Loading...
HomeMy WebLinkAboutMFP17004757DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17004757 IVR Number: 17004757 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:09/29/2017Applica!on Date:3344500006Parcel Number:1200 LAKE WASHINGTON BLVD N Permit Type :10/18/2017Issue Date:Franchise Permit Work Class:10/18/2018Expira!on Date :Minor U0lity Job Number:105080173Franchise Type :Electric Descrip!on:Splice into exis0ng underground facili0es for primary line extension. No pavement cuts an0cipated. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date 1200 MFP17004757 Holly Powers 10/10/2017 Residence Inn by Marriott Justin Johnson 10-18-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 1200 MFP17004757 Justin Johnson 10-18-2017monday through friday 9:00 am to 3:00 pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). RRRRRRRR1313var.151010LK WASHINGTON BLVD NHOUSER WAY NCOULON BEACH AC RD 10STOPFLAGGE R STOPFLAGG ER IP1J01P01RIGHTKEEPR4-7BONE LANEROADAHEADW2 0 - 4 100' 100'100'ROADWORKAHEADW2 0 - 1 W20- 7 A BIKESMERGE WITHTRAFFICW4-1 B BIKELANEENDSW9-1 B ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AROADWORKAHEADW20-1V01Job#1050801731100 Lake Washington Blvd N, Renton WASeptember 25, 2017Sheet 1 of 1 ryan.honeysett@pse.com(425) 457-5381CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381SHEET IS FORMATTEDFOR 11 X 17MFP17004757 0/5 X1040 F:100T 318668-166268 DN DN DN ROOF CANOPIES ROOF TOP PARKING LINE OF WALL BELOW GARAGE EXHAUST GUARD RAIL ON CONC WALL AT-GRADE PARKING/ BASEMENT PARKING ADJACENT ROOF-TOP DECK/ GUEST ROOMS/ PORTE COCHERE LAKE WASHINGTON BLVD.POWERLINE TO BE REMOVEDENTRY DRIVE NEW POLE WITH GUYS - VERIFY WITH PSE NEW POWER POLE - VERIFY WITH PSE DEMO POLE AND GUYS - VERIFY WITH PSE DEMO'D POWER LINES- VERIFY WITH PSE NEW POWER LINE ROUTING - VERIFY WITH PSE POWER POLE TO REMAIN - VERIFY WITH PSE EASEMENT TO BE ABANDONDED = 7019 SF EXISTING OH POWER ESMT.EXISTING OH POWER ESMT.OUTER FACE OF RTNG WALLO U T E R F A C E O F R T N G W A L LNEW ESMT. LINE = 1 FT. BYND E.O. LOW CANOPIESFUTURE POWERLINE ACCESS ROAD EXTENDED ACROSS CITY ROW 6'x6' AREA RESERVED FOR FUTURE POLE LOCATION MONUMENT SIGN ELEC TRANSFORMER 5' PSE REQ. 10' BELOW & ABOVE GRADE CLEARANCE PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE 11 11 318689-166270 50KVA 120/240V ⅊ ⅊8' SIDEWALK"1300" HAMPTON INN T77244 X683 X15365 X742 23' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD 8 ⅊ ⅊ ⅊ ⅊ ⅊ "1100" RESIDENCE INN BY MARRIOTT PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE 22' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD AT-GRADE PARKING/ BASEMENT PARKING ADJACENT ROOF-TOP DECK/ GUEST ROOMS/ PORTE COCHERE POWERLINE TO BE REMOVEDENTRY DRIVE NEW ESMT. LINE = 1 FT. BYND E.O. LOW CANOPIES6'x6' AREA RESERVED FOR FUTURE POLE LOCATION MONUMENT SIGN 5' PSE REQ. 10' BELOW & ABOVE GRADE CLEARANCE PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE 11 11 ⅊ ⅊8' SIDEWALK23' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD 8 "1100" RESIDENCE INN BY MARRIOTT EXISTING OH POWER ESMT.EXISTING OH POWER ESMT.O U T E R F A C E O F R T N G W A L L FUTURE POWERLINE PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE ⅊ ⅊ PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE 22' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD ⅊ PSE EASEMENT AREA REQ. ⅊ ENTRY DRIVE 5' PSE REQ. 10' PSE REQ. 5' PSE REQ 5' ⅊ 25'31' 37' SITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: R1 RENTON LAND ACQUISITION (BGC) LLC 13647 MONTFORT DR, DALLAS, TX 75240 EMAIL: CFISHER@WIRLP.COM CARY FISHER 1-972-934-8699 105080173THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 502789396 105080173 PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X E-Mail: Cell Phone: Project Manager Contact Information: Manager:VICTOR IBARRA 1-425-429-4574 victor.ibarra@pse.com SCALE: 1" = 30' CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-17 2015 139 68 93 27.76 27.76 27.76 166.76 95.76 120.76 509 x 1000 1.73 x 12,470 x 0.85 509,000 18337.14 27.76KW DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Vic Ibarra 425-429-574 Vic Ibarra 425-429-574 N/A N/A N/A Boris Sidorov 425-417-4984 REQUIRED N/A - In Private Property RESIDENCE INN BY MARRIOTT INSTALL PRI L/E w/ 3Ø PM TRF 1100 Lake Washington Blvd N, Renton, WA 98056 PSE N/A N/A N/A 105080173 AS SHOWN 1 / 2 KING N/A N/A CSPSKEPM SW 1/4 SEC5 T23 R5E N/A N/A 2305E019 2305E040 2305E019 HIG-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CIRCUIT FEET ADDED: 20' LRC: % V. Drop: Sq. Footage: Panel Size: Heat Type: Est. Demand: 121,776 3000AMPS Gas 509KW 293 HP1 (SOFT START) 2.9% (208v) % Flicker:0.8% (200v) % Flicker:0.1% (120v) 20AMPS HP2 * 208 * 0.85 = 3596 / 1000 = 3.596KW 20AMPS HP3 * 208 * 0.85 = 3596 / 1000 = 3.596KW TOTAL = 300.192 PSE & DEVELOPER CLEARANCE SCALE: 1" = 20' BLDG FRONTAGE N.T.S. CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. DEVELOPER / CIVIL CONTRACTOR NOTES / SEE PAGE 2 / BEFORE & AFTER MAP CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS# 6750.6500. ** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** - DEVELOPER IS RESPONSIBLE TO POTHOLE AND LOCATE THE EXISTING 1-4" CONDUIT AT IP1 FOR THE NEW 3PHASE LINE EXTENSION - DEVELOPER IS RESPONSIBLE FOR ALL EXCAVATION & RESTORATION FROM IP1 TO V01 - DEVELOPER IS REQUIRED TO PROVIDE A 4' X 4' EXCAVATION PIT AT PSE FACILITIES AT IP1 - DEVELOPER IS REQUIRED TO PROVIDE AN 11' X 11' EXCAVATION PIT AT 3 PHASE VAULT AT V01 - DEVELOPER IS REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3 PHASE VAULT AT V01 - DEVELOPER IS REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR TRENCH & VAULT PITS AT ALL TIMES. - A PRE-CON MEETING WILL BE REQUIRED BEFORE CONSTRUCTION 15 DAYS IN ADVANCE WITH THE PSE PROJECT MANAGER. ELECTRICIAN NOTES / SEE PAGE 2 / VAULT DETAIL AT V01. - ELECTRICIAN IS RESPONSIBLE TO PROVIDE CONDUIT & 8 RUNS OF 500KCMIL & 4 RUNS 500KCMIL NEUTRAL WIRE FROM THE NEW METER / BLDG TO V01 PSE / POTELCO INC NOTES: - POTELCO INC WILL INSTALL 1-4" SCH'L 80 PVC COUPLING & BENDS AT 1P1. - POTELCO INC WILL INSTALL 1-4" SCH'L 80 PVC CONDUIT BELL END AT V01. - POTELCO INC WILL INSTALL 25' OF 1-4" SCH'L 80 PVC GRAY CONDUIT FROM IP1 TO V01 - POTELCO INC WILL PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE FROM J01 TO V01 - PSE/POTELCO INC WILL PROVIDE THE 3 PHASE VAULT AT V01 PSE / POTELCO INC SITE SPECIFIC NOTES J01: GRID# 318670 - 166265 - EXISTING 575 J-BOX VAULT - INSTALL 3 - ELBOW KIT V01: (Job# 105080173 Charge to Marriott Project 3-19B) - INSTALL 7' x 7' x 4' w/60" x 24" ACCESS w/8' SQ COVER MAT ID# 7917901 - INSTALL 750kVA 3PH PM 120/208v MAT ID# 6258300 - INSTALL 3 - ELBOW KIT - CONNECT 8 RUNS OF 500KCMIL & 4 RUNS 500KCMIL NEUTRAL WIRE - INSTALL GRID# 318670 - 166269 PSE / POTELCO INC SPAN NOTES SEE VAULT TABLE PG - 2 / 2. PSE / POTELCO INC DUCT & VAULT 1P1 - V01 ,167$//´6&+ /39&&21'8,7 COUPLING ,167$//ƒ'(*5((6&+ /%(1' - INSTALL 1 - 4" SCH'L 80 PVC CONDUIT BELL END ,167$// ´6&+ /39&&21'8,7 PSE & DEVELOPER CLEARANCE SCALE: 1" = 20' National Electric Safety Code (NESC) compliance. During construction you must maintain a working clearance of 10 feet or more - depending on voltage - from any power lines. This is required by state law. WAC 296-54-529 Overhead electrical lines clearance. One of the following conditions must exist in work areas where equipment or machines are operated near electrical distribution and transmission lines: (1) The lines have been deenergized and visibly grounded at the point of work; (2) Insulating barriers that are not a part of or an attachment to the equipment or machinery are erected to prevent physical contact with the lines; or (3) All of the following requirements are met: Line VoltageRequired minimum clearance between lines and any part of equipment or machine(a)50 kV or belowten feet(b)over 50 kVten feet plus 0.4 inch for each 1 kV over 50 kV, or twice the length of the line insulator, but never less than ten feet For equipment or machinery in transit with no load and any boom or extended equipment lowered:(c)50 kV or belowfour feet(d)50-345 kVten feet(e)345-750 kVsixteen feet(4) Someone must be designated to observe proper clearance and to give timely warning for all operations where it is difficult for the operator to see well enough to maintain the clearance. (5) All overhead wires shall be considered energized unless the line owner or the electrical utility authorities ensure that it is not an energized line and has been visibly grounded. (6) Special precautions must be taken to prevent trees from falling into power lines. The employer must notify the power company immediately if a felled tree makes contact with any power line. Before falling any tree that appears will hit a power line, the employer must notify the power company. If a tree does contact a power line, all employees must remain clear of the area until the power company ensures that there is no electrical hazard. PSE EASEMENT SCALE: 1" = 20' MFP17004757 3PH FUT. XFMR 120/208v EHC640-A EHC641-B EHC642-C 0/5 X1040 F:100T 318668-166268 EHI103-A EHI104-B EHI105-C EHI100-A EHI101-B EHI102-C 10' CLEARANCE EX. 60' 1-4" NEW 25' 1-4"8' SIDEWALK⅊⅊ ⅊ NEW CABLE TAG EX. CABLE TAG EX. CABLE TAG 4' X 4' PIT 11' X 11' PIT ⅊ "1100" RESIDENCE INN BY MARRIOTT "1300" HAMPTON INN 105080173THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) OVERHEAD CIRCUIT MAP N.T.S. ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Vic Ibarra 425-429-574 Vic Ibarra 425-429-574 N/A N/A N/A Boris Sidorov 425-417-4984 REQUIRED N/A - In Private Property RESIDENCE INN BY MARRIOTT INSTALL PRI L/E w/ 3Ø PM TRF 1100 Lake Washington Blvd N, Renton, WA 98056 PSE N/A N/A N/A 105080173 AS SHOWN 2 / 2 KING N/A N/A CSPSKEPM SW 1/4 SEC5 T23 R5E N/A N/A 2305E019 2305E040 2305E019 HIG-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE SCALE: NONE Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 4" Min 18" Min 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 40 Conduit ROADSIDE To Excavated Dirt Pile SCALE:1"=30' 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" SCALE: NONE EXISTING VAULT & EXCAVATION DETAIL AT J01 CONDUIT LOCATION Size Qty Design BENDS PULL PULL Cable Design Cable Numbers from to (in) Length (ft)90°45°22°11°(lbs) Rev (lbs)Size Length (ft)A B C Manufacturer Year PRIMARY CABLE Please Record INSTALL PRIMARY CABLE & CONDUIT TABLE VAULT & EQUIPMENT TABLE Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-Complete LB DC J01 318670 166265 * Matid: *3 V01 318670 166269 750KVA 120/208V Matid: 6258300 3 7' x 7' x 4' w/60" x 24" ACCESS W/8' SQ COVER Matid: 7917901 ASBUILT INFORMATION Additional Information * V01 4 1 1/0 AL JKT *J01 *1 - 3-Ø JBOX w3-4Pos J-buses EHC640 EHC641 EHC642 in Trench. 11' 11'TOP VIEWCustomer's service wire conduits may enter at any corner other than the corner where the primary cable enters the vault. PSE Primary Conduit Excavation - 20 cubic yards SIDE VIEW6" Crush Rock 3-6"4' - 8" THE LID 2" ABOVE GROUND 4'-2" VAULT DETAIL AT V01 NOT TO SCALE Company ID#: Primary phase connected to: Tested Secondary Voltage Transformer Install SCHEDULE 80 GRAY PVC CONDUIT ONLY BEFORE & AFTER UG MAP 80 FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 6"6" MIN GUARD POST INSTALLATION MIN CONCRETE GUARD POST LOCATIONS XFMR FRONT GUARD POSTS 3' MIN MIN 5' MAX 5' MAX TYPICAL 3' MIN 2'-6" 5' MAX 5' MAX 5' MAX 18" MIN 5' MAX 5' MAX PAINTED YELLOW 3'-6" 6'-0" The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. LENGTH V01 - GUARD POST INSTALLATION Not to scale 0700.1600-03 18" PAD & 5' MAX 5' MAX 5' MAX COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 18" MIN 18" MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 6775.0035 Not to scale MFP17004757