Franchise Permit: MFP17004757
IVR Number: 17004757
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:09/29/2017Applica!on Date:3344500006Parcel Number:1200 LAKE WASHINGTON BLVD N
Permit Type :10/18/2017Issue Date:Franchise
Permit Work Class:10/18/2018Expira!on Date :Minor U0lity
Job Number:105080173Franchise Type :Electric
Descrip!on:Splice into exis0ng underground facili0es for primary line extension. No pavement cuts an0cipated.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
1200
MFP17004757
Holly Powers 10/10/2017
Residence Inn by Marriott
Justin Johnson 10-18-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
1200
MFP17004757
Justin Johnson
10-18-2017monday through friday
9:00 am to 3:00 pm
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
RRRRRRRR1313var.151010LK WASHINGTON BLVD NHOUSER WAY NCOULON BEACH AC RD
10STOPFLAGGE
R STOPFLAGG
ER
IP1J01P01RIGHTKEEPR4-7BONE LANEROADAHEADW2
0
-
4
100'
100'100'ROADWORKAHEADW2
0
-
1
W20-
7
A
BIKESMERGE WITHTRAFFICW4-1
B BIKELANEENDSW9-1
B ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AROADWORKAHEADW20-1V01Job#1050801731100 Lake Washington Blvd N, Renton WASeptember 25, 2017Sheet 1 of 1 ryan.honeysett@pse.com(425) 457-5381CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381SHEET IS FORMATTEDFOR 11 X 17MFP17004757
0/5
X1040 F:100T
318668-166268
DN
DN
DN
ROOF CANOPIES
ROOF TOP
PARKING
LINE OF WALL BELOW
GARAGE EXHAUST
GUARD RAIL ON CONC WALL
AT-GRADE PARKING/ BASEMENT
PARKING
ADJACENT ROOF-TOP DECK/ GUEST
ROOMS/ PORTE COCHERE
LAKE WASHINGTON BLVD.POWERLINE TO BE REMOVEDENTRY
DRIVE
NEW POLE WITH GUYS
- VERIFY WITH PSE
NEW POWER POLE -
VERIFY WITH PSE
DEMO POLE AND GUYS -
VERIFY WITH PSE
DEMO'D POWER LINES-
VERIFY WITH PSE
NEW POWER LINE ROUTING
- VERIFY WITH PSE
POWER POLE TO REMAIN -
VERIFY WITH PSE
EASEMENT TO BE
ABANDONDED = 7019 SF
EXISTING OH POWER ESMT.EXISTING OH POWER ESMT.OUTER FACE OF RTNG WALLO
U
T
E
R
F
A
C
E
O
F
R
T
N
G
W
A
L
LNEW ESMT. LINE = 1 FT. BYND E.O. LOW CANOPIESFUTURE POWERLINE
ACCESS ROAD EXTENDED
ACROSS CITY ROW
6'x6' AREA RESERVED FOR
FUTURE POLE LOCATION
MONUMENT SIGN
ELEC TRANSFORMER
5'
PSE REQ. 10' BELOW & ABOVE GRADE CLEARANCE
PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE
PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE
11
11
318689-166270
50KVA 120/240V
⅊
⅊8' SIDEWALK"1300"
HAMPTON INN
T77244
X683
X15365
X742
23' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD
8
⅊
⅊
⅊
⅊
⅊
"1100"
RESIDENCE INN
BY MARRIOTT
PSE REQ. 20' BELOW & ABOVE
GRADE CLEARANCE
22' FROM NEW SIDEWALK TO BLDG
PER THE DEVELOPER CAD
AT-GRADE PARKING/ BASEMENT
PARKING
ADJACENT ROOF-TOP DECK/ GUEST
ROOMS/ PORTE COCHERE
POWERLINE TO BE REMOVEDENTRY
DRIVE
NEW ESMT. LINE = 1 FT. BYND E.O. LOW CANOPIES6'x6' AREA RESERVED FOR
FUTURE POLE LOCATION
MONUMENT SIGN
5'
PSE REQ. 10' BELOW & ABOVE GRADE CLEARANCE
PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE
11
11 ⅊
⅊8' SIDEWALK23' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD
8
"1100"
RESIDENCE INN
BY MARRIOTT EXISTING OH POWER ESMT.EXISTING OH POWER ESMT.O
U
T
E
R
F
A
C
E
O
F
R
T
N
G
W
A
L
L
FUTURE POWERLINE
PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE
⅊
⅊
PSE REQ. 20' BELOW & ABOVE
GRADE CLEARANCE
22' FROM NEW SIDEWALK TO BLDG
PER THE DEVELOPER CAD
⅊
PSE EASEMENT AREA REQ.
⅊
ENTRY
DRIVE
5'
PSE REQ. 10'
PSE REQ. 5'
PSE REQ 5'
⅊
25'31'
37'
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
R1 RENTON LAND ACQUISITION (BGC) LLC
13647 MONTFORT DR, DALLAS, TX 75240
EMAIL: CFISHER@WIRLP.COM
CARY FISHER 1-972-934-8699 105080173THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
502789396 105080173
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this
work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work
to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project
Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible
walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be
required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer
lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and
crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:VICTOR IBARRA
1-425-429-4574
victor.ibarra@pse.com
SCALE: 1" = 30'
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-17
2015
139 68 93
27.76 27.76 27.76
166.76 95.76 120.76
509 x 1000
1.73 x 12,470 x 0.85
509,000
18337.14 27.76KW
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Vic Ibarra 425-429-574
Vic Ibarra 425-429-574
N/A N/A N/A
Boris Sidorov 425-417-4984
REQUIRED N/A - In Private Property
RESIDENCE INN BY MARRIOTT
INSTALL PRI L/E w/ 3Ø PM TRF
1100 Lake Washington Blvd N, Renton, WA 98056
PSE
N/A N/A
N/A 105080173
AS SHOWN 1 / 2
KING N/A N/A CSPSKEPM
SW 1/4 SEC5 T23 R5E N/A N/A
2305E019 2305E040 2305E019 HIG-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
CIRCUIT FEET ADDED: 20'
LRC:
% V. Drop:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
121,776
3000AMPS
Gas
509KW
293 HP1 (SOFT START)
2.9% (208v)
% Flicker:0.8% (200v)
% Flicker:0.1% (120v)
20AMPS HP2 * 208 * 0.85 = 3596 / 1000 = 3.596KW
20AMPS HP3 * 208 * 0.85 = 3596 / 1000 = 3.596KW
TOTAL = 300.192
PSE & DEVELOPER CLEARANCE
SCALE: 1" = 20'
BLDG FRONTAGE
N.T.S.
CONTRACTOR TRENCHING IN CITY OR COUNTY
OR W.S. DOT RIGHT OF WAY NOTES:
PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING
WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.
DEVELOPER / CIVIL CONTRACTOR NOTES / SEE PAGE 2 / BEFORE & AFTER MAP
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION
PER PUGET SOUND ENERGY STANDARDS# 6750.6500.
** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **
- DEVELOPER IS RESPONSIBLE TO POTHOLE AND LOCATE THE EXISTING 1-4" CONDUIT AT IP1 FOR THE NEW 3PHASE LINE EXTENSION
- DEVELOPER IS RESPONSIBLE FOR ALL EXCAVATION & RESTORATION FROM IP1 TO V01
- DEVELOPER IS REQUIRED TO PROVIDE A 4' X 4' EXCAVATION PIT AT PSE FACILITIES AT IP1
- DEVELOPER IS REQUIRED TO PROVIDE AN 11' X 11' EXCAVATION PIT AT 3 PHASE VAULT AT V01
- DEVELOPER IS REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3 PHASE VAULT AT V01
- DEVELOPER IS REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR TRENCH & VAULT PITS AT ALL TIMES.
- A PRE-CON MEETING WILL BE REQUIRED BEFORE CONSTRUCTION 15 DAYS IN ADVANCE WITH THE PSE PROJECT MANAGER.
ELECTRICIAN NOTES / SEE PAGE 2 / VAULT DETAIL AT V01.
- ELECTRICIAN IS RESPONSIBLE TO PROVIDE CONDUIT & 8 RUNS OF 500KCMIL & 4 RUNS 500KCMIL NEUTRAL WIRE
FROM THE NEW METER / BLDG TO V01
PSE / POTELCO INC NOTES:
- POTELCO INC WILL INSTALL 1-4" SCH'L 80 PVC COUPLING & BENDS AT 1P1.
- POTELCO INC WILL INSTALL 1-4" SCH'L 80 PVC CONDUIT BELL END AT V01.
- POTELCO INC WILL INSTALL 25' OF 1-4" SCH'L 80 PVC GRAY CONDUIT FROM IP1 TO V01
- POTELCO INC WILL PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE FROM J01 TO V01
- PSE/POTELCO INC WILL PROVIDE THE 3 PHASE VAULT AT V01
PSE / POTELCO INC SITE
SPECIFIC NOTES
J01: GRID# 318670 - 166265
- EXISTING 575 J-BOX VAULT
- INSTALL 3 - ELBOW KIT
V01: (Job# 105080173 Charge to Marriott Project 3-19B)
- INSTALL 7' x 7' x 4' w/60" x 24" ACCESS w/8' SQ COVER MAT ID# 7917901
- INSTALL 750kVA 3PH PM 120/208v MAT ID# 6258300
- INSTALL 3 - ELBOW KIT
- CONNECT 8 RUNS OF 500KCMIL & 4 RUNS 500KCMIL NEUTRAL WIRE
- INSTALL GRID# 318670 - 166269
PSE / POTELCO INC SPAN NOTES
SEE VAULT TABLE PG - 2 / 2.
PSE / POTELCO INC DUCT & VAULT
1P1 - V01
,167$//´6&+
/39&&21'8,7 COUPLING
,167$//'(*5((6&+
/%(1'
- INSTALL 1 - 4" SCH'L 80 PVC CONDUIT BELL END
,167$//
´6&+
/39&&21'8,7
PSE & DEVELOPER CLEARANCE
SCALE: 1" = 20'
National Electric Safety Code (NESC) compliance.
During construction you must maintain a working clearance of 10 feet or more - depending on voltage - from any power lines.
This is required by state law.
WAC 296-54-529
Overhead electrical lines clearance.
One of the following conditions must exist in work areas where equipment or machines are operated near electrical distribution and transmission lines:
(1) The lines have been deenergized and visibly grounded at the point of work;
(2) Insulating barriers that are not a part of or an attachment to the equipment or machinery are erected to prevent physical contact with the lines; or
(3) All of the following requirements are met:
Line VoltageRequired minimum clearance between lines and any part of equipment or machine(a)50 kV or belowten feet(b)over 50 kVten feet plus 0.4 inch for each 1 kV over
50 kV, or twice the length of the line insulator, but never less than ten feet For equipment or machinery in transit with no load and any boom or extended equipment lowered:(c)50 kV or belowfour
feet(d)50-345 kVten feet(e)345-750 kVsixteen feet(4) Someone must be designated to observe proper clearance and to give timely warning for all operations where it is difficult for the operator to
see well enough to maintain the clearance.
(5) All overhead wires shall be considered energized unless the line owner or the electrical utility authorities ensure that it is not an energized line and has been visibly grounded.
(6) Special precautions must be taken to prevent trees from falling into power lines. The employer must notify the power company immediately if a felled tree makes contact with any power line.
Before falling any tree that appears will hit a power line, the employer must notify the power company. If a tree does contact a power line, all employees must remain clear of the area until the
power company ensures that there is no electrical hazard.
PSE EASEMENT
SCALE: 1" = 20'
MFP17004757
3PH FUT. XFMR
120/208v
EHC640-A
EHC641-B
EHC642-C
0/5
X1040 F:100T
318668-166268
EHI103-A
EHI104-B
EHI105-C
EHI100-A
EHI101-B
EHI102-C
10' CLEARANCE
EX. 60' 1-4"
NEW 25' 1-4"8' SIDEWALK⅊⅊
⅊
NEW CABLE TAG
EX. CABLE TAG
EX. CABLE TAG
4' X 4' PIT
11' X 11' PIT
⅊
"1100"
RESIDENCE INN
BY MARRIOTT
"1300"
HAMPTON INN
105080173THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
OVERHEAD CIRCUIT MAP
N.T.S.
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Vic Ibarra 425-429-574
Vic Ibarra 425-429-574
N/A N/A N/A
Boris Sidorov 425-417-4984
REQUIRED N/A - In Private Property
RESIDENCE INN BY MARRIOTT
INSTALL PRI L/E w/ 3Ø PM TRF
1100 Lake Washington Blvd N, Renton, WA 98056
PSE
N/A N/A
N/A 105080173
AS SHOWN 2 / 2
KING N/A N/A CSPSKEPM
SW 1/4 SEC5 T23 R5E N/A N/A
2305E019 2305E040 2305E019 HIG-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE
SCALE: NONE
Excavated Dirt Pile
Final Grade
24" Min
Backfill for Schedule 40 Conduit
(NO Rocks over 10" Diameter
or foreign objects)Separation
4" Min
18" Min
48"
Max
36"
Min
Cover
Phone & TV Primary Power Cable
in Customer Provided
Schedule 40 Conduit
ROADSIDE
To Excavated Dirt Pile
SCALE:1"=30'
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
7'-0"
4'-0"
1'
4'-8"
SCALE: NONE
EXISTING VAULT & EXCAVATION DETAIL AT J01
CONDUIT
LOCATION Size Qty Design BENDS PULL PULL Cable Design Cable Numbers
from to (in)
Length
(ft)90°45°22°11°(lbs)
Rev
(lbs)Size
Length
(ft)A B C Manufacturer Year
PRIMARY CABLE
Please Record
INSTALL PRIMARY CABLE & CONDUIT TABLE
VAULT & EQUIPMENT TABLE
Site Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-Complete
LB DC
J01 318670
166265
*
Matid: *3
V01 318670
166269
750KVA 120/208V
Matid: 6258300 3
7' x 7' x 4' w/60" x 24"
ACCESS W/8' SQ COVER
Matid: 7917901
ASBUILT INFORMATION
Additional Information
*
V01 4 1 1/0 AL JKT *J01 *1 -
3-Ø JBOX
w3-4Pos J-buses
EHC640 EHC641 EHC642
in Trench.
11'
11'TOP VIEWCustomer's service wire conduits may
enter at any corner other than the corner
where the primary cable enters the vault.
PSE Primary
Conduit
Excavation - 20 cubic yards
SIDE VIEW6" Crush Rock
3-6"4' - 8"
THE LID 2" ABOVE GROUND
4'-2"
VAULT DETAIL AT V01
NOT TO SCALE
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Transformer Install
SCHEDULE 80 GRAY PVC CONDUIT ONLY
BEFORE & AFTER UG MAP
80
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FILTER FENCE DETAIL
Not to Scale 0150.3200
6"6"
MIN
GUARD POST INSTALLATION
MIN
CONCRETE
GUARD POST LOCATIONS
XFMR
FRONT
GUARD
POSTS
3'
MIN
MIN
5'
MAX
5'
MAX
TYPICAL
3' MIN
2'-6"
5'
MAX
5'
MAX
5'
MAX
18"
MIN
5'
MAX
5'
MAX
PAINTED
YELLOW
3'-6"
6'-0"
The following styles of guard posts are approved for Puget Sound Energy transformers:
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a minimum compressive strength of 3000 psi after 28 days.
The exposed portion of the post shall be painted traffic yellow.
- 6 ft x 9 in. diameter precast steel-reinforced concrete post.
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
LENGTH
V01 - GUARD POST INSTALLATION
Not to scale 0700.1600-03
18"
PAD &
5'
MAX
5'
MAX
5'
MAX
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
18" MIN
18" MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
6775.0035 Not to scale
MFP17004757