HomeMy WebLinkAboutP_Design_Residence_Inn_by_Marriott_1_105080173_V1_1709290/5
X1040 F:100T
318668-166268
DN
DN
DN
ROOF CANOPIES
ROOF TOP
PARKING
LINE OF WALL BELOW
GARAGE EXHAUST
GUARD RAIL ON CONC WALL
AT-GRADE PARKING/ BASEMENT
PARKING
ADJACENT ROOF-TOP DECK/ GUEST
ROOMS/ PORTE COCHERE
LAKE WASHINGTON BLVD.POWERLINE TO BE REMOVEDENTRY
DRIVE
NEW POLE WITH GUYS
- VERIFY WITH PSE
NEW POWER POLE -
VERIFY WITH PSE
DEMO POLE AND GUYS -
VERIFY WITH PSE
DEMO'D POWER LINES-
VERIFY WITH PSE
NEW POWER LINE ROUTING
- VERIFY WITH PSE
POWER POLE TO REMAIN -
VERIFY WITH PSE
EASEMENT TO BE
ABANDONDED = 7019 SF
EXISTING OH POWER ESMT.EXISTING OH POWER ESMT.OUTER FACE OF RTNG WALLO
U
T
E
R
F
A
C
E
O
F
R
T
N
G
W
A
L
LNEW ESMT. LINE = 1 FT. BYND E.O. LOW CANOPIESFUTURE POWERLINE
ACCESS ROAD EXTENDED
ACROSS CITY ROW
6'x6' AREA RESERVED FOR
FUTURE POLE LOCATION
MONUMENT SIGN
ELEC TRANSFORMER
5'
PSE REQ. 10' BELOW & ABOVE GRADE CLEARANCE
PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE
PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE
11
11
318689-166270
50KVA 120/240V
⅊
⅊8' SIDEWALK"1300"
HAMPTON INN
T77244
X683
X15365
X742
23' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD
8
⅊
⅊
⅊
⅊
⅊
"1100"
RESIDENCE INN
BY MARRIOTT
PSE REQ. 20' BELOW & ABOVE
GRADE CLEARANCE
22' FROM NEW SIDEWALK TO BLDG
PER THE DEVELOPER CAD
AT-GRADE PARKING/ BASEMENT
PARKING
ADJACENT ROOF-TOP DECK/ GUEST
ROOMS/ PORTE COCHERE
POWERLINE TO BE REMOVEDENTRY
DRIVE
NEW ESMT. LINE = 1 FT. BYND E.O. LOW CANOPIES6'x6' AREA RESERVED FOR
FUTURE POLE LOCATION
MONUMENT SIGN
5'
PSE REQ. 10' BELOW & ABOVE GRADE CLEARANCE
PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE
11
11 ⅊
⅊8' SIDEWALK23' FROM NEW SIDEWALK TO BLDG PER THE DEVELOPER CAD
8
"1100"
RESIDENCE INN
BY MARRIOTT EXISTING OH POWER ESMT.EXISTING OH POWER ESMT.O
U
T
E
R
F
A
C
E
O
F
R
T
N
G
W
A
L
L
FUTURE POWERLINE
PSE REQ. 20' BELOW & ABOVE GRADE CLEARANCE
⅊
⅊
PSE REQ. 20' BELOW & ABOVE
GRADE CLEARANCE
22' FROM NEW SIDEWALK TO BLDG
PER THE DEVELOPER CAD
⅊
PSE EASEMENT AREA REQ.
⅊
ENTRY
DRIVE
5'
PSE REQ. 10'
PSE REQ. 5'
PSE REQ 5'
⅊
25'31'
37'
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
R1 RENTON LAND ACQUISITION (BGC) LLC
13647 MONTFORT DR, DALLAS, TX 75240
EMAIL: CFISHER@WIRLP.COM
CARY FISHER 1-972-934-8699 105080173THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
502789396 105080173
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this
work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work
to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project
Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible
walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be
required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer
lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and
crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:VICTOR IBARRA
1-425-429-4574
victor.ibarra@pse.com
SCALE: 1" = 30'
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-17
2015
139 68 93
27.76 27.76 27.76
166.76 95.76 120.76
509 x 1000
1.73 x 12,470 x 0.85
509,000
18337.14 27.76KW
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Vic Ibarra 425-429-574
Vic Ibarra 425-429-574
N/A N/A N/A
Boris Sidorov 425-417-4984
REQUIRED N/A - In Private Property
RESIDENCE INN BY MARRIOTT
INSTALL PRI L/E w/ 3Ø PM TRF
1100 Lake Washington Blvd N, Renton, WA 98056
PSE
N/A N/A
N/A 105080173
AS SHOWN 1 / 2
KING N/A N/A CSPSKEPM
SW 1/4 SEC5 T23 R5E N/A N/A
2305E019 2305E040 2305E019 HIG-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
CIRCUIT FEET ADDED: 20'
LRC:
% V. Drop:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
121,776
3000AMPS
Gas
509KW
293 HP1 (SOFT START)
2.9% (208v)
% Flicker:0.8% (200v)
% Flicker:0.1% (120v)
20AMPS HP2 * 208 * 0.85 = 3596 / 1000 = 3.596KW
20AMPS HP3 * 208 * 0.85 = 3596 / 1000 = 3.596KW
TOTAL = 300.192
PSE & DEVELOPER CLEARANCE
SCALE: 1" = 20'
BLDG FRONTAGE
N.T.S.
CONTRACTOR TRENCHING IN CITY OR COUNTY
OR W.S. DOT RIGHT OF WAY NOTES:
PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING
WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.
DEVELOPER / CIVIL CONTRACTOR NOTES / SEE PAGE 2 / BEFORE & AFTER MAP
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION
PER PUGET SOUND ENERGY STANDARDS# 6750.6500.
** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **
- DEVELOPER IS RESPONSIBLE TO POTHOLE AND LOCATE THE EXISTING 1-4" CONDUIT AT IP1 FOR THE NEW 3PHASE LINE EXTENSION
- DEVELOPER IS RESPONSIBLE FOR ALL EXCAVATION & RESTORATION FROM IP1 TO V01
- DEVELOPER IS REQUIRED TO PROVIDE A 4' X 4' EXCAVATION PIT AT PSE FACILITIES AT IP1
- DEVELOPER IS REQUIRED TO PROVIDE AN 11' X 11' EXCAVATION PIT AT 3 PHASE VAULT AT V01
- DEVELOPER IS REQUIRED TO PROVIDE 6” CRUSH ROCK FOR 3 PHASE VAULT AT V01
- DEVELOPER IS REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR TRENCH & VAULT PITS AT ALL TIMES.
- A PRE-CON MEETING WILL BE REQUIRED BEFORE CONSTRUCTION 15 DAYS IN ADVANCE WITH THE PSE PROJECT MANAGER.
ELECTRICIAN NOTES / SEE PAGE 2 / VAULT DETAIL AT V01.
- ELECTRICIAN IS RESPONSIBLE TO PROVIDE CONDUIT & 8 RUNS OF 500KCMIL & 4 RUNS 500KCMIL NEUTRAL WIRE
FROM THE NEW METER / BLDG TO V01
PSE / POTELCO INC NOTES:
- POTELCO INC WILL INSTALL 1-4" SCH'L 80 PVC COUPLING & BENDS AT 1P1.
- POTELCO INC WILL INSTALL 1-4" SCH'L 80 PVC CONDUIT BELL END AT V01.
- POTELCO INC WILL INSTALL 25' OF 1-4" SCH'L 80 PVC GRAY CONDUIT FROM IP1 TO V01
- POTELCO INC WILL PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE FROM J01 TO V01
- PSE/POTELCO INC WILL PROVIDE THE 3 PHASE VAULT AT V01
PSE / POTELCO INC SITE
SPECIFIC NOTES
J01: GRID# 318670 - 166265
- EXISTING 575 J-BOX VAULT
- INSTALL 3 - ELBOW KIT
V01: (Job# 105080173 Charge to Marriott Project 3-19B)
- INSTALL 7' x 7' x 4' w/60" x 24" ACCESS w/8' SQ COVER MAT ID# 7917901
- INSTALL 750kVA 3PH PM 120/208v MAT ID# 6258300
- INSTALL 3 - ELBOW KIT
- CONNECT 8 RUNS OF 500KCMIL & 4 RUNS 500KCMIL NEUTRAL WIRE
- INSTALL GRID# 318670 - 166269
PSE / POTELCO INC SPAN NOTES
SEE VAULT TABLE PG - 2 / 2.
PSE / POTELCO INC DUCT & VAULT
1P1 - V01
,167$//´6&+
/39&&21'8,7 COUPLING
,167$//'(*5((6&+
/%(1'
- INSTALL 1 - 4" SCH'L 80 PVC CONDUIT BELL END
,167$//
´6&+
/39&&21'8,7
PSE & DEVELOPER CLEARANCE
SCALE: 1" = 20'
National Electric Safety Code (NESC) compliance.
During construction you must maintain a working clearance of 10 feet or more - depending on voltage - from any power lines.
This is required by state law.
WAC 296-54-529
Overhead electrical lines clearance.
One of the following conditions must exist in work areas where equipment or machines are operated near electrical distribution and transmission lines:
(1) The lines have been deenergized and visibly grounded at the point of work;
(2) Insulating barriers that are not a part of or an attachment to the equipment or machinery are erected to prevent physical contact with the lines; or
(3) All of the following requirements are met:
Line VoltageRequired minimum clearance between lines and any part of equipment or machine(a)50 kV or belowten feet(b)over 50 kVten feet plus 0.4 inch for each 1 kV over
50 kV, or twice the length of the line insulator, but never less than ten feet For equipment or machinery in transit with no load and any boom or extended equipment lowered:(c)50 kV or belowfour
feet(d)50-345 kVten feet(e)345-750 kVsixteen feet(4) Someone must be designated to observe proper clearance and to give timely warning for all operations where it is difficult for the operator to
see well enough to maintain the clearance.
(5) All overhead wires shall be considered energized unless the line owner or the electrical utility authorities ensure that it is not an energized line and has been visibly grounded.
(6) Special precautions must be taken to prevent trees from falling into power lines. The employer must notify the power company immediately if a felled tree makes contact with any power line.
Before falling any tree that appears will hit a power line, the employer must notify the power company. If a tree does contact a power line, all employees must remain clear of the area until the
power company ensures that there is no electrical hazard.
PSE EASEMENT
SCALE: 1" = 20'