HomeMy WebLinkAboutP_Design_105086273_V1_17090854'
77'BENSON DR STALBOT RD S"1523"
VIC
16
54'
77'
4X4 WORK PIT
4X4 WORK PIT
(1) RUN 350 SEC TPX, ± 112'
1-3" SCH'L 40 DISCONTINUOUS CONDUIT, ± 77'
1 SPAN 1/0 SEC OH TPX, ± 54'
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
SHEETAL DATTA
P.O. BOX 5414
KENT, WA 98064
SIMREN (253)335-8690 105086273THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE SPECIFIC NOTES
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
VIC-16
2017
239 196 226
-1.46 -
239 197.46 226
HP Svc/MSA
HP Main
Distribution
Job Order
Temporary
Removal
Relocation
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
N/AN/A
N/AN/A
N/AN/A
101107503504914629
N/AN/A
N/AN/A
N/AN/A
N/AN/A
105086273504789853
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT FEET ADDED: 0'
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3200SQ.
200AMPS
GAS
10KW
115A
2.4%
3.5%
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVE HONEYSETT
253-245-0883
david.honeysett@pse.com
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DAVE HONEYSETT N/A 08/24/17
DAVE HONEYSETT N/A 08/24/17
N/A N/A N/A
J. REIBMAN N/A 08/24/17
REQUIRED RENTON
TALBOT
INSTALL I SPAN OH OF SEC & UG PERM SERVICE
1523 TALBOT RD S, RENTON, WA 98055
N/A N/A
N/A 105086273
AS NOTED 1/1
KING N/A N/A CSPSKEIN
T23N, R05E, SE SEC 19 N/A N/A
2305E076 2305E076 2305E076 VIC-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SCALE: 1" = 50'
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
SCALE: NONE
METER DETAIL @ M01, M02, & M03
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
Standoff Bracket
15" Min Length
Conduit Clamp Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
P01
-EXISTING POLE & EQUIPMENT TO REMAIN
P02
-EXISTING POLE & EQUIPMENT TO REMAIN
-INSTALL NEW 1-3" RISER ON S/O BRACKETS
SPAN NOTES
P01 TO P02
-INSTALL 1 SPAN OF 1/0 OH SEC TPX, ± 54'
P02 TO M01
-INSTALL 1-3" SCH'L 40 DISCONTINUOUS CONTUIT, ± 77'
-INSTALL 1 RUN OF 350 SEC TPX, ± 112'
DEVELOPER & CUSTOMER NOTES:
-CUSTOMER IS RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING
-CUSTOMER NEEDS TO PROVIDE PROOF OF L&I INSPECTION 72 HOURS PRIOR TO
CONSTRUCTION
-CUSTOMER TO PROVIDE 4'x4' WORK PIT AT P02 & M01
&86720(5723529,'(',6&217,18286&21'8,758166&+
/*5$<
-CUSTOMER TO PROVIDE 3/8" NON POLY PULL ROPE
FILTER FENCE
SCALE: NONE