Loading...
HomeMy WebLinkAboutP_Design_101106285_V1_170906MONROE AVE NE1 TRACT D#2 ACSR867 863 859 855 851 820 822 ABCMonroe AVE NETHE PINES AT HIGHLANDS PRE 11 100T T9123 100T T9124 SITE PLAN 101106285SCALE: 1" = 20' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Hong Nguyen 425-449-6609 8/5/2017 Hong Nguyen 425-449-6609 8/5/2017 C.Pompeani 253-208-2665 8/5/2017 Required City of Renton The Pines at Highlands SCH'L 73 Conversion 850 Monroe Ave NE Renton, WA 98056 Designed By: PSE 101106285 AS NOTED 1 of 3 King CSPSKEIN 23N 05E 9NE 2305E033 2305E040 2305E033 PRE-11 Century Link/QWEST Comcast Renton School District SITE SPECIFIC NOTES P01 318410-166868 - EXISTING POLE TO REMAIN P02 318419-166868 - INSTALL NEW 45' CL-2 WITH GROUNDS - INSTALL (1) 3Ø FG DEADEND ARM - INSTALL (1) DEADEND POLE MOUNT - INSTALL (1) DEADEND NEUTRAL - INSTALL (1) TRI UNIT FIBERGLASS OH/UG TERMINATION - INSTALL (3) L/I C/O FUSE @ 100T & (3) STIRRUP BOLT - INSTALL SWITCH NUMBER T79123 - INSTALL 4" RISER CONDUIT ON NEW S/O BRACKET - INSTALL (1) CNRC - INSTALL (1) 7/16 PRIMARY AND 3/8 NEUTRAL DOWN GUY (NW) - INSTALL (1) SINGLE HELIX 15' - INSTALL GRID NUMBER 318419-166868 P03 318427-166868 - REMOVE 15kVA 120/240v 1Ø OH TRF - REMOVE EXISTING RISER - REMOVE STREETLIGHT - WRECK OUT EXISTING 45' CL-3 POLE - COMMUNICATIONS TO TRANSFER P04 318412-166860 - INSTALL NEW 35' CL-3 SERVICE POLE - INSTALL (1) RIGID CLEVIS - INSTALL (1) 3" RISER ON NEW S/O BRACKET - INSTALL GRID NUMBER 318412-166860 P05 318439-166852 - EXISTING POLE TO REMAIN P06 318439-166868 - EXISTING POLE TO REMAIN - INSTALL (1) TRI UNIT FIBERGLASS OH/UG TERMINATION - INSTALL (3) L/I C/O FUSE @ 100T & (3) STIRRUP BOLT - INSTALL SWITCH NUMBER T9124 - INSTALL 4" RISER CONDUIT ON NEW S/O BRACKET - INSTALL (1) 7/16 PRIMARY AND 3/8 NEUTRAL DOWN GUY (SE) - INSTALL (1) SINGLE HELIX 15' J01 318438-166868 - INSTALL 4'-8' X 7' X 5' HH WITH 2-3' SQ DPC - INSTALL (3) 200A 15kV 4 BUSHING - INSTALL (7) 12kV ELBOW KIT - INSTALL (5) 12kV DUST CAPS - INSTALL GRID NUMBER 318438-166868 V01 318436-166869 - INSTALL 36" X 42" X 38" MINI PAD WITH GROUNDS - INSTALL 25kVA PADMOUNT TRANSFORMER - INSTALL (1) 12kV ELBOW KIT - INSTALL (1) 12kV DUST CAP - INSTALL GRID NUMBER 318436-166869 SPAN NOTES P01 TO P02 - INSTALL 3Ø #2 ACSR OH WIRE ± 75' P01 TO P03 - REMOVE EXISTING 3Ø #2 ACSR WIRE ± 172' P02 TO J01 - INSTALL 3Ø 1/0 OH TO UG PRIMARY CABLE ± 238' - INSTALL CABLE TAG AØ EHR270, BØ EHR271, CØ EHR272 - INSTALL 4" SCH'L 80 CONDUIT ± 188' - INSTALL SPARE 4" SCH'L 80 CONDUIT ± 188' P03 TO P05 - REMOVE EXISTING OH 1/0 SECONDARY TRIPLEX WIRE ± 115' V01 TO P04 - INSTALL 350 KCMIL UG TO OH SECONDARY TRIPLEX CABLE ± 188' - INSTALL 3" SCH'L 80 DISCONTINUOUS CONDUIT ± 148' P04 TO P05 - INSTALL 350 KCMIL OH SECONDARY TRIPLEX WIRE ± 50' - RECONNECT SERVICES "855", "859", "863" P03 TO P06 - REMOVE EXISTING 3Ø #2 ACSR OH WIRE ± 104' - REMOVE EXISTING 1/0 OH SECONDARY TRIPLEX ± 104' P06 TO J01 - INSTALL 3Ø 1/0 OH TO UG PRIMARY CABLE ± 66' - INSTALL 4" SCH'L 80 CONTINUOUS CONDUIT ± 16' - INSTALL CABLE TAG AØ EHR274, BØ EHR275, CØ EHR276 - INSTALL SPARE 4" SCH'L 80 CONDUIT ± 14' - INSTALL 90° SWEEP AT POLE AND 10' OF 4" SCH'L 80 STUB OUT ON S/O BRACKET WITH CAP J01 TO V01 - INSTALL 1Ø 1/0 PRIMARY CABLE ± 32', TAP A - INSTALL CABLE TAG AØ EHR243 - INSTALL 2" SCH'L 80 DISCONTINUOUS CONDUIT ± 12' V01 TO P06 - INSTALL 350 KCMIL UG TO OH SECONDARY TRIPLEX CABLE ± 85' - INSTALL 3" SCH'L 80 DISCONTINUOUS CONDUIT ± 35' - RECONNECT SERVICES "867", "871", "880" OVERHEAD CIRCUIT MAP (2305E040) SCALE: 6" = 1 MILE JOB SITE THE PINES AT HIGHLANDS N Vicinity Map THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" Hong Nguyen 425-449-6609 Cell Phone Project Manager Contact Information: Owner / Developer Contact Info officeATTN: Habour Homes 400 N. 34th St, STE 300 Seattle, WA 98103 J Waltier 206-315-8130PHONE CABLE TV 504758367 101106285 N/A 583.... N/A 584.... N/A N/A N/A 108.... PROJECT PHASE PWR NOTIF#ORDER# Superior UG Expense Removal OH Expense 593.... 594.... UG Expense OH Expense ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites JOB SITE GENERAL OVERHEAD NOTES 1) POLES, CONDUCTOR, DEVICES TO BE INSTALLED PER PSE STANDARDS & SPECIFICATIONS. 2) POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. 3) ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH OR BETTER. 4) INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. 5) INSTALL GRID NUMBERS ON ALL NEW OR EXISTING POLES AS 6) TREAT ALL FIELD-DRILLED POLE WITH COPPER NAPHTHENATE OVERHEAD SECONDARY/PRIMARY NOTES: PSE NOTES: 1) All work to be done per (PSE) Standard Practices. Site Preparation - Prior to Construction, work area to be at or near finished grade & clear of soil or construction materials which would restrict construction access. Equipment Access - Adequate space is to be maintained around electrical equipment & facilities unimpeded by shrubbery, ponds, fences, rockeries, walls, structures, etc.. 4) Customer / Developer to coordinate between utilities. 2) 3) WOOD PRESERVATIVE. SHOWN ON SKETCH. DEVELOPER CIVIL CONTRACTOR NOTES: ·REQUIRED TO PROVIDE AN 11' X 9' PIT AT J01. ·REQUIRED TO PROVIDE 6' X 6' WORK PIT AT V01. ·REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P02, P04, AND P06. ·REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3PH VAULTS. ·REQUIRED TO PROVIDE TRENCH ± 188' FROM P02 TO J01. ·REQUIRED TO PROVIDE TRENCH ± 148' FROM V01 TO P04. ·REQUIRED TO PROVIDE TRENCH ± 12' FROM J01 TO V01. ·REQUIRED TO PROVIDE TRENCH ± 35' FROM V01 TO P06. ·REQUIRED TO PROVIDE TRENCH ± 16' FROM J01 TO P06. ·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS & TRENCH AT ALL TIMES. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS# 6750.6500. ** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS ALL INSPECTIONS ARE REQUIRED BY POTELCO INC ·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. INSTALL ± 85' 1Ø 350 KCMIL INSTALL ± 66' 3Ø 1/0 INSTALL ± 188' 1Ø 350 KCMIL INSTALL ± 238' 3Ø 1/0 INSTALL ± 33' 1Ø 1/0 INSTALL ± 75' 3Ø OF #2 ACSR INSTALL ± 50' 1Ø 350 KCMIL AØ EHR270 BØ EHR271 CØ EHR272 AØ EHR274 BØ EHR275 CØ EHR276 AØ EHR273 100T T9123 100T T9124 CUSTOMER SUPPLIED 11' x 9' WORK PIT CUSTOMER SUPPLIED 6' x 6' WORK PIT CUSTOMER SUPPLIED 4' x 4' WORK PIT CUSTOMER SUPPLIED 4' x 4' WORK PIT INSTALL (2) ± 16' 4" SCH'L 80 INSTALL (1) ± 35' 3" SCH'L 80 INSTALL (2) ± 12' 4" SCH'L 80 INSTALL (1) ± 148' 3" SCH'L 80 INSTALL (2) ± 188' 4" SCH'L 80 REMOVE ± 109' 1Ø 1/0 REMOVE ± 104' 3Ø #2 ACSR REMOVE ± 172' 3Ø #2 ACSR REMOVE ± 115' 1Ø 1/0 CABLE ONE-LINE DIAGRAM 101106285SCALE: NONE WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFromTo P01 P03 3Ø #2 ACSR 3 172 P03 P05 SEC TPX 1/0 1 115 P03 P06 3Ø #2 ACSR 3 104 P03 P06 SEC TPX 1/0 1 104 Total Feet (Wire Size & Type) Removed POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P02 318419-166868 44 2 2017 PSE Equip # P04 318412-166860 35 3 2017 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P03 318427-166868 45 3 1985 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) P02 J01 4 1 188 1 2 228 714 1/0 3Ø 238 EHR270 EHR271 EHR272 J01 V01 2 1 12 33 33 1/0 1Ø 32 EHR273 P06 J01 4 1 16 1 59 374 1/0 3Ø 66 EHR274 EHR275 EHR276 REMOVAL DIAGRAM SCALE: NONE CONDUIT DIAGRAM SCALE: NONE CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48" 36" 38" 42" 42"FRONTFRONT VAULT DETAIL Not to Scale 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' THREE PHASE J-BOX AND EXCAVATION DETAIL NOT TO SCALE MID # 7663200 TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 6" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 4" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Hong Nguyen 425-449-6609 8/5/2017 Hong Nguyen 425-449-6609 8/5/2017 C.Pompeani 253-208-2665 8/5/2017 Required City of Renton The Pines at Highlands SCH'L 73 Conversion 850 Monroe Ave NE Renton, WA 98056 Designed By: PSE 101106285 AS NOTED 2 of 3 King CSPSKEIN 23N 05E 9NE 2305E033 2305E040 2305E033 PRE-11 Century Link/QWEST Comcast Renton School District AØ EHR 274 BØ EHR275 CØ EHR276 AØ EHR273 AØ EHR270 BØ EHR271 CØ EHR272 101106285SCALE: 1" = 50' AFTER UNDERGROUND CIRCUIT MAP (2305E033) SCALE: 1" = 50' BEFORE UNDERGROUND CIRCUIT MAP (2305E033) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Hong Nguyen 425-449-6609 8/5/2017 Hong Nguyen 425-449-6609 8/5/2017 C.Pompeani 253-208-2665 8/5/2017 Required City of Renton The Pines at Highlands SCH'L 73 Conversion 850 Monroe Ave NE Renton, WA 98056 Designed By: PSE 101106285 AS NOTED 3 of 3 King CSPSKEIN 23N 05E 9NE 2305E033 2305E040 2305E033 PRE-11 Century Link/QWEST Comcast Renton School District