HomeMy WebLinkAboutP_Design_101106285_V1_170906MONROE AVE NE1
TRACT D#2 ACSR867
863
859
855
851
820
822
ABCMonroe AVE NETHE PINES AT HIGHLANDS
PRE
11
100T
T9123
100T
T9124
SITE PLAN 101106285SCALE: 1" = 20'
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Hong Nguyen 425-449-6609 8/5/2017
Hong Nguyen 425-449-6609 8/5/2017
C.Pompeani 253-208-2665 8/5/2017
Required City of Renton
The Pines at Highlands
SCH'L 73 Conversion
850 Monroe Ave NE Renton, WA 98056
Designed By: PSE
101106285
AS NOTED 1 of 3
King CSPSKEIN
23N 05E 9NE
2305E033 2305E040 2305E033 PRE-11
Century Link/QWEST Comcast Renton School District
SITE SPECIFIC NOTES
P01 318410-166868
- EXISTING POLE TO REMAIN
P02 318419-166868
- INSTALL NEW 45' CL-2 WITH GROUNDS
- INSTALL (1) 3Ø FG DEADEND ARM
- INSTALL (1) DEADEND POLE MOUNT
- INSTALL (1) DEADEND NEUTRAL
- INSTALL (1) TRI UNIT FIBERGLASS OH/UG TERMINATION
- INSTALL (3) L/I C/O FUSE @ 100T & (3) STIRRUP BOLT
- INSTALL SWITCH NUMBER T79123
- INSTALL 4" RISER CONDUIT ON NEW S/O BRACKET
- INSTALL (1) CNRC
- INSTALL (1) 7/16 PRIMARY AND 3/8 NEUTRAL DOWN GUY (NW)
- INSTALL (1) SINGLE HELIX 15'
- INSTALL GRID NUMBER 318419-166868
P03 318427-166868
- REMOVE 15kVA 120/240v 1Ø OH TRF
- REMOVE EXISTING RISER
- REMOVE STREETLIGHT
- WRECK OUT EXISTING 45' CL-3 POLE
- COMMUNICATIONS TO TRANSFER
P04 318412-166860
- INSTALL NEW 35' CL-3 SERVICE POLE
- INSTALL (1) RIGID CLEVIS
- INSTALL (1) 3" RISER ON NEW S/O BRACKET
- INSTALL GRID NUMBER 318412-166860
P05 318439-166852
- EXISTING POLE TO REMAIN
P06 318439-166868
- EXISTING POLE TO REMAIN
- INSTALL (1) TRI UNIT FIBERGLASS OH/UG TERMINATION
- INSTALL (3) L/I C/O FUSE @ 100T & (3) STIRRUP BOLT
- INSTALL SWITCH NUMBER T9124
- INSTALL 4" RISER CONDUIT ON NEW S/O BRACKET
- INSTALL (1) 7/16 PRIMARY AND 3/8 NEUTRAL DOWN GUY (SE)
- INSTALL (1) SINGLE HELIX 15'
J01 318438-166868
- INSTALL 4'-8' X 7' X 5' HH WITH 2-3' SQ DPC
- INSTALL (3) 200A 15kV 4 BUSHING
- INSTALL (7) 12kV ELBOW KIT
- INSTALL (5) 12kV DUST CAPS
- INSTALL GRID NUMBER 318438-166868
V01 318436-166869
- INSTALL 36" X 42" X 38" MINI PAD WITH GROUNDS
- INSTALL 25kVA PADMOUNT TRANSFORMER
- INSTALL (1) 12kV ELBOW KIT
- INSTALL (1) 12kV DUST CAP
- INSTALL GRID NUMBER 318436-166869
SPAN NOTES
P01 TO P02
- INSTALL 3Ø #2 ACSR OH WIRE ± 75'
P01 TO P03
- REMOVE EXISTING 3Ø #2 ACSR WIRE ± 172'
P02 TO J01
- INSTALL 3Ø 1/0 OH TO UG PRIMARY CABLE ± 238'
- INSTALL CABLE TAG AØ EHR270, BØ EHR271, CØ EHR272
- INSTALL 4" SCH'L 80 CONDUIT ± 188'
- INSTALL SPARE 4" SCH'L 80 CONDUIT ± 188'
P03 TO P05
- REMOVE EXISTING OH 1/0 SECONDARY TRIPLEX WIRE ± 115'
V01 TO P04
- INSTALL 350 KCMIL UG TO OH SECONDARY TRIPLEX CABLE ± 188'
- INSTALL 3" SCH'L 80 DISCONTINUOUS CONDUIT ± 148'
P04 TO P05
- INSTALL 350 KCMIL OH SECONDARY TRIPLEX WIRE ± 50'
- RECONNECT SERVICES "855", "859", "863"
P03 TO P06
- REMOVE EXISTING 3Ø #2 ACSR OH WIRE ± 104'
- REMOVE EXISTING 1/0 OH SECONDARY TRIPLEX ± 104'
P06 TO J01
- INSTALL 3Ø 1/0 OH TO UG PRIMARY CABLE ± 66'
- INSTALL 4" SCH'L 80 CONTINUOUS CONDUIT ± 16'
- INSTALL CABLE TAG AØ EHR274, BØ EHR275, CØ EHR276
- INSTALL SPARE 4" SCH'L 80 CONDUIT ± 14'
- INSTALL 90° SWEEP AT POLE AND 10' OF 4" SCH'L 80 STUB OUT
ON S/O BRACKET WITH CAP
J01 TO V01
- INSTALL 1Ø 1/0 PRIMARY CABLE ± 32', TAP A
- INSTALL CABLE TAG AØ EHR243
- INSTALL 2" SCH'L 80 DISCONTINUOUS CONDUIT ± 12'
V01 TO P06
- INSTALL 350 KCMIL UG TO OH SECONDARY TRIPLEX CABLE ± 85'
- INSTALL 3" SCH'L 80 DISCONTINUOUS CONDUIT ± 35'
- RECONNECT SERVICES "867", "871", "880"
OVERHEAD CIRCUIT MAP (2305E040)
SCALE: 6" = 1 MILE
JOB
SITE
THE PINES AT HIGHLANDS
N
Vicinity Map
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
Hong Nguyen
425-449-6609 Cell Phone
Project Manager Contact Information:
Owner / Developer Contact Info
officeATTN:
Habour Homes
400 N. 34th St, STE 300
Seattle, WA 98103
J Waltier 206-315-8130PHONE
CABLE TV
504758367 101106285
N/A 583....
N/A 584....
N/A
N/A
N/A 108....
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Expense
Removal
OH Expense 593....
594....
UG Expense
OH Expense
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
JOB
SITE
GENERAL OVERHEAD NOTES
1) POLES, CONDUCTOR, DEVICES TO BE INSTALLED PER PSE
STANDARDS & SPECIFICATIONS.
2) POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED.
3) ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH
OR BETTER.
4) INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES.
5) INSTALL GRID NUMBERS ON ALL NEW OR EXISTING POLES AS
6) TREAT ALL FIELD-DRILLED POLE WITH COPPER NAPHTHENATE
OVERHEAD SECONDARY/PRIMARY NOTES:
PSE NOTES:
1) All work to be done per (PSE) Standard Practices.
Site Preparation - Prior to Construction, work area to be at or
near finished grade & clear of soil or construction materials which
would restrict construction access.
Equipment Access - Adequate space is to be maintained around
electrical equipment & facilities unimpeded by shrubbery, ponds,
fences, rockeries, walls, structures, etc..
4) Customer / Developer to coordinate between utilities.
2)
3)
WOOD PRESERVATIVE.
SHOWN ON SKETCH.
DEVELOPER CIVIL CONTRACTOR NOTES:
·REQUIRED TO PROVIDE AN 11' X 9' PIT AT J01.
·REQUIRED TO PROVIDE 6' X 6' WORK PIT AT V01.
·REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P02, P04, AND P06.
·REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3PH VAULTS.
·REQUIRED TO PROVIDE TRENCH ± 188' FROM P02 TO J01.
·REQUIRED TO PROVIDE TRENCH ± 148' FROM V01 TO P04.
·REQUIRED TO PROVIDE TRENCH ± 12' FROM J01 TO V01.
·REQUIRED TO PROVIDE TRENCH ± 35' FROM V01 TO P06.
·REQUIRED TO PROVIDE TRENCH ± 16' FROM J01 TO P06.
·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS &
TRENCH AT ALL TIMES.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS# 6750.6500.
** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **
CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES:
PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP
AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION
BEGINS
ALL INSPECTIONS ARE REQUIRED BY POTELCO INC
·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
INSTALL ± 85' 1Ø 350 KCMIL
INSTALL ± 66' 3Ø 1/0
INSTALL ± 188' 1Ø 350 KCMIL
INSTALL ± 238' 3Ø 1/0
INSTALL ± 33' 1Ø 1/0
INSTALL ± 75' 3Ø OF #2 ACSR
INSTALL ± 50'
1Ø 350 KCMIL
AØ EHR270
BØ EHR271
CØ EHR272
AØ EHR274
BØ EHR275
CØ EHR276
AØ EHR273
100T
T9123
100T
T9124
CUSTOMER SUPPLIED 11' x 9'
WORK PIT
CUSTOMER SUPPLIED 6' x 6'
WORK PIT
CUSTOMER SUPPLIED 4' x 4'
WORK PIT
CUSTOMER SUPPLIED
4' x 4' WORK PIT
INSTALL (2) ± 16' 4" SCH'L 80
INSTALL (1) ± 35' 3" SCH'L 80
INSTALL (2) ± 12' 4" SCH'L 80
INSTALL (1) ± 148' 3" SCH'L 80
INSTALL (2) ± 188' 4" SCH'L 80
REMOVE ± 109' 1Ø 1/0
REMOVE ± 104' 3Ø #2 ACSR
REMOVE ± 172' 3Ø #2 ACSR
REMOVE ± 115' 1Ø 1/0
CABLE ONE-LINE DIAGRAM
101106285SCALE: NONE
WIRE REMOVAL TABLE
Location
Wire Size & Type Quantity
Length
(per
conductor)RemarksFromTo
P01 P03 3Ø #2 ACSR 3 172
P03 P05 SEC TPX 1/0 1 115
P03 P06 3Ø #2 ACSR 3 104
P03 P06 SEC TPX 1/0 1 104
Total Feet (Wire Size & Type) Removed
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 318419-166868 44 2 2017 PSE Equip #
P04 318412-166860 35 3 2017
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
SITE
#
POLE DATA POLE
TEL TV FIBER TRAN RMVD ID NUMBER
GRID #HEIGHT CLASS YEAR TOPPED RMVD
P03 318427-166868 45 3 1985
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
P02 J01 4 1 188 1 2 228 714 1/0 3Ø 238 EHR270 EHR271 EHR272
J01 V01 2 1 12 33 33 1/0 1Ø 32 EHR273
P06 J01 4 1 16 1 59 374 1/0 3Ø 66 EHR274 EHR275 EHR276
REMOVAL DIAGRAM
SCALE: NONE CONDUIT DIAGRAM
SCALE: NONE
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
Standoff Bracket
15" Min Length
Conduit Clamp Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"
36"
38"
42"
42"FRONTFRONT
VAULT DETAIL
Not to Scale
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
THREE PHASE J-BOX AND EXCAVATION DETAIL
NOT TO SCALE MID # 7663200
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
6" Min
in Conduit
Schedule 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
4" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Hong Nguyen 425-449-6609 8/5/2017
Hong Nguyen 425-449-6609 8/5/2017
C.Pompeani 253-208-2665 8/5/2017
Required City of Renton
The Pines at Highlands
SCH'L 73 Conversion
850 Monroe Ave NE Renton, WA 98056
Designed By: PSE
101106285
AS NOTED 2 of 3
King CSPSKEIN
23N 05E 9NE
2305E033 2305E040 2305E033 PRE-11
Century Link/QWEST Comcast Renton School District
AØ EHR 274
BØ EHR275
CØ EHR276
AØ EHR273
AØ EHR270
BØ EHR271
CØ EHR272 101106285SCALE: 1" = 50'
AFTER UNDERGROUND CIRCUIT MAP (2305E033)
SCALE: 1" = 50'
BEFORE UNDERGROUND CIRCUIT MAP (2305E033)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Hong Nguyen 425-449-6609 8/5/2017
Hong Nguyen 425-449-6609 8/5/2017
C.Pompeani 253-208-2665 8/5/2017
Required City of Renton
The Pines at Highlands
SCH'L 73 Conversion
850 Monroe Ave NE Renton, WA 98056
Designed By: PSE
101106285
AS NOTED 3 of 3
King CSPSKEIN
23N 05E 9NE
2305E033 2305E040 2305E033 PRE-11
Century Link/QWEST Comcast Renton School District