Loading...
HomeMy WebLinkAboutP_Design_101101184_V1_170907SCOPE OF WORK OVERHEAD CONSTRUCTION 9S, COMBINATION J -BOX & TOTAL UNDERGROUND TRANSFORMER h� INSTALL NEW 120/240v POWER SUPPLY FOR AMI NETWORK UNIT. POLES & STRUCTURES ABBREVIATION KEY TO �■ ti ANKH ANCHOR S� PADMOUNT SWITCH GENERAL - POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. UNLESS OTHERWISE NOTED, BRKT BRACKET Q EXISTING PSE POLE 0 NEW PSE POLE X ALL POLE LOCATION MEASUREMENTS ARE FROM THE ROAD SIDE FACE OF THE POLE. CHG CHANGE 1 FUSED DISCONNECT: 10T, 15T, 25T, 40T, 100T I I NORMAL OPEN (N.O.) - ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES OF ALL PSE - ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH, OR BETTER. DO CL CLASS ® NEW OVERHEAD TO UNDERGROUND CABLE TERMINATION SOLID ® 8"_10" STANDARDS ARE AVAILABLE UPON REQUEST. NOT SET A LOWER CLASS POLE THAN SPECIFIED. C/N COMMON NEUTRAL CABLE SPLICE QM PRIMARY METERING - WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION MATERIALS, - INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. CU COPPER — — — — THREE PHASE THREE WIRE/CABLE 7.2 kV — EXIST 115KV CONDUCTOR EQUIPMENT AND PACKING SHALL BE REMOVED DAILY. - INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH. C/0 CUTOUT REMOVE CONDUCTOR - RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE TO PSE, - STRAIGHTEN EXISTING POLES AS INDICATED OR AS NECESSARY. DE DEADEND TELEPHONE FACILITIES —G—G— NATURAL GAS FACILITIES —W—W— WATER LINES AND MAINS STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY IT IS REMOVED - TREAT ALL FIELD -DRILLED POLES WITH COPPER NAPTHENATE WOOD PRESERVATIVE. DISC DISCONNECT I FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS. -REMOVE OLD POLES AFTER COMMUNICATION COMPANIES HAVE TRANSFERRED OFF AND DBL DOUBLE - RETURN ALL STREET LIGHTS, AREA LIGHTS AND FLOODLIGHTS TO PSE. RETURN TO PSE STOREROOM. FILL AND CROWN POLE HOLES AND RESTORE AREA SIMILAR TO DA DOUBLE ARM - PROVIDE FOR EROSION AND SEDIMENT CONTROL PER PSE STANDARD 0150.3200 AND ADJACENT LANDSCAPING. DDE DOUBLE DEADEND 6" COMPACTED LAYERS ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. DWN GUY DOWN GUY I 10%+2' INSTALL PER POLE O.H. CONDUCTORS & EQUIPMENT E EAST 6" I I I I I 2 BEARING PLATES (MATL.ID #89688) IIVST INSTALL 1 SEE STD. PRAC. PRECONSTRUCTION - TRANSFER ALL OVERHEAD AND UNDERGROUND PRIMARY, SECONDARY AND SERVICE LATL LATERAL CRUSHED ROCK / 2124.3145 CONDUCTORS TO NEW POLES SET, UNLESS OTHERWISE INDICATED ON THIS SKETCH. LB LOADBREAK OR SELECTED BACKFILL -NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, ORAS - TRANSFER EXISTING TRANSFORMERS TO NEW POLES UNLESS OTHERWISE INDICATED ON THIS SKETCH. MT MOUNT REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK IN RIGHT-OF-WAY - USE STIRRUPS TO CONNECT ALL OVERHEAD AND UNDERGROUND PRIMARY TAPS, AND NEUT NEUTRAL INVOLVING A PERMIT. TRANSFORMERS. INSTALL AT ALL SITES BEING WORKED WITHIN THE SCOPE OF THE PROJECT WHERE N NORTH 1+ - ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM OPERATIONS A THEY ARE CURRENTLY MISSING. OH OVERHEAD MINIMUM OF 48 HOURS IN ADVANCE. - USE 397 AAC AND AMPACT CONNECTORS FOR ALL BARE CONDUCTOR FEEDER JUMPERS AND PH PHASE DETAIL - NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE. 600 AMP SWITCH JUMPERS. INSTALL TREE WIRE CONDUCTOR FOR JUMPERS ON ALL POLES PTP POLE TOP PIN WORK DRAWINGS AND DOCUMENTS THAT ARE DOUBLE DEADENDED WITH TREE WIRE. PRI PRIMARY POLE SETTING IN ALLUVIAL SOIL - APPLY GRIT INHIBITOR ON ALL AMPACT, STIRRUP, AND DEAD-END CONNECTIONS. RELOC RELOCATE NO SCALE - FIELD DESIGN CHANGES SHALL BE APPROVED BY PSE PROJECT MANAGER OR ENGINEER. - CONNECT PRIMARY TAPS AND TRANSFORMERS TO SAME PHASE AS EXISTING UNLESS REPL REPLACE THIS METHOD IS REQUIRED IN POOR SOIL WHERE TALL POLES, HEAVY EQUIPMENT, - MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE OTHERWISE SHOWN ON THE DRAWING. REMV REMOVE HEAVY GUYED POLES OR LONG SPANS ARE ENCOUNTERED. INFORMATION IN RED ON FOREMAN'S COPY OF WORKSKETCH. -ALL NEUTRAL CONNECTIONS TO BE MADE WITH SOLID COMPRESSION CONNECTORS. RIC RIGID CLEVIS PREPARE A HOLE LARGE ENOUGH TO ALLOW FOR 8" TO 10" OF BACKFILL AROUND THE POLE. - RETURN ONE FOREMAN'S COPY OF WORKSKETCH TO PROJECT MANAGER AT COMPLETION OF JOB. CONNECT ALL POLE GROUNDS TO COMMON NEUTRAL. ( - USE LOAD -INTERRUPTER CUTOUTS WITH ARC SHIELDS ON ALL PRIMARY OVERHEAD AND SVC SGL SERVICE SINGLE FILL BOTTOM 12" OF HOLE WITH CRUSHED ROCK OR AVAILABLE SELECTED BACKFILL. - WHEN PERMITS ARE REQUIRED, A COPY SHALL BE AVAILABLE ON WORK SITE AT ALL TIMES. UNDERGROUND TAPS WITH FUSED PROTECTION ABOVE 40T. SA SINGLE ARM CENTER POLE IN HOLE. SAFETY - INSTALL WILDLIFE PROTECTORS ON ALL TRANSFORMERS PER STANDARD 6015.2000. S SOUTH IALS SHOWN ABOVE IN ILLUSTRATION AND COMPACT WITH A MECHANICAL TAMPER. SWBD SWITCH BOARDS - REFER TO PSE STANDARDS 6275.3000 AND 6275.6000 FOR SYSTEM GROUND REQUIREMENTS. SW GRDS SWITCH GROUNDS - REFER TO PSE STANDARDS 6275.9050 FOR PERSONAL PROTECTIVE GROUNDING REQUIREMENTS. SWITCH NUMBER - REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND BARRICADING TAN TAN TANGENT REQUIREMENTS. TE TEL /TELEVISION - PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND RELEASED AT THE TERM M TERMMINATIINATI ON END, OF EACH WORK DAY, OR AS OTHERWISE INSTRUCTED BY THE SYSTEM OPERATOR. X-FER TRANSFER - PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH PERMIT XFMR TRANSFORMER REGULATIONS. XMSN TRANSMISSION - UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS NECESSARY AND IN TRIPLEX CONFORMANCE WITH LOCAL TRAFFIC REGULATIONS. UG UNDERGROUND - MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY. W W WEST W/ WITH VERT VERTICAL .101 L G. -.;.B 100T SrE P:1k.. • ',• •• • • ;•• C- 1B .....: r 25 is .00• one ill �40T B rI _ A _ �. Sk —see5 '_ ` �o PRE Cmemo'sWN 0 ` ,f- ■, S� �• ?. - C: C •.■•meeag - • 31 - /40T ,�'i s� . ,1 A.: :• �.L 15T 65T ; :� A one • S 25 ....�- ��.•......: ST ; =V :� •� 142: ■........ST3 ii sA Nib a 40T . B• • JB FN p Ai q�s� • 25T r. :co NElse so-so: •we SST �.... • . y........ •, a. • .30 A C.w III�25T A so : X623 d•.•Px •• A 896 •••• GaF ••. B p 003561 A e� 65T •...,.• ••X8 25Tt OOT X5491 M Si 10T ^100T 450KVARR` --map 04263 '�,9 25K 45 3S� ... .• aw t's ' :'p.. s. r ■ 1f�. T • .,ti - ` 4 ,Co..01 AO C.I N.O. A ''' C0 .• h''••. OPEN 1 J@ j ; 'C A •• ®: Be'4� y o �E''''••' 1k B9. .,s'T L Xl 25T Xfi735 A,e ; •..;..w, �„ — q. _ 30 X6987 " d wasseseeememem `C`.tX676 7C : 1 OOT 25T 6:1• ms .X8805 � A B- seems A/ a: 40T X, �— FWD ��X5 , ���o� : B ..,,•.45 I 1 •• 16 GD ; 30 1 ••' Project 40TH :154 •••.•, • . ` • • • - •' •• Location '•41.00- -& 3 = -'� C' :`" :A NY 38 PARK p ''9 . ••• 65T' _ '••. ■• - a X1518 B -•.•••.B • • •B 4�T S asses -1 869606630 C.- C.B,C SE X58 ' . ■. .� •. 65T 40T :...A ROL :•s je.......:• ... �• ••••••• X3539 ry 25T AO : 17 S" SE !60 ST 00• Q1\,.' 100T - A — -- -- -- • A OPEN ClSE 159 PL ' 159 .sww•w-wwwwwwas .iaw selbee•... •. - ges 3 OVERHEAD CIRCUIT MAP 2305-E-088 NOT TO SCALE _"".I, 100 ELECTRONIC MARKER 9S, COMBINATION J -BOX & TOTAL UNDERGROUND TRANSFORMER h� COMBINATION J -BOX & PADMOUNT TRANSFORMER �'C Pam FA-] TO �■ ti I 2] 4 OOD '•� °M ILI 1.1 �G ■ map! a _r. •�i► 31 O#W Cake _T 2_3 N • \ ; T 22N - - L S o q 3 2 6 LAKE YO(/A47S ' NATEgSHEO LAKE YOUNGS -CJTY OF SEATTLE• � Uniiay • , RAE -- ``J �� YATEASHEO . / vCITYSEATTLEa - - - - J r — Vicinity Map EQ ELECTRONIC MARKER J ❑ COMBINATION J -BOX & TOTAL UNDERGROUND TRANSFORMER J A COMBINATION J -BOX & PADMOUNT TRANSFORMER F❑ EXISTING TOTAL UNDERGROUND TRANSFORMER (T.U.T.) FA-] EXISTING PADMOUNT TRANSFORMER �■ NEW UNDERGROUND TRANSFORMER (T.U.T.) NEW PADMOUNT TRANSFORMER S� PADMOUNT SWITCH © PULL VAULT HANDHOLE Q EXISTING PSE POLE 0 NEW PSE POLE X REMOVED PSE POLE 0 SOLID BLADE DISCONNECT 1 FUSED DISCONNECT: 10T, 15T, 25T, 40T, 100T I I NORMAL OPEN (N.O.) WNO WILL NOT PHASE (WNO) EXIST OVERHEAD TO UNDERGROUND CABLE TERMINATION SOLID ® NEW OVERHEAD TO UNDERGROUND CABLE TERMINATION SOLID ® EXIST OVERHEAD TO UNDERGROUND CABLE TERMINATION FUSED 1111I NEW OVERHEAD TO UNDERGROUND CABLE TERMINATION FUSED -oll FAULT INDICATOR CABLE SPLICE QM PRIMARY METERING --- SINGLE PHASE THREE WIRE/CABLE 120/240V -- SINGLE PHASE ONE WIRE/CABLE 7.2 kV — — — — THREE PHASE THREE WIRE/CABLE 7.2 kV — EXIST 115KV CONDUCTOR - NEW TRENCHING — — — — - NEW OVERHEAD CONDUCTOR REMOVE CONDUCTOR DOWN GUY SPAN GUY -� PUSH BRACE —T—T— TELEPHONE FACILITIES —G—G— NATURAL GAS FACILITIES —W—W— WATER LINES AND MAINS CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES "Locates Required" Yes El No® "Outages Required" Yes X No❑ "Flagging Required" Yes X I N _ ...... _. f , eb 15445 15473 `N 15449 1 15453 5457 15477 15481 o� 11 U 317173-167448 3gc 1007 �7 X3538 317172-167448 14012 317153-167467 '3967 ( 14008 317143-167458 15601 `l 14007 317131-167 9 15607 / 1548 z\ 1 15486 15490 15494 15485 Q 317190-167490 15kVA 120/240v \ 39 -6' 14016 cM�c c� 14010 -�d 317157-1 ~ D 317148-167484 / 37.5kVA 1201240V ............ _..___......... 14015 317142-167485 15622 15613 `\•\` �� 317119-167477 50kVA 1201240v 14011 / 15648 15632 13930 15619 �. `` •� `rF o`.- "....317114-167489 13936 15625 \ 13942 317104-167465 15631 317104-167466 37.5kVA 120/240v 13948 317103-167465 �K \ 14006 13931 13941 15805 15809 317074-167402 37.5kVA 120/240v VA o� 14007 14013 15637 1 15643 / 14012 14022 317087-167489 50kVA 120/240v 167482 i 1 68THsr 15706 15649 pgGN 14068 317123-167541 100T X3539 14048 14058 Ile- 14038 312122-167544 ABCN 14030 /A 2Q ' 317088-1675 317088-167521 ............... ............... 25kVA 120/240v - .:r , -"" 317088-167529 S U rn M 14039 14063 14025 14019 317022-167531 14031 f ; (t 14059 317068-167522 15812 g1 37.5kVA 1201240V ` 4AAAA t t r f1 51 7098-167552 CONSTRUCTION NOTES P01 (317140 - 167511) 3ti INSTALL NEW AMI NETWORK UNIT PER STANDARD 0700.8525. INSTALL NEW RIGID CLEVIS SOUTHEAST (6015.1000) INDNRC. 317198' 75kV, P02 (317126 - 167535) I INSTALL NEW RIGID CLEVIS NORTHWEST (6015.1000) INDNRC. INSTALL APPROXIMATELY 130' OF #1/0 TRIPLEX FROM TRANSFORMER TO P02. CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES "Locates Required" Yes ❑ No® "Outages Required" Yes No El "Flagging Required" Yes [K No El 15713 15707 i` 15712 15720 15721 { ... ,' _.� �.. - 15726 ___3171622-1675611"." 17162-167561 50kVA 120/240v --3171 2-167562 15729 15709 C �``• 15732 15725 / 509 15740 15734 =` 15741 • ` ' -`" -_- _ 15735 � ,` �,- _..._"............',.. 15748 15750 y 145-1675 15743 317139-167590 \ 15652 317140-167511 15756 `. ` l 75kVA 1201240v \ ........._ 15749 15754 15656 %+ 15751 15760 15757 \ . ....... _...... �, �f 15762 �'p 15759 317128-167591 15768 ........... ._.. 15765 ; ; 15766 15660 .'v = � ^4d 317126-167535 15767 25kVA 1201240v 15773 - 15772 317118 167509""`-- 317117-167562 317115-167 3 1 .', ` 50kVA 120/240v 37.5kVA 120/240v 14243 15657 15781 V It 14237 lY 1' 14231 15653 15789 1f. 14219 14225 15649 pgGN 14068 317123-167541 100T X3539 14048 14058 Ile- 14038 312122-167544 ABCN 14030 /A 2Q ' 317088-1675 317088-167521 ............... ............... 25kVA 120/240v - .:r , -"" 317088-167529 S U rn M 14039 14063 14025 14019 317022-167531 14031 f ; (t 14059 317068-167522 15812 g1 37.5kVA 1201240V ` 4AAAA t t r f1 51 7098-167552 CONSTRUCTION NOTES P01 (317140 - 167511) 3ti INSTALL NEW AMI NETWORK UNIT PER STANDARD 0700.8525. INSTALL NEW RIGID CLEVIS SOUTHEAST (6015.1000) INDNRC. 317198' 75kV, P02 (317126 - 167535) I INSTALL NEW RIGID CLEVIS NORTHWEST (6015.1000) INDNRC. INSTALL APPROXIMATELY 130' OF #1/0 TRIPLEX FROM TRANSFORMER TO P02. CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES "Locates Required" Yes ❑ No® "Outages Required" Yes No El "Flagging Required" Yes [K No El