Loading...
HomeMy WebLinkAboutP_Design_105086273_V1_17090854' 77'BENSON DR STALBOT RD S"1523" VIC 16 54' 77' 4X4 WORK PIT 4X4 WORK PIT (1) RUN 350 SEC TPX, ± 112' 1-3" SCH'L 40 DISCONTINUOUS CONDUIT, ± 77' 1 SPAN 1/0 SEC OH TPX, ± 54' SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: SHEETAL DATTA P.O. BOX 5414 KENT, WA 98064 SIMREN (253)335-8690 105086273THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE CIRCUIT ONE-LINE DIAGRAM ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE VIC-16 2017 239 196 226 -1.46 - 239 197.46 226 HP Svc/MSA HP Main Distribution Job Order Temporary Removal Relocation Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/AN/A N/AN/A 101107503504914629 N/AN/A N/AN/A N/AN/A N/AN/A 105086273504789853 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT FEET ADDED: 0' 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3200SQ. 200AMPS GAS 10KW 115A 2.4% 3.5% 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE HONEYSETT 253-245-0883 david.honeysett@pse.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP DAVE HONEYSETT N/A 08/24/17 DAVE HONEYSETT N/A 08/24/17 N/A N/A N/A J. REIBMAN N/A 08/24/17 REQUIRED RENTON TALBOT INSTALL I SPAN OH OF SEC & UG PERM SERVICE 1523 TALBOT RD S, RENTON, WA 98055 N/A N/A N/A 105086273 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SE SEC 19 N/A N/A 2305E076 2305E076 2305E076 VIC-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SCALE: 1" = 50' 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr SCALE: NONE METER DETAIL @ M01, M02, & M03 CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic P01 -EXISTING POLE & EQUIPMENT TO REMAIN P02 -EXISTING POLE & EQUIPMENT TO REMAIN -INSTALL NEW 1-3" RISER ON S/O BRACKETS SPAN NOTES P01 TO P02 -INSTALL 1 SPAN OF 1/0 OH SEC TPX, ± 54' P02 TO M01 -INSTALL 1-3" SCH'L 40 DISCONTINUOUS CONTUIT, ± 77' -INSTALL 1 RUN OF 350 SEC TPX, ± 112' DEVELOPER & CUSTOMER NOTES: -CUSTOMER IS RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING -CUSTOMER NEEDS TO PROVIDE PROOF OF L&I INSPECTION 72 HOURS PRIOR TO CONSTRUCTION -CUSTOMER TO PROVIDE 4'x4' WORK PIT AT P02 & M01 &86720(5723529,'(',6&217,18286&21'8,758166&+ /*5$<“ -CUSTOMER TO PROVIDE 3/8" NON POLY PULL ROPE FILTER FENCE SCALE: NONE