A 583.... N/A 584.... N/A N/A N/A 108.... PROJECT PHASE PWR NOTIF#ORDER# Superior UG Expense Removal OH Expense 593.... 594.... UG Expense OH Expense ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites JOB SITE GENERAL OVERHEAD NOTES 1) POLES, CONDUCTOR, DEVICES TO BE INSTALLED PER PSE STANDARDS & SPECIFICATIONS. 2) POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. 3) ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH OR BETTER. 4) INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. 5) INSTALL GRID NUMBERS ON ALL NEW OR EXISTING POLES AS 6) TREAT ALL FIELD-DRILLED POLE WITH COPPER NAPHTHENATE OVERHEAD SECONDARY/PRIMARY NOTES: PSE NOTES: 1) All work to be done per (PSE) Standard Practices. Site Preparation - Prior to Construction, work area to be at or near finished grade & clear of soil or construction materials which would restrict construction access. Equipment Access - Adequate space is to be maintained around electrical equipment & facilities unimpeded by shrubbery, ponds, fences, rockeries, walls, structures, etc.. 4) Customer / Developer to coordinate between utilities. 2) 3) WOOD PRESERVATIVE. SHOWN ON SKETCH. DEVELOPER CIVIL CONTRACTOR NOTES: ·REQUIRED TO PROVIDE AN 11' X 9' PIT AT J01. ·REQUIRED TO PROVIDE 6' X 6' WORK PIT AT V01. ·REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P02, P04, AND P06. ·REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3PH VAULTS. ·REQUIRED TO PROVIDE TRENCH ± 188' FROM P02 TO J01. ·REQUIRED TO PROVIDE TRENCH ± 148' FROM V01 TO P04. ·REQUIRED TO PROVIDE TRENCH ± 12' FROM J01 TO V01. ·REQUIRED TO PROVIDE TRENCH ± 35' FROM V01 TO P06. ·REQUIRED TO PROVIDE TRENCH ± 16' FROM J01 TO P06. ·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS & TRENCH AT ALL TIMES. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS# 6750.6500. ** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS ALL INSPECTIONS ARE REQUIRED BY POTELCO INC ·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. MFP17004487 INSTALL ± 85' 1Ø 350 KCMIL INSTALL ± 66' 3Ø 1/0 INSTALL ± 188' 1Ø 350 KCMIL INSTALL ± 238' 3Ø 1/0 INSTALL ± 33' 1Ø 1/0 INSTALL ± 75' 3Ø OF #2 ACSR INSTALL ± 50' 1Ø 350 KCMIL AØ EHR270 BØ EHR271 CØ EHR272 AØ EHR274 BØ EHR275 CØ EHR276 AØ EHR273 100T T9123 100T T9124 CUSTOMER SUPPLIED 11' x 9' WORK PIT CUSTOMER SUPPLIED 6' x 6' WORK PIT CUSTOMER SUPPLIED 4' x 4' WORK PIT CUSTOMER SUPPLIED 4' x 4' WORK PIT INSTALL (2) ± 16' 4" SCH'L 80 INSTALL (1) ± 35' 3" SCH'L 80 INSTALL (2) ± 12' 4" SCH'L 80 INSTALL (1) ± 148' 3" SCH'L 80 INSTALL (2) ± 188' 4" SCH'L 80 REMOVE ± 109' 1Ø 1/0 REMOVE ± 104' 3Ø #2 ACSR REMOVE ± 172' 3Ø #2 ACSR REMOVE ± 115' 1Ø 1/0 CABLE ONE-LINE DIAGRAM 101106285SCALE: NONE WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFromTo P01 P03 3Ø #2 ACSR 3 172 P03 P05 SEC TPX 1/0 1 115 P03 P06 3Ø #2 ACSR 3 104 P03 P06 SEC TPX 1/0 1 104 Total Feet (Wire Size & Type) Removed POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P02 318419-166868 44 2 2017 PSE Equip # P04 318412-166860 35 3 2017 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P03 318427-166868 45 3 1985 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) P02 J01 4 1 188 1 2 228 714 1/0 3Ø 238 EHR270 EHR271 EHR272 J01 V01 2 1 12 33 33 1/0 1Ø 32 EHR273 P06 J01 4 1 16 1 59 374 1/0 3Ø 66 EHR274 EHR275 EHR276 REMOVAL DIAGRAM SCALE: NONE CONDUIT DIAGRAM SCALE: NONE CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48" 36" 38" 42" 42"FRONTFRONT VAULT DETAIL Not to Scale 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' THREE PHASE J-BOX AND EXCAVATION DETAIL NOT TO SCALE MID # 7663200 TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 6" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 4" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Hong Nguyen 425-449-6609 8/5/2017 Hong Nguyen 425-449-6609 8/5/2017 C.Pompeani 253-208-2665 8/5/2017 Required City of Renton The Pines at Highlands SCH'L 73 Conversion 850 Monroe Ave NE Renton, WA 98056 Designed By: PSE 101106285 AS NOTED 2 of 3 King CSPSKEIN 23N 05E 9NE 2305E033 2305E040 2305E033 PRE-11 Century Link/QWEST Comcast Renton School District MFP17004487 AØ EHR 274 BØ EHR275 CØ EHR276 AØ EHR273 AØ EHR270 BØ EHR271 CØ EHR272 101106285SCALE: 1" = 50' AFTER UNDERGROUND CIRCUIT MAP (2305E033) SCALE: 1" = 50' BEFORE UNDERGROUND CIRCUIT MAP (2305E033) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Hong Nguyen 425-449-6609 8/5/2017 Hong Nguyen 425-449-6609 8/5/2017 C.Pompeani 253-208-2665 8/5/2017 Required City of Renton The Pines at Highlands SCH'L 73 Conversion 850 Monroe Ave NE Renton, WA 98056 Designed By: PSE 101106285 AS NOTED 3 of 3 King CSPSKEIN 23N 05E 9NE 2305E033 2305E040 2305E033 PRE-11 Century Link/QWEST Comcast Renton School District MFP17004487