Loading...
HomeMy WebLinkAboutP_Work_Sketch_594115161_V1_170927JOB SITE AØEGQ563 BØEGQ564 CØEGQ565 BØ30057 CØ30052 CØ30060 BREMERTON PL NE317909-167232 317963-167133 25kVA 120/240v BØ32929 317963-167133 25kVA 120/240v UNION AVE NENE 2ND STROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROWROWROWROWROW 317909-167232 BREMERTON PL NEROWROWROWROWROWROWRO W R OW ROWROWROWR OW ROWROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWGAS PHONE CABLE TV N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal TUT Retirement Job Order Distribution HP Main HP Svc/MSA PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"X X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)594115161Owner / Developer Contact Info officeATTN: PUGET SOUND ENERGY DENNIS MARTIN 425-449-7514 N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. MARTIN 425-449-7514 6/14/17 M. SANCHEZ 714-893-2405 6/14/17 L. ORTIZ 714-893-2405 6/17/17 N/A RENTON PRE-13 / B/O ELBOW REPL / O-337563 REPL B/O ELBOWS & RING OUT PRI CABLES TO FIND TRAMP 103 BREMERTON PL NE. RENTON, WA 98059 ASPLUNDH CONSTRUCTION CORP. O-337563 594115161 AS NOTED 1/1 KING FAC-SVC NW15-23N-05E 2305E058 2305E088 PRE-13 2305E058 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E088 UNDERGROUND CIRCUIT MAP SCALE: 1" = 50' MAP#: 2305E058 11312821 594115161 SITE MAP (LOCATION 2) SCALE: 1" = 50' E-Mail: Cell Phone: Project Manager Contact Information: Manager:DENNIS MARTIN 425-736-8880 DENNIS.MARTIN@PSE.COM THOMAS GUIDE 656-G2 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. SITE SPECIFIC NOTES V01 - V02 -CREW TO RING OUT CABLE TO DETERMINE SUSPECTED TRAMP IN PHASES V01 (317909-167232) **VACTOR TRUCK REQUIRED; WATER IN VAULT** -REPLACE (2) B/O ELBOWS (ELB10J) ON BØ: 32924 & 32929 PER STD 6041.1000 V02 (317963-167133) CIRCUIT FEET ADDED: NONE SITE MAP (LOCATION 1) SCALE: 1" = 50' CIRCUIT FEET ADDED: NONE