Loading...
HomeMy WebLinkAboutP_Design_Residence_Inn_by_Marriott_1_105080173_V1_1709290/5 X1040 F:100T 318668-166268 DN DN DN ROOF CANOPIES ROOF TOP PARKING LINE OF WALL BELOW GARAGE EXHAUST GUARD RAIL ON CONC WALL AT-GRADE PARKING/ BASEMENT PARKING ADJACENT ROOF-TOP DECK/ GUEST ROOMS/ PORTE COCHERE LAKE WASHINGTON BLVD.POWERLINE TO BE REMOVEDENTRY DRIVE NEW POLE WITH GUYS - VERIFY WITH PSE NEW POWER POLE - VERIFY WITH PSE DEMO POLE AND GUYS - VERIFY WITH PSE DEMO'D POWER LINES- VERIFY WITH PSE NEW POWER LINE ROUTING - VERIFY WITH PSE POWER POLE TO REMAIN - VERIFY WITH PSE EASEMENT TO BE ABANDONDED = 7019 SF EXISTING OH POWER ESMT.EXISTING OH POWER ESMT.OUTER FACE OF RTNG WALLO U T E R F A C E O F R T N G W A L LNEW ESMT. LINE = 1 FT. BYND E.O. LOW CANOPIESFUTURE POWERLINE ACCESS ROAD EXTENDED ACROSS CITY ROW 6'x6' AREA RESERVED FOR FUTURE POLE LOCATION MONUMENT SIGN ELEC TRANSFORMER 5' PSE REQ. 10' BELOW & ABOVE GRADE CLEARANCE PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE 11 11 318689-166270 50KVA 120/240V ⅊ ⅊8' SIDEWALK"1300" HAMPTON INN T77244 X683 X15365 X742 23' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD 8 ⅊ ⅊ ⅊ ⅊ ⅊ "1100" RESIDENCE INN BY MARRIOTT PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE 22' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD AT-GRADE PARKING/ BASEMENT PARKING ADJACENT ROOF-TOP DECK/ GUEST ROOMS/ PORTE COCHERE POWERLINE TO BE REMOVEDENTRY DRIVE NEW ESMT. LINE = 1 FT. BYND E.O. LOW CANOPIES6'x6' AREA RESERVED FOR FUTURE POLE LOCATION MONUMENT SIGN 5' PSE REQ. 10' BELOW & ABOVE GRADE CLEARANCE PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE 11 11 ⅊ ⅊8' SIDEWALK23' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD 8 "1100" RESIDENCE INN BY MARRIOTT EXISTING OH POWER ESMT.EXISTING OH POWER ESMT.O U T E R F A C E O F R T N G W A L L FUTURE POWERLINE PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE ⅊ ⅊ PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE 22' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD ⅊ PSE EASEMENT AREA REQ. ⅊ ENTRY DRIVE 5' PSE REQ. 10' PSE REQ. 5' PSE REQ 5' ⅊ 25'31' 37' SITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: R1 RENTON LAND ACQUISITION (BGC) LLC 13647 MONTFORT DR, DALLAS, TX 75240 EMAIL: CFISHER@WIRLP.COM CARY FISHER 1-972-934-8699 105080173THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 502789396 105080173 PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X E-Mail: Cell Phone: Project Manager Contact Information: Manager:VICTOR IBARRA 1-425-429-4574 victor.ibarra@pse.com SCALE: 1" = 30' CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-17 2015 139 68 93 27.76 27.76 27.76 166.76 95.76 120.76 509 x 1000 1.73 x 12,470 x 0.85 509,000 18337.14 27.76KW DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Vic Ibarra 425-429-574 Vic Ibarra 425-429-574 N/A N/A N/A Boris Sidorov 425-417-4984 REQUIRED N/A - In Private Property RESIDENCE INN BY MARRIOTT INSTALL PRI L/E w/ 3Ø PM TRF 1100 Lake Washington Blvd N, Renton, WA 98056 PSE N/A N/A N/A 105080173 AS SHOWN 1 / 2 KING N/A N/A CSPSKEPM SW 1/4 SEC5 T23 R5E N/A N/A 2305E019 2305E040 2305E019 HIG-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CIRCUIT FEET ADDED: 20' LRC: % V. Drop: Sq. Footage: Panel Size: Heat Type: Est. Demand: 121,776 3000AMPS Gas 509KW 293 HP1 (SOFT START) 2.9% (208v) % Flicker:0.8% (200v) % Flicker:0.1% (120v) 20AMPS HP2 * 208 * 0.85 = 3596 / 1000 = 3.596KW 20AMPS HP3 * 208 * 0.85 = 3596 / 1000 = 3.596KW TOTAL = 300.192 PSE & DEVELOPER CLEARANCE SCALE: 1" = 20' BLDG FRONTAGE N.T.S. CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. DEVELOPER / CIVIL CONTRACTOR NOTES / SEE PAGE 2 / BEFORE & AFTER MAP CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS# 6750.6500. ** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** - DEVELOPER IS RESPONSIBLE TO POTHOLE AND LOCATE THE EXISTING 1-4" CONDUIT AT IP1 FOR THE NEW 3PHASE LINE EXTENSION - DEVELOPER IS RESPONSIBLE FOR ALL EXCAVATION & RESTORATION FROM IP1 TO V01 - DEVELOPER IS REQUIRED TO PROVIDE A 4' X 4' EXCAVATION PIT AT PSE FACILITIES AT IP1 - DEVELOPER IS REQUIRED TO PROVIDE AN 11' X 11' EXCAVATION PIT AT 3 PHASE VAULT AT V01 - DEVELOPER IS REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3 PHASE VAULT AT V01 - DEVELOPER IS REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR TRENCH & VAULT PITS AT ALL TIMES. - A PRE-CON MEETING WILL BE REQUIRED BEFORE CONSTRUCTION 15 DAYS IN ADVANCE WITH THE PSE PROJECT MANAGER. ELECTRICIAN NOTES / SEE PAGE 2 / VAULT DETAIL AT V01. - ELECTRICIAN IS RESPONSIBLE TO PROVIDE CONDUIT & 8 RUNS OF 500KCMIL & 4 RUNS 500KCMIL NEUTRAL WIRE FROM THE NEW METER / BLDG TO V01 PSE / POTELCO INC NOTES: - POTELCO INC WILL INSTALL 1-4" SCH'L 80 PVC COUPLING & BENDS AT 1P1. - POTELCO INC WILL INSTALL 1-4" SCH'L 80 PVC CONDUIT BELL END AT V01. - POTELCO INC WILL INSTALL 25' OF 1-4" SCH'L 80 PVC GRAY CONDUIT FROM IP1 TO V01 - POTELCO INC WILL PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE FROM J01 TO V01 - PSE/POTELCO INC WILL PROVIDE THE 3 PHASE VAULT AT V01 PSE / POTELCO INC SITE SPECIFIC NOTES J01: GRID# 318670 - 166265 - EXISTING 575 J-BOX VAULT - INSTALL 3 - ELBOW KIT V01: (Job# 105080173 Charge to Marriott Project 3-19B) - INSTALL 7' x 7' x 4' w/60" x 24" ACCESS w/8' SQ COVER MAT ID# 7917901 - INSTALL 750kVA 3PH PM 120/208v MAT ID# 6258300 - INSTALL 3 - ELBOW KIT - CONNECT 8 RUNS OF 500KCMIL & 4 RUNS 500KCMIL NEUTRAL WIRE - INSTALL GRID# 318670 - 166269 PSE / POTELCO INC SPAN NOTES SEE VAULT TABLE PG - 2 / 2. PSE / POTELCO INC DUCT & VAULT 1P1 - V01 ,167$//´6&+ /39&&21'8,7 COUPLING ,167$//ƒ'(*5((6&+ /%(1' - INSTALL 1 - 4" SCH'L 80 PVC CONDUIT BELL END ,167$// ´6&+ /39&&21'8,7 PSE & DEVELOPER CLEARANCE SCALE: 1" = 20' National Electric Safety Code (NESC) compliance. During construction you must maintain a working clearance of 10 feet or more - depending on voltage - from any power lines. This is required by state law. WAC 296-54-529 Overhead electrical lines clearance. One of the following conditions must exist in work areas where equipment or machines are operated near electrical distribution and transmission lines: (1) The lines have been deenergized and visibly grounded at the point of work; (2) Insulating barriers that are not a part of or an attachment to the equipment or machinery are erected to prevent physical contact with the lines; or (3) All of the following requirements are met: Line VoltageRequired minimum clearance between lines and any part of equipment or machine(a)50 kV or belowten feet(b)over 50 kVten feet plus 0.4 inch for each 1 kV over 50 kV, or twice the length of the line insulator, but never less than ten feet For equipment or machinery in transit with no load and any boom or extended equipment lowered:(c)50 kV or belowfour feet(d)50-345 kVten feet(e)345-750 kVsixteen feet(4) Someone must be designated to observe proper clearance and to give timely warning for all operations where it is difficult for the operator to see well enough to maintain the clearance. (5) All overhead wires shall be considered energized unless the line owner or the electrical utility authorities ensure that it is not an energized line and has been visibly grounded. (6) Special precautions must be taken to prevent trees from falling into power lines. The employer must notify the power company immediately if a felled tree makes contact with any power line. Before falling any tree that appears will hit a power line, the employer must notify the power company. If a tree does contact a power line, all employees must remain clear of the area until the power company ensures that there is no electrical hazard. PSE EASEMENT SCALE: 1" = 20'